国内精品♨️_妈妈乐疯狂43-艺文笔记

王金豹 2026年01月20日 07:19:31
发布于:曼谷

国内精品♨️_妈妈乐疯狂43_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Installation of the PTU Manifold CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN _______ YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO MUCH.  CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS _______  LUBRICANT.

 (1)  Remove the sealant from the mating surface of the manifold (7) and the aircraft structure with a plastic or wooden scraper.

 (2)  Clean the component interface and/or the adjacent area.

 (3)  Do an inspection of the component interface and/or the adjacent area.

 (4)  Examine the structure of the aircraft in the area of the manifold attachment for cracks, corrosion or other damage.

 (5)  Apply a layer of SEALANTS (Material No. 09-018) to the mating surface of the manifold (7).

 (6)  Put the manifold (7) in position on the aircraft and install the bolts (1) and the washers (2). Do not tighten the bolts (1).

 (7)  Remove the blanking plugs from the pipe end-fittings and the unions on the manifold (7).

 (8)  Make sure that the hydraulic line end-fittings are serviceable.

 (9)  Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of the line end-fittings.

 (10)  Connect the pipe (11) to the union (13).

 (11)  TORQUE the pipe end-fitting (12) to between 9.7 and 10.7 m.daN (71.53 and 78.90 lbf.ft).

 (12)  Connect the pipe (21) to the check valve 3093GM.

 (13)  TORQUE the pipe end-fitting (22) to between 12.9 and 14.2 m.daN

 (95.13 and 104.71 lbf.ft).

 (14)  Connect the pipe (48) to the union (50).

R 1EFF : 059-099, 102-105, 151-152, 201-206, 1 29-13-15Page 420 1 1 May 01/05 1 1 1CES 1

 (15)  TORQUE the pipe end-fitting (49) to between 1.5 and 1.7 m.daN (11.06

 (16)  Connect the pipe (3) to the reducer (5).

 (17)  TORQUE the pipe end-fitting (4) to between 5.4 and 5.9 m.daN (39.82 and 43.51 lbf.ft).

 (18)  Tighten the bolts (1).

 (19)  Make sure that the isolation coupling (45) engages correctly in the coupling half (46).

 (20)  Remove the blanking caps from the electrical connectors.

 (21)  Make sure that the electrical connectors are clean and in the correct condition.

 (22) Connect the electrical connector (29) to the PTU solenoid valve. R **ON A/C 001-049, 051-058, 101-101, R Post SB 29-1094 For A/C 001-049,051-058,101-101,  Subtask 29-13-15-560-050-D  A. Preparation of the Replacement Component  (1) Remove the components which are attached to the removed manifold (7) as follows:  (a)  Remove the PTU solenoid valve 3012GL (Ref. TASK 29-23-51-000-002).

 (b)  Remove the priority valve 3064GM (Ref. TASK 29-13-33-000-001).

 (c)  Remove the bobbins (9),(30) (Ref. TASK 20-23-21-911-001).

 (d)  Remove and discard the following items from the bobbins:

 -square section seals (10),(31),  -back-up rings (36), (37), (39), (40) and  -O-rings (35), (38).

 (e)  Put the bobbins (9),(30) into plastic bags to keep them clean.

 (f)  Remove the check valve 3093GM and discard the O-ring (23).

R 1EFF : 001-049, 051-099, 101-105, 151-152, 1 29-13-15Page 421 1201-206, 1May 01/05 1 1 1CES 1

 (g) Remove the check valve 3094GM as follows:

 1_ Cut, remove and discard the lockwire.  2_ Remove the check valve 3094GM and discard the O-rings  (15),(16) and the back-up rings (41).

 (h)  If necessary, remove and discard the lockwire from the coupling half (46) and the manifold (7).

 (i)  Remove the coupling half (46) and discard the packing (47).

 (j)  If necessary, remove the reducer (5) and discard the packing (52).

 (k)  If necessary, remove the union (13) and discard the packing (53).

 (l)  Install the blanking plugs on the open ports of the manifold (7).

 (m)  Install the blanking plugs on all of the removed components.

 (2) Install the removed components on the replacement manifold (7) as follows:  (a)  Remove the blanking plugs from the manifold (7) and the components.

 (b)  Lubricate the new O-rings and the threads of the components with HYDRAULIC FLUIDS (Material No. 02-003).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压4

原标题:
1 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 2018新浪教育盛典候选机构:巴巴姆国际少儿英语

      多位祥龙博瑞汽车园区内员工告诉记者,上述小米2S店可能会在3月底正式开业。这或意味着,小米SU7的新车会在3月底前到达该门店。
  • 欧冠十六强名单变动汇总:皇马巴萨拜仁都换了谁

      Meta没有透露将列出哪些特定世界。
  • 贾老板下周回国和ff91量产哪个更靠谱?

      自从2010年成为欧巡赛最年轻的冠军(17岁188天)以来,意大利选手经历了高尔夫的高峰与低谷。
  • 王永利:2018宏观调控更需灵活性

      “首先表白的女生很好啊。哪有只能男生先表白的道理啊?”
  • 燕之屋再闯A股:年均2亿砸广告,双12前涨价“再割”孕妇?

      当然,首席执行官的候选人远不止三位,艾迪·库伊(EddyCue)和菲尔·席勒(PhilSchiller)都有能力做同样的事情。自史蒂夫·乔布斯时代以来,两人一直在公司担任重要职务,但他们可能会被前三名击败。
  • 程实:探索中国现代化产业政策的新方向

      中国家居产业发展峰会大雁奖组委会主席魏晓飞在致辞中表示,本次大雁奖主题为“大雁归来”,这绝非一句口号,而是有两大不同。
  • 陈志龙:靠大数据炒股的时代来了

      更惨的是,网友们围绕着MEGA外观疯狂造梗。可要是撇开这些外界这些恶意调侃不谈,我们又该如何去看待理想MEGA这款产品以及这场舆论风波?
  • 英国脱欧加大中国经济下行压力

      《黄帝内经》云:“病起于过用,需防因暑取凉。”此时不宜将空调温度设置过低、风扇直吹人体、直冲冷水澡、吃生冷的食物和饮料,以免损伤阳气。养生建议多喝温热的祛火茶水、泡泡脚、敷贴三伏天、艾灸等。
  • USDA:3月份公布的全球豆粕供需平衡表

      新酷产品第一时间免费试玩,还有众多优质达人分享独到生活经验,快来新浪众测,体验各领域最前沿、最有趣、最好玩的产品吧~!下载客户端还能获得专享福利哦!
  • 王心凌与姐妹结伴体检拍美照 享受健康美食心情佳

      家装行业的成本结构多年来没有出现明显的优化和进步,走访的5省6市35家品牌装企,在成本结构上大致相同,企业毛利率和净利率差别不大。
  • 投资黄金产品的三种目的

      另外,在教育进入追求优质均衡的新时代背景下,如何让老师在尽力备好课、上好课的基础上,能更好地照顾到每个孩子的个性化需求,因材施教,这很重要。如果每位老师要面对和管理的孩子太多,就难以满足学生个性化需求。所以我建议将小学的生师比调到13:1,让小学教育从规模发展走向内涵发展。同时,调整生师比也有利于缓解大班额问题,减轻教师负担。
  • 新华社:女排精神不朽! 里约奥运写下新传奇

      没有长辈,没有领导们的场合之下,一些小露肉小性格的fancy短裙就可以尝试起来了。暗酒红色的灯芯绒面料非常高质感,在抹胸肩颈处涉及的仿动物毛毛领增添一股暖冬来。
  • 黄金涨势有所停滞 短期面临回调风险

      除此之外,此前和中国人寿通过共同出资成立私募基金的方式加大对权益市场投资,也备受市场关注。日前,私募证券投资基金已经完成了产品备案,在业内人士看来,已经具备入市条件,并且后续无疑为市场注入了一股强大的长期资金。
  • 经济学家喊话欧洲央行:别再跟随美联储了 赶紧独立行动

      强大的中央银行是金融强国的核心支柱。由于关键货币的国际信用具有极其重要的影响,其中央银行在某种程度上类似于全球的中央银行。强大的货币与强大的中央银行之间相辅相成,强大的货币是本国中央银行成为全球具有重要影响力的中央银行的基础和前提,而本国中央银行的强大信用和有效管理则成为强大的货币的支撑和保证。20世纪80年代初,我国建立了中央银行制度,并颁发了《中国人民银行法》等一系列相应的法律法规来加以规范。40年来我国中央银行制度从无到有不断完善,中央银行在稳定经济增长、保持币值稳定、有效控制金融风险和平衡国际收支等目标上发挥十分关键的作用。建立强大而完善的中央银行是未来的重要任务。一是完善货币供应调控机制,形成中央银行调节银行货币创造的流动性、资本和利率约束的长效机制。二是构建金融有效支持实体经济的体制机制,在宏观层面搞好跨周期政策设计,以现代化的货币管理促进经济高质量发展。三是建设推进金融双向开放的相关机制,提高参与国际金融治理能力,积极参与国际金融规划的制定。