天堂岛精品🔇_国产精品天天夜夜91-艺文笔记

王金豹 2026年01月20日 01:11:53
发布于:曼谷

天堂岛精品🔇_国产精品天天夜夜91_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Engine 1(2) Fire Extinguishing Circuit - Schematic  Figure 006  1EFF :  ALL  1  26-21-00 Page 20  1  1  Nov 01/03  1  1  1CES  1

 When you press the TEST pushbutton switch, the FIRE warning indications are triggered and you check the condition of the fire extinguishing system:  - on the AGENT 1 and AGENT 2 pushbutton switches:  . lighting of the SQUIB legend,  (only if the two filaments are normally power supplied)  . lighting of the amber DISCH legend, (checking of the lamps only).  -electrical supply of the two filaments of each cartridge  NOTE : Although only one filament is sufficient to enable the firing of ____ the cartridge, the test will be positive only if the two filaments are electrically supplied. The test current is limited to 80 mA by the test module whereas the firing current is 5A.  If the failure is detected during the test sequence, a fault message comes into view in the ECAM (For example ENG 1 (2) LOOP A(B) FAULT).

 B. Built-In Test Equipment (BITE)

 This function is specified in the ATA chapter 26-12-00 (Para. 8.  BITE/Test).

 C. Test of the Pressure Switch (Ref. Fig. 007)  The pressure switch on the fire extinguisher bottle has a manual test device. An hexagonal wrench is required to do the test.  The manual test checks the condition of the electrical contact. Rotation of the test screw opens the contact (continuity between pins 1 and 3): the DISCH legend on the AGENT 1(2) comes on.  In the rest position, the DISCH legend goes off.  NOTE : P > minimum pressure = continuity between pins 2 and 3 ____  P < minimum pressure = continuity between pins 1 and 3.

 Pressure Switch of the Fire Extinguisher Bottle  Figure 007  1EFF :  ALL  1  26-21-00 Page 23  1  1  Nov 01/03  1  1  1CES  1

 ENGINE FIRE EXTINGUISHING - DEACTIVATION/REACTIVATION _____________________________________________________  TASK 26-21-00-040-001  Bottle Pressure Check  1. Reason for the Job __________________  Refer to the MMEL TASK: 26-21-01  Engine Fire Extinguishing  Agent 1 & 2 "DISCH" Light

 2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific blanking caps  No specific circuit breaker(s) safety clip(s)

R  No specific multimeter No specific warning notice No specific Allen wrench (3/32 in. hex key) No specific access platform 1.6 m (5 ft. 3 in.)  B. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- R 26-12-00-710-001 Operational Check of Loop/Squib 26-21-41-280-001 Weight Check of the Engine Fire-Extinguisher Bottle (6WE1,6WE2,8WE1,8WE2) 26-21-00-991-006 Fig. 401

 3. Job Set-up __________

 Subtask 26-21-00-865-054  A. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 6WE1, 6WE2  121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B 2WE1 Q44 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A 1WE1 Q43  FOR 8WE1, 8WE2 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B 2WE2 Q42 121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A 1WE2 Q41  Subtask 26-21-00-941-063  B. Safety Precautions  (1)  On the center pedestal, on the ENG panel 115VU:

 (a) Put a warning notice to tell persons not to start the engine.

 (2)  Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.

 (3)  On the overhead maintenance panel 50VU:

 (a)  Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.

 (b)  Put a warning notice to tell persons not to energize the FADEC 1(2).

 (4) Put the access platform in position below the pylon. Subtask 26-21-00-010-065  C. Get Access  (1)  FOR 6WE1, 8WE1   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FIRE PROTECTION 防火2

原标题:
79 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 有点东西!苹果版“余额宝”上线 年利率高达4.15%

      对于大模型产品来说,最重要的仍旧是通过技术解决用户需求的能力,自ChatGPT横空出世以来,无数人都认为大模型产品将改变整个互联网的生产逻辑,但未来的进程似乎要远慢于我们的期望。
  • 特朗普称Facebook是“人民公敌”

      超聚变一直是资本市场的热词之一,其自带“华为+算力”的双光环,一旦有新消息出来,知名游资、机构、外资也坐不住。
  • 北京——阳光城梵悦108丨楼盘测评

      走进大金塔,它和银塔给人的感觉完全不同。银塔圣洁到极致,让人不敢轻易靠近;金塔远看就是金光闪闪,耀眼夺目。山门气势很足,一路往上走,根本移不开眼睛。台阶两侧是蜿蜒的巨龙,各有五个龙头。那金色似镶嵌了宝石一般,熠熠生辉。
  • 我军最强机型同时部署东海方向 歼20歼16数量超60架

      上述家居新品不仅仅是企业对品质消费和美好人居生活的庄严承诺,更是推动大家居建装行业走向更加繁荣和可持续发展的重要一步。
  • 这个春日,去无锡鼋头渚赴一场樱花之约

      只要AI应用层爆发不断,推理需求向平民化演进,对于底层算力的需求就不会停止。从这方面说,袁进辉瞄准的是一个大生意。
  • 「Red Tights」正成为辣妹冬日造型首选?

      2023年4月,虎头局渣打饼行的总部大楼里,被拖欠款项的供应商拿走了这里所有能换成钱的东西,此时距离虎头局“单店估值过亿”的神话仅仅过去了600天。
  • 申银万国:中美关系牵动市场 消息作用价格大幅波动

      新需求牵引新供给,新消费呼唤新服务。如今,很多老年游客乐于接受新事物,体验新玩法,更加追求旅游品质。过去那种“上车睡觉,下车拍照”的跟团游早已不能满足需求。老年人出游时间灵活、人生阅历丰富,更在意景观价值和文化内涵,看重旅游过程中的情感互动、康养和研学体验,对历史型、观光型、怀旧型旅游更有兴趣,也更重视性价比与舒适度。针对这些特点,更好开发完善高品质旅行产品,安排具有社交属性的活动,提供更加舒适化的体验,才能不断改善银发族的旅游体验。
  • OPPO将发布首款竖向小折叠屏手机

      金融强国中国特色的第二个要义是人民性。实现金融强国奋斗目标,必须坚定不移地以习近平新时代中国特色社会主义思想为指导,深刻把握金融工作的政治性、人民性。以金融队伍的纯洁性、专业性、战斗力为重要支撑,以全面加强监管,防范化解风险为基础保障,突出三个重点。一是坚持为实体经济服务、为国家战略服务,加大力度持续支持高新技术产业、战略性新兴产业和高端制造业发展,有效支撑国家重点工程建设。二是坚持为民营经济服务。金融监管部门应对国有企业和民营企业一视同仁,综合运用资本、流动性、集中度、拨备等监管工具,引导金融机构优化资源配置和考核激励机制,推动金融产品和服务创新,增强科技赋能,提升民营企业金融服务水平,进一步强化“三农”的金融服务供给,持续完善薄弱环节的金融服务。三是加快普惠金融体系建设,持续提升低收入群体和中小微企业的金融可得性,降低其融资成本,缩小贫富差距,提高我国收入分配的公平性。
  • 痴情叔:女生说:给你介绍女朋友吧,是几个意思?

      在我看来,要培养创新型人才,首先要保护好孩子们自身的特质、天性,比如好奇心、看待世界的独特见解和视角。创新人才不是按照一个模子能够培养出来的。
  • 重庆一官员被双开:购买私存反动杂志 传政治谣言

      二、可转债转股价格修正条款与可能触发情况
  • 佘诗曼素颜出镜气色好 单手扶脸低头浅笑超迷人

      两位选手在延长赛中都有机会。延长赛一直在630码,收官五杆洞进行。第一次加洞,布莱斯-加里特错过12英尺小鸟推。第二次加洞,埃里克-巴恩斯推入了15英尺小鸟推,而布莱斯-加里特推入6英尺推杆追平了他。
  • 餐饮企业“加盟潮”为何卷土重来

      对公司股权结构不产生重大影响,公司控股股东和实际控制人不会发生变化,不会导致公司股权分布不具备上市条件。(行权后的股本结构表以中国证券登记结算有限责任公司深圳分公司实际登记为准)。
  • 我的刘海 她的刘海好像不一样?

      怎么拯救泛黄暗沉的肌肤?