国产自拍👅_乱仑家庭电影-艺文笔记

王金豹 2026年01月19日 06:55:12
发布于:曼谷

国产自拍👅_乱仑家庭电影_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

R TASK 24-22-00-810-823 R Failure of the GLC 1 or Loss of its Status Indication R 1. Possible Causes _______________ R - GCU-1 (1XU1) R - RELAY (20XU) R - GLC-1 (9XU1) R - wiring R 2. Job Set-up Information ______________________ R A. Referenced Information R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R ------------------------------------------------------------------------------- R AMM 24-22-34-000-001 R AMM 24-22-34-400-001 R AMM 24-22-55-000-001 R AMM 24-22-55-400-002 R R AMM 24-41-00-740-002 R ASM 24-22/02 R 3. Fault Confirmation __________________ R A. Test Removal of the GCU-1(2) (1XU1, 1XU2) Installation of the GCU-1(2) (1XU1, 1XU2) Removal of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Installation of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Operational Check of GAPCU via CFDS

R (1) Do the BITE test of the GAPCU (Ref. AMM TASK 24-41-00-740-002).

R (a) If the BITE test gives the message TEST FAILED: R - do the trouble shooting given in Para 4.A. R (b) If the BITE test gives the message TEST PASSED:

R - do the trouble shooting given in Para 4.B. R 4. Fault Isolation _______________ R A. If the BITE test gives the message TEST FAILED: R - push the line key adjacent to the TEST FAILED message.

R (1) If the maintenance message GCU1 (1XU1) comes into view: R - replace the GCU-1 (1XU1) (Ref. AMM TASK 24-22-34-000-001) and (Ref. R AMM TASK 24-22-34-400-001).

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : 401-499, ∞∞24-22-00∞∞∞∞∞∞∞∞∞∞Page 265  Aug 01/05 CES

R  B. If the BITE test gives the message TEST PASSED:  R  - do a check of the wiring (Ref. ASM 24-22/02) for an open circuit  R  between:  R  . pin 2 of the ELEC/GCU1 circuit breaker (2XU1) and pin A/B of the  R  function relay (20XU)  R  . pin A/3 of the function relay and pin B/18 of the GLC 1 (9XU1)  R  . pin B/20 of the GLC 1 and pin A/29 of the diode module module 2420VD  R  . pin A/14 of the diode module 2420VD and pin A/6A of the GCU 1.  R  - do a check of the contacts for correct operation of the function relay  R  (20XU) and the GLC 1 (9XU1) (Ref. ASM 24-22/02) between:  R  . pins A/B and A/3 of the function relay (normally closed)  R  . pins B/18 and B/20 of the GLC 1 (normally closed).  R  (1) If the wiring or the contacts are not correct:  R  - repair or replace the wiring as necessary  R  - replace the RELAY (20XU) as necessary  R  - replace the GLC-1 (9XU1) (Ref. AMM TASK 24-22-55-000-001) and (Ref.  R  AMM TASK 24-22-55-400-002) as necessary.  R  (2) If the wiring or the contacts are correct:  R  - replace the GCU-1 (1XU1) (Ref. AMM TASK 24-22-34-000-001) and (Ref.  R  AMM TASK 24-22-34-400-001).  R  C. Do the test given in para. 3.

R TASK 24-22-00-810-824

R Failure of the GLC 2 or Loss of its Status Indication R 1. Possible Causes _______________ R - GCU-2 (1XU2) R - GLC-2 (9XU2) R - wiring R 2. Job Set-up Information ______________________ R A. Referenced Information R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R ------------------------------------------------------------------------------- R AMM 24-22-34-000-001 R AMM 24-22-34-400-001 R AMM 24-22-55-000-001 R AMM 24-22-55-400-002 R R AMM 24-41-00-740-002 R ASM 24-22/03 R 3. Fault Confirmation __________________ R A. Test Removal of the GCU-1(2) (1XU1, 1XU2) Installation of the GCU-1(2) (1XU1, 1XU2) Removal of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Installation of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Operational Check of GAPCU via CFDS

R (1) Do the BITE test of the GAPCU (Ref. AMM TASK 24-41-00-740-002).

R (a) If the BITE test gives the message TEST FAILED: R - do the trouble shooting given in Para 4.A. R (b) If the BITE test gives the message TEST PASSED:

R - do the trouble shooting given in Para 4.B. R 4. Fault Isolation _______________ R A. If the BITE test gives the message TEST FAILED: R - push the line key adjacent to the TEST FAILED message.

R (1) If the maintenance message GCU2 (1XU2) comes into view: R - replace the GCU-2 (1XU2) (Ref. AMM TASK 24-22-34-000-001) and (Ref. R AMM TASK 24-22-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 电源 3

原标题:
21 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 张杰剧场后台过惊喜生日 与谢娜喝交杯酒甜蜜满满

      或扫码关注“国际学校家长圈”公众号后台咨询
  • 生物机器人,不只是机器人那么简单

      3月11日,棕榈股份股价涨停。界面新闻拨通公司证券部电话询问市场关注的超聚变相关事宜,相关工作人员表示,公司没有收到相关事项,需要再进一步核实。随后公司在互动平台回应称,目前公司及控股股东并未涉及或筹划与“超聚变”公司相关的传闻事宜;公司始终秉持积极、开放的态度,寻求未来业务转型发展的“第二曲线”,如有涉及公告事宜会及时予以披露。
  • 意甲女排焦点战米兰2

      为更好地满足广大投资者的理财需求,根据景顺长城基金管理有限公司(以下简称“本公司”)与上海陆金所基金销售有限公司(以下简称“陆基金”)签署的委托销售协议,自2024年3月12日起新增委托陆基金销售景顺长城纳斯达克科技市值加权交易型开放式指数证券投资基金发起式联接基金(QDII),具体的业务流程、办理时间和办理方式以陆基金的规定为准。现将相关事项公告如下:
  • 2023年全国帆板冠军赛青锦赛在北海落幕

      (声明:本文仅代表作者观点,不代表新浪网立场。)
  • 冠军助力,深度体验顾家家居一体化整家

      2016年5月,有消息称苹果开始对电动汽车充电桩感兴趣。2017年,《纽约时报》再度确认苹果停止整车开发;然后库克公开回应,称苹果正在进行无人驾驶技术方面的研发。
  • 缪斯乐队新专辑获英国榜冠军 成其第六张冠军大碟

      作为理想汽车旗下的首款MPV及纯电车型,MEGA仅有55.98万元一个版本,不过李想坚信这款车型将成为公司的下一个热销产品,并有决心在50万元以上的市场中夺取销量第一的地位,挑战单月8000辆的惊人销量。
  • 还在追锥子脸? “宽屏”林允周冬雨教你秒扮清纯

      S4赛季整体开放时间为2022/10/14~2022/11/27,初始17天将会带来以下更新内容。并将带来全新玩法“超人快跑”,以及全新盲盒和宠物角色,另有超多福利活动和赛季通行证等你探索,一起来看看吧!
  • 神秘三叶虫具有罕见的“超级复眼”!

      一名参与了谈判的人员说:“不是我们不愿意做100元以上的付费尝试,实在是我们购买版权的能力有限,没办法和对方谈拢,对方想要的版权成本,和我们想像的版权成本根本不是一个量级的。我们这边没法承诺PPV的数量,也付不出大版权费用的情况下,也就拿不到版权。”
  • 乌克兰将不再续约!不会允许俄罗斯天然气继续输往欧洲

      根据数据网站的统计,在3月9日CS新版本再次打破了之前创造的在线玩家记录,昨天共有1,525,069名CSer登陆游戏,创下历史新高。
  • 曼联为18岁小将梅努涨薪3倍 周薪达到6万英镑

      更不用说,理想汽车过往一直引以为傲的“油箱”这次被拿掉了。这势必导致不少对于电动车接受度没那么高的保守型用户,基于补能焦虑放弃选择MEGA。而理想引以为傲的5C超级充电由于总数有限,用户在试驾过程中也往往无法对充电速度进行体验。
  • 任泽平:美联储缩表速度可能会慢于预期

      1、金科地产集团股份有限公司(以下简称“公司”)及合并报表范围内控股子公司(以下简称“控股子公司”)对外担保总额超过最近一期净资产100%、对资产负债率超过70%的控股子公司担保的金额超过公司最近一期净资产50%,以及对合并报表外参股公司审批的担保金额超过最近一期净资产30%,提请投资者充分关注担保风险。
  • 热烈祝贺鹏大新材料再次荣膺“中国十大品牌”称号

      过去一年,‘暗涌Waves’总共发布了81篇文章。
  • 宝爸陪产,孩子出生后的一幕让他反应强烈

      在泾源县大湾乡杨岭村,习近平2016年曾经问过的小男孩,如今已经13岁,上小学六年级。他告诉记者,他们家在2017年已经建了新的浴室,还装上浴霸,洗澡不仅不是问题,而且还更加舒适方便,与城里无异。△习近平2016年曾经问过的小男孩,如今已经13岁,他们家修建了新浴室
  • 白银投资新手应该知道的11条忠告

      会议现场,来自新疆各行业、各领域的多名代表分享感人故事和切身经历,展现新疆人权事业的发展进步。与会代表表示,实践表明,新疆的人权事业发展符合中国国情、新疆实际,符合各族人民的热切期盼,更符合《世界人权宣言》基本精神。新疆人权事业的路子对不对,各族人民心里最清楚。新疆的人权状况好不好,各族人民最有发言权。