天堂岛精品🔇_久久久久久一区二区三区四区别墅-艺文笔记

王金豹 2026年01月19日 03:53:15
发布于:曼谷

天堂岛精品🔇_久久久久久一区二区三区四区别墅_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

R TASK 24-22-00-810-823 R Failure of the GLC 1 or Loss of its Status Indication R 1. Possible Causes _______________ R - GCU-1 (1XU1) R - RELAY (20XU) R - GLC-1 (9XU1) R - wiring R 2. Job Set-up Information ______________________ R A. Referenced Information R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R ------------------------------------------------------------------------------- R AMM 24-22-34-000-001 R AMM 24-22-34-400-001 R AMM 24-22-55-000-001 R AMM 24-22-55-400-002 R R AMM 24-41-00-740-002 R ASM 24-22/02 R 3. Fault Confirmation __________________ R A. Test Removal of the GCU-1(2) (1XU1, 1XU2) Installation of the GCU-1(2) (1XU1, 1XU2) Removal of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Installation of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Operational Check of GAPCU via CFDS

R (1) Do the BITE test of the GAPCU (Ref. AMM TASK 24-41-00-740-002).

R (a) If the BITE test gives the message TEST FAILED: R - do the trouble shooting given in Para 4.A. R (b) If the BITE test gives the message TEST PASSED:

R - do the trouble shooting given in Para 4.B. R 4. Fault Isolation _______________ R A. If the BITE test gives the message TEST FAILED: R - push the line key adjacent to the TEST FAILED message.

R (1) If the maintenance message GCU1 (1XU1) comes into view: R - replace the GCU-1 (1XU1) (Ref. AMM TASK 24-22-34-000-001) and (Ref. R AMM TASK 24-22-34-400-001).

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : 401-499, ∞∞24-22-00∞∞∞∞∞∞∞∞∞∞Page 265  Aug 01/05 CES

R  B. If the BITE test gives the message TEST PASSED:  R  - do a check of the wiring (Ref. ASM 24-22/02) for an open circuit  R  between:  R  . pin 2 of the ELEC/GCU1 circuit breaker (2XU1) and pin A/B of the  R  function relay (20XU)  R  . pin A/3 of the function relay and pin B/18 of the GLC 1 (9XU1)  R  . pin B/20 of the GLC 1 and pin A/29 of the diode module module 2420VD  R  . pin A/14 of the diode module 2420VD and pin A/6A of the GCU 1.  R  - do a check of the contacts for correct operation of the function relay  R  (20XU) and the GLC 1 (9XU1) (Ref. ASM 24-22/02) between:  R  . pins A/B and A/3 of the function relay (normally closed)  R  . pins B/18 and B/20 of the GLC 1 (normally closed).  R  (1) If the wiring or the contacts are not correct:  R  - repair or replace the wiring as necessary  R  - replace the RELAY (20XU) as necessary  R  - replace the GLC-1 (9XU1) (Ref. AMM TASK 24-22-55-000-001) and (Ref.  R  AMM TASK 24-22-55-400-002) as necessary.  R  (2) If the wiring or the contacts are correct:  R  - replace the GCU-1 (1XU1) (Ref. AMM TASK 24-22-34-000-001) and (Ref.  R  AMM TASK 24-22-34-400-001).  R  C. Do the test given in para. 3.

R TASK 24-22-00-810-824

R Failure of the GLC 2 or Loss of its Status Indication R 1. Possible Causes _______________ R - GCU-2 (1XU2) R - GLC-2 (9XU2) R - wiring R 2. Job Set-up Information ______________________ R A. Referenced Information R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R ------------------------------------------------------------------------------- R AMM 24-22-34-000-001 R AMM 24-22-34-400-001 R AMM 24-22-55-000-001 R AMM 24-22-55-400-002 R R AMM 24-41-00-740-002 R ASM 24-22/03 R 3. Fault Confirmation __________________ R A. Test Removal of the GCU-1(2) (1XU1, 1XU2) Installation of the GCU-1(2) (1XU1, 1XU2) Removal of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Installation of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Operational Check of GAPCU via CFDS

R (1) Do the BITE test of the GAPCU (Ref. AMM TASK 24-41-00-740-002).

R (a) If the BITE test gives the message TEST FAILED: R - do the trouble shooting given in Para 4.A. R (b) If the BITE test gives the message TEST PASSED:

R - do the trouble shooting given in Para 4.B. R 4. Fault Isolation _______________ R A. If the BITE test gives the message TEST FAILED: R - push the line key adjacent to the TEST FAILED message.

R (1) If the maintenance message GCU2 (1XU2) comes into view: R - replace the GCU-2 (1XU2) (Ref. AMM TASK 24-22-34-000-001) and (Ref. R AMM TASK 24-22-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 电源 3

原标题:
71 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 2018戊戌狗年150克方形金币价格(2018年11月09日)

      灰熊方面,GG-杰克逊30分6篮板3助攻,贾伦-杰克逊16分,拉拉维亚13分4助攻。
  • 50年追踪11000个孩子:经常与爸爸相处的孩子更聪明

      3月7日,豫能控股也被投资者在互动平台追问,“作为河南国资的控股公司,请问是否与超聚变有直接或间接的合作?是否有借壳上市的计划以改善本公司常年的亏损?”对此,这家由河南财政厅实际控制的上市公司回应称,“公司暂未与超聚变有直接或间接的合作”,公司目前主营业务仍为火力发电。
  • 美元走势前景遭泼冷水,黄金欲借FED官员的“乌鸦嘴”翻身

      第二排配有电动腿托,第三排最大拥有1010mm的腿部空间,座椅坐垫长517mm,不论是第二排,还是第三排,地台都做到了纯平地,让后排乘客坐姿更自然更舒服。
  • 基本面已经改善,金价将继续走高

      欢喜过年文化味浓,传统文化出彩出新。据了解,天津、山东、湖南、贵州的非遗大集买年货,安徽“皖美过大年”等文化惠民活动蓬勃开展,新春灯会、舞龙表演、庙会市集、非遗秀场等活动成为游客新春出游的重要选择。北京故宫博物院、国家博物馆、四川三星堆博物馆等持续火爆,多地文博场馆围绕龙年主题开展了“博物馆里阖家游”“春节游览学知识”等特色活动,受到观众欢迎。
  • 年轻女孩正“加入洞门”,Crocs借势卖爆了

      换言之,AIAgent是AI产品更成熟的形态,它真正的使命就在于将AI能力封装化,让C端、B端用户都能更便捷更直观的运用,从而助力生产力的解放。如果说大模型产品只能被动的接收-生成,那么Agent的使命要复杂的多,它更类似智能助手,需要借助自身的AI能力帮助使用者解决切实问题。
  • 这种曾被无数科学家放弃的疗法,让接近死亡的她重获新生

      南京大学长江产业经济研究院助理研究员凌永辉:
  • 过去五年欧洲主要武器进口数量激增

      随后,即便有京东、苏宁易购、菜鸟等智能柜品牌零星出现,也仍未撼动巨头位置。2021年,丰巢再次获得4亿美元战略融资,截至当年上半年时已投放超27万组。
  • 保障“现金兜底”、打通重要交通枢纽支付“堵点”……商业银行广泛响应,进一步提升支付便利性

      对于目前出现的问题,吉利银河西安国利体验中心市场总监表示,作为经销商,他们绝对不会隐瞒车辆官降的消息,“厂家3点多发布的,客户是4点多开的票,卖出去的时候,我们不知道新款的信息,这里面存在一个时间差,是经销商和厂家的沟通有问题才出现这样的情况,店里不希望这样。除了王先生,前面还有订车没有提车的客户,也存在类似的情况,已给厂家反馈,希望在最短的时间里有个让顾客满意的解决方案。”
  • 大豆豆粕库存双双下降

      线下大面积撤柜
  • 下半年GDP增长何去何从?

      研习非遗技艺、学习“龙文化”课程、体验雕版印刷……春节期间,不少家长带着孩子走进文博场所,开启研学之旅。
  • 为什么化妆比素颜还显老?来学学钟楚曦的美妆技巧!

      《学霸带带我》是新浪&微博国际教育择校展首创的国际化学校在校生分享环节,不同类型、不同课程体系学校的学霸牛娃现场分享成长经历、学习方法及申请经验和干货,从学生的视角为家庭带来多维度参考信息。
  • 佬牛足彩:阿森纳力克波尔图 利雅得新月客胜可期

      进入21世纪以来,我国科学技术进步突飞猛进。科技投入达到了世界先进水平。按不变价格计算,2022年,我国研究与试验发展(R&D)经费投入比上年增长7.7%,R&D经费投入强度(R&D经费与GDP之比)为2.54%,高于欧洲平均水平,与OECD国家平均水平的差距进一步缩小。其中,基础研究经费增速比R&D经费快1.3个百分点,总量规模位列世界第二。中国科学技术信息研究所发布的《2023中国科技论文统计报告》显示,2022年中国在各学科最具影响力期刊上发表的论文占世界总量的30.3%,首次赶超美国排名世界第一位。世界知识产权组织发布的2023年《世界知识产权指标》显示,2022年我国发明专利有效量位居世界第一。此外,近年来,中国在科技创新领域的大规模投入已经取得明显成效。2022年,中国已有762家企业进入全球研发投入2500强榜单。2018年,有关报道指出在工业发展领域有35项“卡脖子”关键技术。经过五年左右的攻关,已有20多项取得了重大突破,或者是实现了国产替代。