国产自拍👅_家庭教师动态头像-艺文笔记

王金豹 2026年01月19日 13:54:33
发布于:曼谷

国产自拍👅_家庭教师动态头像_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Subtask 31-63-22-020-052  B. Removal of the ND CAPT (3WT1)  (1)  Push in the two locking catches (4).

 (2)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (3)  Slowly and continuously lower the handle (4) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 412 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (4) Pull the handle (3) found at the removal point and disengage the unit

 (2).  (5)  Remove the unit (2). Subtask 31-63-22-420-051

 C.  Installation of the ND CAPT in place of the PFD CAPT

 (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the PFD just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

 Subtask 31-63-22-020-053  D. Removal of the upper ECAM DU (4WT1)  (1)  Remove the thermoformed cover from the center instrument panel.

 (2)  Push in the two locking catches (4).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 413 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (3)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (4)  Slowly and continuously lower the handle (3) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

 (5)  Pull the handle (3) found at the removal point and disengage the unit (2).

 (6)  Remove the unit (2).

 Subtask 31-63-22-420-052  E. Installation of the upper ECAM DU in place of the ND CAPT  (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the ND just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 414 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 Subtask 31-63-22-020-054

 F. Removal of the ND F/0 (3WT2)  Remove the thermoformed cover from the F/O main instrument panel.

 (1)  Push in the two locking catches (4).

 (2)   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 指示/记录系统 8

原标题:
85 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 这可能是人类史上最大银行抢劫案 就这样泡汤了

      3月11日,上海迪士尼度假区宣布,近期,度假区开启了位于上海迪士尼乐园内一个新景点的前期建设准备工作,这一独立主题的景点将毗邻“疯狂动物城”主题园区。针对筹备的新景点,上海迪士尼方面表示,目前,该项目仍处于初步规划阶段,随着未来工作的推进,度假区双方股东和管理层期待介绍更多项目进展。虽然上海迪士尼方面并未透露新景点的具体内容,但可以看出,园区的拓展与更新正在提速。
  • 上海唱响奋勇争先“好声音”

      伴随数字科技与移动应用的发展,智能家居的崭新时代正向我们迎面走来,以下是入列《2023大家居建装行业百大新品》智能主题展区的最新产品。
  • 强调保障学生充足课间活动时间!教育部:着力解决小眼镜小胖墩问题

      2、“定期定额投资业务”是基金申购业务的一种方式,如上述销售机构开通上述基金定投定额投资业务,投资者可以通过上述销售机构提交申请,约定每期扣款时间、扣款金额及扣款方式,由上述销售机构于约定扣款日在投资者指定的资金账户内自动完成扣款以及基金申购业务,具体的业务办理规则和程序请遵循上述销售机构的有关规定。
  • 春节假期文旅市场活力涌动

      诗意已能超物象,道情原不落言诠。
  • “中国第一,之后是美日韩德”

      “人体的免疫系统包含固有免疫和适应性免疫两部分。”曾玫教授解释,“固有免疫是人体的第一道免疫防线,这是我们每个人与生俱来的。例如,健康的皮肤和呼吸道黏膜组织可以将病原体抵挡在身体之外,呼吸道正常的分泌物中也含有抵御病原菌的免疫物质;而在适应性免疫中,发挥作用的主要是人体的T免疫细胞和B免疫细胞。这些细胞在接触病原等刺激后,会产生抗体等免疫物质来帮助我们抵御感染。”
  • 蒋飞:中国货币需求函数

      责任编辑:公司观察
  • 一个月涨超40%!万亿级新赛道开启

      在张志磊参赛前22个小时,他的经纪人李茂沛在手机上发出文字,告诉了抖音平台负责版权的工作人员这个消息。
  • 爱情:别让你心爱的TA过了保鲜期

      根据拜登的2025财年预算案,对2024年经济增长率的预测为1.7%,远低于经济学家2.1%的预估中值。
  • 年内银行同业存单发行额近5万亿元 保持量增价涨趋势

      学校连夜启动线上直播教学机制
  • 食人肉的寄生虫正在美国蔓延,气候变化可能加剧这个噩梦

      看过《中餐厅第七季》的应该能get到,这种CP感除了许光汉本身散发出来的气质外,高敏感、高度关注别人的情感需求也是一部分原因。
  • 武汉队受邀观战国家德比 滞留异乡曾引发当地恐慌

      习近平总书记强调,金融强国应当具备一系列关键核心金融要素,即:拥有强大的货币、强大的中央银行、强大的金融机构、强大的国际金融中心、强大的金融监管、强大的金融人才队伍。实事求是地从六项关键核心金融要素考察,我国离金融强国尚有差距,中国金融的特点是大而不强。
  • 【社论】共同书写中国式现代化建设新篇章

      美国银行日前发布研报,将标普500指数的年终目标点位从5000点上调至5400点。该行分析师认为,目前美股的市场情绪与1995年更为接近,情绪被限定在AI等几个有限主题上,还未到达狂热的水平。
  • 美股三大指数开盘全线下跌,芯片股延续回落势头

      嘉信理财英国董事总经理RichardFlynn表示,随着投资者对强于预期的数据做出反应,他预计未来几天股市将出现一些波动。但从更广的角度来看,这些数据不太可能造成太大的破坏。年初时,市场预计最多将有7次降息,但从那时到现在公布的经济数据缓和了对利率的预期。最新的非农就业报告可以被视为支持更新、更保守的预期,即2024年降息3次——有意思的是,这正是美联储一直以来的预测。
  • 如何把握最好的平仓机会?

      【CNMO科技消息】去年11月底,Redmi正式发布了K70系列,包含RedmiK70E、RedmiK70和RedmiK70Pro三款机型。而近日,CNMO注意到,Redmi或取消新一代K系列入门款机型。据数码博主“智慧皮卡丘”的爆料,RedmiK80系列的研发进度非常的快,其策略也有所微调,只做旗舰芯。博主表示,K80E型号或将被取消,相关配置下放至Note系列。