深夜福利✅_蜜汁狂喷的岳-艺文笔记

王金豹 2026年01月19日 05:04:29
发布于:曼谷

深夜福利✅_蜜汁狂喷的岳_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in para. 3.

 TASK 34-41-00-810-801  Loss of the Weather Radar Information on the ND  1. Possible Causes_______________  - DMC-1 (1WT1)  - DMC-2 (1WT2)  - XCVR-WEATHER RADAR, 1 (1SQ1)  - CTL UNIT-WEATHER RADAR (3SQ)  - MTG TRAY-WR XCVR (9SQ)  - RADOME (1560WM)  R  - XCVR-WEATHER RADAR, 2 (1SQ2)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first  terminal block  - wiring from the DMC1 (1WT1) to the CAPT ND (3WT1)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC2 (1WT2)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to the first  terminal block  - wiring from the DMC2 (1WT2) to the F/O ND (3WT2)  - avionics ventilation  - wiring of the TR1 DATA BUS 1 OUTPUT and the TR1 DATA BUS 2 OUTPUT buses  from the weather radar transceiver 1 (1SQ1) to the first terminal block  - wiring of the weather radar control unit (3SQ)  - wiring of the weather radar transceiver mounting tray (9SQ)  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC1 (1WT1)  R  to the first terminal block  R  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to first terminal  R  block  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC2 (1WT2)  R  to the first terminal block  R  - wiring of the TR2 DATA BUS 1 OUTPUT and the TR2 DATA BUS 2 OUTPUT buses  R  from the weather radar transceiver 2 (1SQ2) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 31-63-34-000-001 Removal of the DMC (1WT1,1WT2,1WT3)  AMM 31-63-34-400-001 Installation of the DMC (1WT1,1WT2,1WT3)  AMM 34-41-00-730-001 System Test of the Weather Radar  AMM 34-41-00-740-002 BITE Test of the Weather Radar  AMM 34-41-12-000-001 Removal of the Weather Radar Control Unit (3SQ)  AMM 34-41-12-400-001 Installation of the Weather Radar Control Unit (3SQ)  AMM 34-41-33-000-004 Removal of the Weather Radar Transceiver (1SQ1, 1SQ2)  AMM 34-41-33-400-003 Installation of the Weather Radar Transceiver (1SQ1,

 1SQ2) AMM 34-41-37-000-001 Removal of the Weather Radar Transceiver Mounting Tray (9SQ) AMM 34-41-37-400-001 Installation of the Weather Radar Transceiver  Mounting Tray (9SQ)  AMM 53-15-11-000-001 Removal of the Radome  AMM 53-15-11-400-001 Installation of the Radome  ASM 31-61/04  ASM 34-41/01

 3. Fault Confirmation __________________  A. Test Do the system test of the weather radar (Ref. AMM TASK 34-41-00-730-001).  4. Fault Isolation _______________ R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,  A. If the weather radar display is not shown or incorrectly shown on the CAPT ND only: - on the center pedestal, on the SWITCHING panel 8VU, set the EIS DMC  selector switch to CAPT/3, and make sure that the weather radar display is correctly shown on the CAPT ND.  (1) If the weather radar display is correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).  (a) If the weather radar display is still incorrectly shown on the CAPT ND with the EIS DMC selector switch at NORM:  - do a check of the wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞34-41-00∞∞∞∞∞∞∞∞∞∞Page 202  Aug 01/05 CES 1 If there is no continuity:

_ - repair the above wiring.  2 If there is continuity: _  - do a check and repair the wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  (2) If the weather radar display is not correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 导航 NAVIGATION 3

原标题:
53 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 印度经常账户赤字问题"火烧眉毛" 黄金能否成为救星

      由于在可行权日之前,公司已经根据股票期权在授权日的公允价值,将当期取得的服务计入相关成本或费用和资本公积。在行权日,公司根据实际行权数量,确认股本和股本溢价,同时将等待期内确认的“资本公积一其他资本公积”转入“资本公积一资本溢价”,行权模式的选择不会对上述会计处理造成影响。
  • 丹麦已成乌克兰最大捐助国之一

      “超聚变要借壳上市”传闻又来了。近期这则并未得到证实的传闻再次搅动投资者的“神经”。
  • 孙杨律师团队:全力还孙杨清白 力争能参加奥运会

      比亚迪率先掀桌,主打一个降维打击。以B级市场的王牌车系宋PLUS为例,入门价降到了12.98万,来到了去年秦PLUS的中配水位。不只是车型降价,新车型的价格也卷到了极致。3月2日,零跑汽车的新产品C10,直接把纯电卖的比增程还低,把自家C级车的售价钉在了12.88万-16.58万元。
  • 历次股灾各国和地区怎么救市的

      业内人士分析表示,目前,银行存款利率持续走低、理财产品收益率难达预期,不少人看中黄金的避险和保值属性,考虑投资黄金。
  • 11月14日 COMEX 12月期银未平仓合约减少2085手

      对于苹果来说,当时全球市场上,一边是三星带着Android在海外势如破竹,成为全球最大的手机制造商;一边是Google以125亿美元的价格收购摩托罗拉移动,亲自下场打响Android与iOS的生态之战;同时,在塞班系统上失利的诺基亚又与微软联手,带着WindowsPhone操作系统卷土重来,在一旁虎视眈眈。
  • 加息和降息对黄金白银的影响

      如果不是乔布斯的身体原因,苹果可以从2008年就开始推进汽车项目,那么,如今全球新能源汽车格局或许大有不同。
  • 姬宇阳:上海男排成功值得其他项目借鉴

      此前一天,美联储主席鲍威尔在美国国会参议院作证时表示,美联储距离有信心降息已经不远,并且很清楚降息太迟的风险。如果通胀走势符合预期,今年内将会开始降息。
  • 产后第一周,新妈妈一定要牢记这些禁忌

      八分之一的俄罗斯血统。
  • 中国利率市场现状:七大利率如何传导?

      显然,炙手可热的商业化前景,建立在相应技术基础上的产业关联与集合推力,顶层设计与微观政策的强有力支持,供给侧市场主体创造性能量的集体迸发,多重积极因素的叠加与组合,势必牵引或驱动国内飞行汽车切入快车道,但同时也应当承认,产品正式成型并不代表着一定合格合规,成功首飞并不意味着具备正式航行资格,从设计、制造到成品下线与检测,再到出厂试飞以及最终的商用,飞行汽车必须经过十分严密的政策许可与标准指引,且大规模投入商用之前还有不少的技术性掣肘,尤其是飞行汽车启动载人服务可能还有不小的距离。
  • “倾国倾城”一见倾心新加坡

      炒股就看金麒麟分析师研报,权威,专业,及时,全面,助您挖掘潜力主题机会!
  • 十四届全国人大二次会议举行闭幕会 习近平等党和国家领导人出席

      《追月》中戚老师教起后辈来毫不吝啬,生活中的何赛飞也是如此。她透露,越剧《新龙门客栈》打算拍摄电影版,平时在舞台上演员们是戴头套出演的,但如果拍成电影,就不能戴头套,得用自己的头发包发髻才会显得真实,在排练场李云霄看见何赛飞梳的头发,就会跟她去请教这些造型上的细节。
  • 虎牙斗鱼被禁止合并 腾讯筹谋三年终落空

      多重信号之下,比特币是否还有进一步上行空间?未来如何走?于佳宁指出,以比特币为首的数字资产可以被认为是一种“未来资产”,其价值能够有效穿越经济周期。而数字资产可以理解为数字经济发展的一面镜子,就如同股市反映实体产业的关系一样,数字资产价值重估反映数字经济的发展和繁荣。但作为一种高波动性的资产,比特币的价格短期内可能会经历剧烈波动,这在很大程度上取决于市场情绪、宏观经济环境、监管政策等因素。