国内精品♨️_美日韩在线一-艺文笔记

王金豹 2026年02月05日 07:13:26
发布于:曼谷

国内精品♨️_美日韩在线一_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 (b) If there is no ground signal:  - replace the APU MASTER SW (14KD).  1_ If the fault continues:  - do a check and repair of the aircraft wiring between the  MAIN START CONTACTOR (5KA) B5 and the terminal block

 2266VT/4 (Ref. AWM 49-42-01).  B. Do the test given in para. 3.

 TASK 49-00-00-810-987  Backup Start Contactor output open (APS 3200)

 1. Possible Causes _______________  - B/U START CONTACTOR (10KA)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 49-00-00-710-008 Operational Test of the APU (APS 3200)  AMM 49-42-55-000-001 Removal of the Start Contactors (5KA,10KA)  AMM 49-42-55-400-001 Installation of the Start Contactors (5KA,10KA)  AMM 49-61-34-000-002 Removal of the Electronic Control Box (ECB) (59KD)

 (APS 3200) AMM 49-61-34-400-002 Installation of the Electronic Control Box (ECB) (59KD) (APS 3200) ASM 49-42/01  3. Fault Confirmation __________________  A. Do the operational test of the APU (Ref. AMM TASK 49-00-00-710-008).  4. Fault Isolation _______________  A. If the APU Last Leg Report gives the maintenance message:  CONTACTOR (10KA)  Fault Code Number: 018 or 086

 - replace the B/U START CONTACTOR (10KA) (Ref. AMM TASK 49-42-55-000-001) and (Ref. AMM TASK 49-42-55-400-001).  (1) If the fault continues:  - do a check and repair the wiring between the Back-Up Start Contactor(10KA) and the ECB (59KD) (Ref. ASM 49-42/01).  (a) If the fault continues:  - replace the ECB 59KD (Ref. AMM TASK 49-61-34-000-002) and (Ref. AMM TASK 49-61-34-400-002).  B. Do the test given in para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 106-106, 108-149, 211-299, 301-399, ∞∞49-00-00∞∞∞∞∞∞∞∞∞∞Page A262  Config-2 Aug 01/05 CES TASK 49-00-00-810-988

 Backup Start Contactor failed open (APS 3200)  1. Possible Causes _______________  - ECB (59KD)

 2. Job Set-up Information ______________________  A. Referenced Information  ------------------------------------------------------------------------------- REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 49-00-00-710-008 Operational Test of the APU (APS 3200) AMM 49-61-34-000-002 Removal of the Electronic Control Box (ECB) (59KD) (APS 3200) AMM 49-61-34-400-002 Installation of the Electronic Control Box (ECB) (59KD) (APS 3200) ASM 49-42/01  3. Fault Confirmation __________________  A. Do the operational test of the APU (Ref. AMM TASK 49-00-00-710-008).  4. Fault Isolation _______________  A. If the APU Last Leg Report gives the maintenance message:  CURRENT LIMITER 6KA / CONTACTOR 10KA  Fault Code Number: 126

 - do a check and repair of the wiring between ECB (59KD) AB/E3 and the BACKUP START CONTACTOR (10KA) A/G (Ref. ASM 49-42/01).  (1) If the fault continues:  - replace the ECB (59KD) (Ref. AMM TASK 49-61-34-000-002) (Ref. AMM TASK 49-61-34-400-002).  B. Do the test given in para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 106-106, 108-149, 211-299, 301-399, ∞∞49-00-00∞∞∞∞∞∞∞∞∞∞Page A263  Config-2 Aug 01/05 CES

 TASK 49-00-00-810-989

 Main Start Contactor failed open (APS 3200)  1. Possible Causes _______________  - ECB (59KD)

 - CONTACTOR-MAIN START (5KA)

 2. Job Set-up Information ______________________  A. Referenced Information  ------------------------------------------------------------------------------- REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 49-00-00-710-008 Operational Test of the APU (APS 3200) AMM 49-61-34-000-002 Removal of the Electronic Control Box (ECB) (59KD) (APS 3200) AMM 49-61-34-400-002 Installation of the Electronic Control Box (ECB) (59KD) (APS 3200) ASM 49-42/01   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 机载辅助动力 2

原标题:
10 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 汪涛:经济对信贷的依赖下降了吗

      金融强国中国特色的第三个要义是金融必须为经济社会发展提供高质量服务。中央金融工作会议提出要为经济社会发展提供高质量服务,营造良好的货币金融环境、加强对重大战略重点领域和薄弱环节的优质金融服务,这也是中国式现代化走高质量发展之路的必然要求。未来一个时期,首先,应始终保持货币政策的稳健性,继续保持市场流动性合理充裕,保持货币信贷总量适度、节奏平稳。货币政策要更加注重做好跨周期和逆周期调节,增强金融支持实体经济力度的稳定性。其次,优化资金供给结构,把更多金融资源用于促进科技创新、先进制造、绿色发展。继续加大对重点领域与薄弱环节的金融支持力度,尤其对创新驱动发展战略、区域协调发展战略、国家粮食和能源安全等领域,对科技创新及其成果转化、中西部基建、新能源产业链、农业现代化等的发展提供更多的资金支持。最后,金融业自身也要实现高质量发展,重点做好科技金融、绿色金融、普惠金融、养老金融、数字金融“五篇大文章”。
  • 理想汽车人事变动!李想直接管销售服务业务,马东辉接替沈亚楠任总裁

      原标题:315维权|天津一“蕃茄田”关店:自称无力退费,转课需追加付费
  • 华西都市报:排球搞真职业化让女排先行

      小成本加盟的典型代表为奶茶店。南京一位有意向做奶茶加盟的商家对《豹变》表示,自己把加盟费、房租、员工工资、水电成本等平均到每一天,每日营业10小时,只要每小时卖出三十多杯就能赚钱。
  • 北京——珠江天樾书院丨楼盘测评

      信息传播率如何更大化
  • 日媒总结十种丈夫经常对妻子说的谎言

      北京时间2月6日,洛杉矶湖人客场以94-136惨败于印第安纳步行者。这场比赛,湖人输给了对手42分,这也是勒布朗-詹姆斯在自己职业生涯中输给对手最多的一场比赛。此前,詹姆斯所在的球队曾经在2007年和2017年输给过对手35分。
  • 2030年市场规模达2万亿 低空经济蓄势待飞

      在电池结构设计上,神炼电池采用高强度箱体设计,大幅提升碰撞安全性能。独创的MUST多功能一体化结构实现高集成、高强度、热管理等多功能合一,维护成本更省。此外,神炼电池依托首创的电芯“问顶技术”,确保电芯不泄漏、不析锂、不起火,不爆炸。
  • 中国旅游消费较多的低龄健康老年人将超过1亿

      地藏菩萨,四大菩萨之一,梵文名为乞叉底蘖婆,因其“安忍不动如大地,静虑深密如秘藏”,所以被称为地藏。
  • 金价创新高,黄金股利好程度不同

      2022年3月成立后的一年内,合肥市高质量引导基金招引设立了47只母子基金,与社会资本合作设立参股基金超1500亿元;累计推介招商项目105个,计划总投资813亿元,完成项目与资本有效对接不低于300次。股市回暖,抄底炒股先开户!智能定投、条件单、个股雷达……送给你海量资讯、精准解读,尽在新浪财经APP
  • 黄河口公路自行车赛垦利站 大团冲刺利库诺夫险胜

      王先生表示,接待他的销售还将微信朋友圈屏蔽,“是故意不想让我看到吗?”王先生称。对此,销售人员称,新款车型的发布,他也是晚上才知道的,他还解释说,朋友圈是把所有顾客都屏蔽了,不是针对王先生。
  • 欧冠女排附加赛伊萨双杀进8强 8进4再战斯坎迪奇

      生意的本质,就是要获取利益最大化、持久化。
  • 2022年全国工商联家具装饰业商会标准化工作会议

      ThrillIsland勇者之境是海洋标志号的水上乐园,游客几乎可以在园中体验到所有的水上娱乐活动,六条滑梯的六种玩法,也打破了六项记录。
  • 就现在,一秒穿越回上元灯彩图

      什么才是女人最美的身材?
  • 日男排联赛JT雷霆1

      ——编者