糖心logo官网✅_色婷婷中文字幕一区二区-艺文笔记

王金豹 2026年01月19日 12:07:53
发布于:曼谷

糖心logo官网✅_色婷婷中文字幕一区二区_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Subtask 31-63-22-020-052  B. Removal of the ND CAPT (3WT1)  (1)  Push in the two locking catches (4).

 (2)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (3)  Slowly and continuously lower the handle (4) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 412 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (4) Pull the handle (3) found at the removal point and disengage the unit

 (2).  (5)  Remove the unit (2). Subtask 31-63-22-420-051

 C.  Installation of the ND CAPT in place of the PFD CAPT

 (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the PFD just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

 Subtask 31-63-22-020-053  D. Removal of the upper ECAM DU (4WT1)  (1)  Remove the thermoformed cover from the center instrument panel.

 (2)  Push in the two locking catches (4).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 413 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (3)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (4)  Slowly and continuously lower the handle (3) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

 (5)  Pull the handle (3) found at the removal point and disengage the unit (2).

 (6)  Remove the unit (2).

 Subtask 31-63-22-420-052  E. Installation of the upper ECAM DU in place of the ND CAPT  (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the ND just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 414 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 Subtask 31-63-22-020-054

 F. Removal of the ND F/0 (3WT2)  Remove the thermoformed cover from the F/O main instrument panel.

 (1)  Push in the two locking catches (4).

 (2)   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 指示/记录系统 8

原标题:
52 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 美股三大指数集体收涨 英伟达收盘再创新高

      在宝盈华证龙头红利50指数基金经理蔡丹看来,高股息股票具有类债券属性,与国债利率走势呈现负相关。近几年央行不断降准降息,国债利率持续下行,高股息资产相对债券类资产优势还是很明显,这也是投资者这几年青睐红利资产的主要原因。
  • 定向发行地方债利好股市

      除此之外,元UP档把采用星芒造型,档把内的切割形成了很有质感的样式,提升了车内的调性,同级别车型中,还没有这样的设计。
  • 利物浦1

      商会青委会执行主席、顶固集团董事长辛兆龙认为,两个文件为家居企业敢闯敢拼提供了底气,下一步就是锚定目标,提升产品质效。
  • 欧洲央行行长拉加德暗示6月可能降息 内部预测通胀率明年有望降至2%

      然而截至目前,高合除了运送一批自家产品到长安汽车试驾体验外,再无其他公开接触对象。并且,长安董事长朱华荣也公开回应收购高合的传闻“离谈妥还远”。丁磊的续命之路碰上前东家的落井下石,还连累长安股价在接洽消息放出当日大跌,市值蒸发90亿左右。对于高合这种争议缠身的造车新势力,长安汽车又为什么想要碰一碰这个烫手山芋?
  • 这些时尚感发饰也太上头了吧

      北京时间3月12日,NBA常规赛,勇士112-102力克马刺。
  • 英伟达,止步7连涨!一数据上升强化市场降息预期

      博时基金认为,A股自2月初的这波反弹,主要是受政策利好的推动,短期来看,在宏观大环境依旧较友好的情况下,A股仍有望继续震荡上行、但上行的节奏或将有所放缓,业绩确定性更强的行业板块或将更受资金青睐。
  • 新华社许基仁:办好亚运会 要换新理念

      最近3年的血亏之后,碧生源的血条也在急速下降。截至2023年末,公司银行结余、现金(含现金及现金等价物)、定期存款及受限存款,合计为2.89亿元,比上年同期减少了近2亿元。海量资讯、精准解读,尽在新浪财经APPVIP课程推荐加载中...APP专享直播1/10热门推荐收起新浪财经公众号
  • 本轮牛市热度将持续至6000点

      第三方机构的编辑可以说见证了网文圈无数人的梦想沉浮与坠落。编辑小海告诉Tech星球,一个编辑每天差不多能收到100-150个人投递的作品,周一最忙,有时候堆到200-300份作品。海量作品等着审核,所以审核编辑们通常需要练就十几秒看一千字的本领。作者们一小时码不出来1000字,编辑们看十几秒可能就毙掉了。小海称,编辑眼里的好作品,一是看用词造句是否通顺连贯,另一个看是否适合卡点,有情绪,是否爽文,有卖点。
  • 海地总理亨利辞职

      “你吃的五常大米真的来自五常吗?”最近,金龙鱼旗下“天赋五常稻花香”产品遭遇了一场打假风波。职业打假人王海质疑其产品质量和来源,相关视频引发广泛关注和讨论。
  • 大城市该不该控制人口?

      原标题:联合国:叙利亚陷入前所未有的人道主义危机
  • VR 动作游戏《Swordsman VR》免费更新训练场地图

      (3)本表合计数与各数直接相加之和在尾数上存在差异,系四舍五入所致。
  • 春转夏 我对自己只有一个要求:清爽一点

      整个美国国防部至少正在进行31项定向能项目,其中一些项目比其他项目更成熟。其中包括由洛克希德-马丁公司生产、2022年安装在海军驱逐舰“普雷布尔”号上的高能激光与综合光学杀伤监视系统(HELIOS),以及由伊庇鲁斯公司生产、2023年交付陆军的“利奥尼达斯”高功率微波武器,以增进陆军的间接火力防护能力计划。
  • 为何有人敢与各国央行为敌?

      刘希娅:我注意到现在的教育焦虑中,有一部分源起于教育类自媒体的炒作。特别是有些自媒体发布的信息不实,加重了教育“内卷”,且偏离了合法合规发表言论的范畴,甚至造成不良社会影响。