国内精品♨️_serengeti 翻译-艺文笔记

王金豹 2026年01月22日 01:01:59
发布于:曼谷

国内精品♨️_serengeti 翻译_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

A 747-400 MAINTENANCE MANUAL

 32-42-00  ALL  ú ú 05 Page 53 ú Jun 10/94 BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. A 747-400 MAINTENANCE MANUAL  (2)   The body gear steering is armed when these conditions occur:

 (a)   Both AIR/GROUND signals indicate the ground mode for at least 10 seconds (or at least 1 second following a power interruption).

 (b)   The fourth highest of the 8 wing gear wheel speeds is less than 20 knots on increasing wheel speed (disarm when accelerating). The fourth highest of the 8 wing gear wheel speeds is less than 15 knots on decreasing wheel speed (arming when decelerating).

 (c)   If the left and the right IRS ground speed are less than 40 knots.

 E. Brake control system BITE.

 (1)   The brake control system BITE contains the circuits necessary for a complete fault isolation and test of the brake control system. All testing and trouble shooting of the brake control system is done using the central maintenance computer system. All brake system malfunctions can be isolated to line replaceable units (LRUs). Fault information on LRUs is stored as intermittent or continuous faults in the CMC. The faults can be recalled and corrected during maintenance operations.

 (2)   The major functions of the CMC that are used in the maintenance of the brake control system are:

 -Present leg faults recall  -Existing faults recall  -Brake System BITE Test  -Antiskid Brake Release Test  -Autobrake Application test  -Torque Sensor Zeroing test  (3)   The central maintenance computer is operated using a Control Display Unit (CDU) (Ref 45-10-00/001). Line select keys permit the maintenance person to do any test or maintenance operation specified on the screen adjacent to the key. The maintenance person can get a report on faults by pushing the line select key adjacent to the PRESENT LEG FAULTS or EXISTING FAULTS message on the CDU.

 (4)   Interactive tests are tests in which a maintenance person must do specific steps at specified intervals in the test.

 (a)   The Brake System BITE tests the Brake System Control Unit (BSCU), the Antiskid System, the Autobrake System, the Brake Torque Limiting System, the BITE cards, and all LRU's. When the test has completed a "PASS" or "FAIL" will be show on the CDU. If a failure occurs, the line select key (LSK) may to used to show the failure. Once the failure is corrected, the test should be repeated until a "PASS" is obtained. This test should be the first test run when doing maintenance on the brake control system and will supply the most complete system condition.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 32-42-00  ALL  ú ú 04 Page 54 ú Jun 10/94 BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. A 747-400 MAINTENANCE MANUAL  (b)   The Antiskid Brake Release test fully releases all brakes. Each brake can be selected one at a time on the CDU. A pressure gage must be installed on each brake to make sure the antiskid system operates correctly. To do a manual test of the antiskid system, remove each hubcap and turn the antiskid transducer shaft. This transmits a signal to the BSCU which releases the brakes on both tandem wheels. During these tests, a maintenance person must look for correct antiskid operation.

 (c)   During the Autobrake Application test, a pressure gage must be installed on one of the brakes so that brake pressure can be monitored. The autobrake selector switch must be armed in any position for the test. The test is started through the CMC. Each autobrake selector switch position will show a different pressure.

 (d)   The Torque Sensor Zero test sets the offset of each torque sensor to zero. The parking brake must be released. Each sensor can be selected using the CDU. This test should be done after a brake torque rod is replaced. IF the torque sensor offset is greater than 5000 pound-feet, the offset cannot be set to zero, and a "Brake Limiter" EICAS and CMC message will be set. An autozero occurs for all wheels two minutes after takeoff.

 (e)   A Torque Limiter Release test can be done by disconnecting each brake torque rod connector and inserting a test tool in place of the sensor. A high torque signal is transmitted by the test tool and the BSCU releases the brakes. A presure gage must be installed in the brake so a maintenance person can look for correct brake operation.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:747-400 AMM 飞机维护手册 起落架 LANDING GEAR 7

原标题:
67 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 美巢2023年工业之旅·探秘巢级制造工厂活动顺利开展

      走神的瞬间,你侧过头看到了发亮的广告牌,上面是公益广告,主题就是“你的样子”,致敬每一个奋斗在工作岗位的人。
  • 互联网金融的核心是产品交易平台

      股东对总议案与具体提案重复投票时,以第一次有效投票为准。如股东先对具体提案投票表决,再对总议案投票表决,则以已投票表决的具体提案的表决意见为准,其他未表决的提案以总议案的表决意见为准;如先对总议案投票表决,再对具体提案投票表决,则以总议案的表决意见为准。
  • 掼蛋拯救了中老年男人

      来源:人民日报海外版图为1月25日在美国加利福尼亚州凯特尔曼城拍摄的电动汽车充电桩。新华社/路透
  • 孙杨顾问律师:将更换团队 在国内也要提起诉讼

      2016年7月18日,习近平来到固原市原州区万亩冷凉蔬菜生产基地考察。原州区被誉为“中国(西部)冷凉蔬菜之乡”。然而,水资源短缺、利用率不高,以及水利基础设施薄弱等因素曾一度卡住了蔬菜种植这一富民产业的“脖子”。近年来,当地修建了10万至20万立方米大型调蓄水池20座,建成高效节水农业示范基地24处,开发高效节水灌溉土地面积32万亩,这些喷灌水利设施有力促进了蔬菜种植产业的规模化发展,带动当地村民脱贫奔小康。△冷凉蔬菜种植已成为当地的致富产业
  • 营改增对生活服务业利好明显

      记者于当日下午前往北京一大行网点,该行已贴出告示,通知投资者两期国债销售已结束。
  • 南粤交管候选人郑树坚:把该做的工作尽可能做到最好

      “不要在孩子刚刚出现发烧或者咳嗽时,就盲目使用抗菌药物或抗病毒药物。”曾玫教授提醒,“许多患者存在过度使用抗病毒药物的现象。如果不是病毒性感染,吃抗病毒药物不仅无效,过度使用还会令身体逐渐产生耐药性,导致再次感染时可能找不到合适的药物治疗。”她强调,患者一定要经过医生诊治并进行病原学的检测后,再结合具体的病原体对症下药,合理使用抗生素与抗病毒药物。这位专家直言,滥用抗生素或抗病毒药物会对人体的免疫系统产生负面影响,而免疫系统在孩子患病到康复的整个过程中都会起到至关重要的作用。
  • 任泽平:振兴当前股票市场的四大对策

      其中,首钢东南区配套学校位于古城街道,用地面积约1.28万平方米。该校办学规模为18班九年一贯制,建成后可提供720个学位,其中小学12班,480个学位;初中6班,240个学位。
  • 伊万科维奇:无论新老 还是归化球员都必须证明自己

      关注公众号“新浪微整形”,查看更多精彩原创内容!
  • 一日浪读:珠江实业集团董事长被查

      首先是在业务布局上的超前投入。除了手机和电池,蔚来在换电上的大手笔也是经常为人所诟病。按照行业人士的曝光,尽管蔚来换电站的成本在不断下降,和第一代相比,蔚来的三代换电站成本已经从约300万元下降到了150万元。但截止去年11月,蔚来已建设换电站数量2217座,成本高达数十亿元。同时随着超冲技术的成熟,换电的实用性也在遭受质疑。
  • 土超女排萨勒耶尔零封PTT 缪伊雯短暂替补未得分

      从储户角度而言,跨境存款划算吗?业内人士表示,部分香港银行给出的高息存款利率具有很大吸引力,但此类产品期限较短,主要是为了吸引新客户存款。拉长时间来看,长期储蓄利率没有那么高。与此同时,储户需注意诸多风险。
  • 圆脸怎样才能上镜不显胖?来和辛芷蕾学两招

      任兴洲也表示,统筹疫情防控和经济发展面临新的挑战。在此背景下,对通过数字化、智能化、无接触技术等工具创新供应链运行方式,促进供应链畅通和协同,提高供应链效率提出了迫切要求。