在线看免费❗_2024年3月份的黄道吉日查询-艺文笔记

王金豹 2026年01月26日 11:33:23
发布于:曼谷

在线看免费❗_2024年3月份的黄道吉日查询_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 22-66-34-000-002 Removal of the FAC (1CC1,1CC2)  AMM 22-66-34-400-002 Installation of the FAC (1CC1,1CC2)  AMM 22-96-00-710-001 Operational Test of the AFS  AMM 27-22-51-000-001 Removal of the Rudder Trim Actuator (10CC)  AMM 27-22-51-400-001 Installation of the Rudder Trim Actuator (10CC)  AMM 27-23-51-000-001 Removal of the Rudder Travel Limitation Unit 4CC

R  AMM 27-23-51-400-001 Installation of the Rudder Travel-Limitation Unit 4CC ASM 22-67/01  3. Fault Confirmation __________________  A. Make sure that this(these) circuit breaker(s) is(are) closed:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION ------------------------------------------------------------------------------- 121VU AUTO FLT/FAC2/28VDC  5CC2 M19  B. Test  (1) Do the operational test of the AFS (Ref. AMM TASK 22-96-00-710-001) and read the result for the FAC 2.  (a) If the circuit breaker 5CC2 is open refer to Para. 4.B.

 4. Fault Isolation _______________

 A. If the circuit breaker 5CC2 is closed, and if the test gives the maintenance message AFS: FAC2:  - do a check for 28VDC at the FAC 2 (1CC2).  (1) If there is 28VDC:

 - replace the FAC-2 (1CC2), (Ref. AMM TASK 22-66-34-000-002) and (Ref. AMM TASK 22-66-34-400-002).

 (2) If there is no 28VDC:

 - do a check of the wiring of the 28VDC signal from the circuit  breaker (5CC2) to the FAC 2 (1CC2). R - do a check of the wiring of the ground signal at the FAC 2 (1CC2) R pin AC/3.  (Ref. ASM 22-67/01).  (a) If there is no continuity:

 - repair the above wirings.

 (b) If there is continuity:

 - replace the C/B-AUTO FLT/FAC 2/28VDC (5CC2).  B. If the circuit breaker 5CC2 is open:  - close this circuit breaker.  (1) If this circuit breaker opens again:  - disconnect these three units:  LIMITATION UNIT-RUDDER TRAVEL (4CC)  ACTUATOR-RUDDER TRIM (10CC)  FAC-2 (1CC2)

 - close the circuit breaker 5CC2.

 (a) If this circuit breaker stays closed:

 - connect the units one by one until the circuit breaker 5CC2 opens again

 - replace the related unit: for LRU 4CC: (Ref. AMM TASK 27-23-51-000-001) and (Ref. AMM TASK 27-23-51-400-001) for LRU 10CC: (Ref. AMM TASK 27-22-51-000-001) and (Ref. AMM TASK 27-22-51-400-001) for LRU 1CC2: (Ref. AMM TASK 22-66-34-000-002) and (Ref. AMM TASK 22-66-34-400-002).

 (b) If this circuit breaker opens again:

 - do a check for a short to ground between the circuit breaker 5CC2 and the three units, (Ref. ASM 22-67/01).  1 If there is a short to ground: _ - repair the related wiring.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞22-66-00∞∞∞∞∞∞∞∞∞∞Page 205  Feb 01/05 CES

_  - replace the C/B-AUTO FLT/FAC 2/28VDC (5CC2).  (2) Connect all the units.  C. Do the test given in Para. 3.

 Loss of the FAC 1 GENERAL Bus  1. Possible Causes _______________  - FAC-1 (1CC1)

 - wiring of the FAC OWN (GENERAL BUS) from the FAC 1 (1CC1) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 22-66-34-000-002 Removal of the FAC (1CC1,1CC2)  AMM 22-66-34-400-002 Installation of the FAC (1CC1,1CC2)  AMM 22-96-00-710-001 Operational Test of the AFS  ASM 22-69/01

 3. Fault Confirmation

__________________  A. Test  (1) Do the operational test of the AFS (Ref. AMM TASK 22-96-00-710-001) and read the result for the FAC 1.  4. Fault Isolation _______________  A. If the test gives the maintenance message AFS: FAC1/C-M ARINC LINK:  - replace the FAC-1 (1CC1), (Ref. AMM TASK 22-66-34-000-002) and (Ref. AMM TASK 22-66-34-400-002).  (1) If the fault continues:  - do a check and repair the wiring of the FAC OWN (GENERAL BUS) from the FAC 1 (1CC1) to the first terminal block, (Ref. ASM 22-69/01).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 AUTO FLIGHT 自动飞行2

原标题:
72 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 亲密盟友扇来一记耳光 这国民众开始“抵制美货”

      这也就是为什么,奔驰EQS的销量,仅有S级的12分之一不到。而前者的起售价还比后者低30万元。
  • 天津女排外援瓦尔加斯已回国 将重返费内巴切征战

      其实红色在当下各大社媒形成流行趋势,在中西方文化语境中皆有迹可循。红色之于国人的特殊意义早已根深蒂固,既是节日中辞旧迎新的重要色彩元素,代表着欢庆与幸运;而在西方视角下,红色元素同样象征着爱与能量,借由此番红色裤袜的热潮,人们也再一次找到传递积极态度的载体。
  • 近30年黄金走势及近年下跌原因

      而对于这些此前曾提到的新品,一位长期关注苹果的资深记者,是仍坚持很快就将推出,预计在3月底或4月的某一时间点。
  • 口碑见证品牌力量!2023家居消费者口碑榜上榜品牌揭晓

      终端数据显示,江淮2023年新能源乘用车销量为2.04辆,相比2022年的4.86万辆,同比下降58%,且很大一部分销量还是来自江淮大众合作品牌思皓,有1.1万辆。
  • 当猫狗看电视时,它们到底在看些啥?

      为满足长者的各类用餐需求,天津乐境内设有五种不同功能的餐厅:北门医院附近的大餐厅主要面向短住和体验的客户;生活区的中央餐厅主要面向长住的自理区长者;5号餐厅服务于有特殊需求的用餐情况,例如团建、聚餐;7号餐厅面向照护区长者;此外,照护区楼栋每层都有一个小餐厅,便于长者用餐。
  • 二手房签约交易前,别忘了先看这篇攻略!

      试想一下,如果职业教育发展得好,职业教育培养出来的孩子比普通学校的毕业生更有一技之长、更为吃香、社会地位更高,那么人们自愿选择读职业教育就将成为现实。
  • 迪士尼的 “上新”经济学

      不知为何,如今它又卷土重来。
  • 大模型太卷,AI应用就好做吗?

      提议人王毅清承诺,将依照相关规定,积极推动公司尽快召开董事会审议回购股份事宜,并承诺将在董事会上对公司回购股份议案投赞成票。
  • 2019年iPhone XR出货量全球第一 卖出4630万台

      如果说《三体》是关于宇宙最狂野的想象,那《三体立体书红岸基地》就是将这份想象转化为了可触摸、可视化的阅读体验。这本书采用全景展开的装帧方式,还原从大兴安岭林场、红岸基地、到齐家屯的整个地图,全书展开后近1.5平方米,小立体页和丰富有趣的互动机关则暗藏细节,使故事结构更为完整。为了确保立体书最终呈现出来的效果,在做立体纸艺设计的时候,施镇宇挑战立体纸艺结构画幅极限,创新性采用二段式结构,搭建出约0.5米高的红岸基地巨型天线,带来震撼的阅读体验。
  • 怪奇物语 幻想乐园《全民泡泡超人》S4赛季即将上线

      谈及折叠屏手机的快速发展,TCL华星CEO赵军在去年曾对钛媒体App表示,“大概五年前,折叠手机开始进入消费者的视野。三年前,折叠手机的市场规模还小于100万。今年,整个折叠手机的市场规模接近2000万,大概是在1800万到2000万之间,全球折叠手机的出货量,基本每年是以几倍的速度在增长。我们认为折叠手机是目前智能手机领域产品创新和迭代的主要创新点和增长点。”
  • 埃及2月年度通胀率升至36%

      鹿小策,90后网文作者,英语专业,从2015年大二开始写长篇古言小说,今年已经是她从事网文写作的第9年。9年来,通过写作,鹿小策累计挣到自己人生第一个100万。
  • 敖子逸晒表情包回应私联粉丝传闻:别想了 不是我

      美联储降息的依据主要来自美国的通胀和就业数据,这两项关键数据的表现其实一直起伏不定,所以,自去年以来,美联储降息的预期也一直反反复复。市场一度预期2024年有5次降息,后来预期降息次数降到3次甚至更少。有一些国际知名投资机构,在当前黄金的狂热背景下开始反向操作,做空黄金,理由就是认为美国的通胀和就业数据可能会超出预期,美联储甚至有可能还会继续加息。《半泽直树》剧照