天堂岛精品🔇_欧美亚日韩第一页-艺文笔记

王金豹 2026年01月22日 00:21:41
发布于:曼谷

天堂岛精品🔇_欧美亚日韩第一页_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in Para. 3.  5. Close-up________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 239  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 2  1. Possible Causes _______________  - ELAC-2 (2CE2)

 - wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC2 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-2 (2CE2), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 241  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Green Hydraulic Pressure Switch Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the LOW GREEN PRESS signal from the ELAC 1 (2CE1) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 3

原标题:
44 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 中国梦践行者心系“中国结” 三地梦共圆

      金价火出圈,银行也根据市场形势及时调整业务门槛。记者从多家银行了解到,一般来说,主动积存或定期积存起点为1克或等值金额。
  • 维密关闭北京王府井大街全球旗舰店

      这种大经销商的倒戈,不仅会重创品牌在当地的营销网络,而且由于大经销商自己下面还连带着诸多小经销商和终端网点,因此一旦转投竞争对手,此消彼长之间甚至就可能改变一个地区的市场格局。
  • 俞敏洪就论坛发言道歉:没有表达好 引起误解

      商务部流通产业促进中心流通消费处处长张婷婷作政策解读时表示,完善的标准才能有效提高家居行业整体产品质量与服务品质。商务部流通产业促进中心正在开展商务领域行业标准的立项与审定工作,未来希望围绕家居相关产业,着力在绿色家居、适老化改造、智能家居等方面推动出台更多行业标准,提升消费者触达的便利性;构建“大家居”生态,推动产业融合发展;用好各类促消费活动,联合地方政府和有意愿企业举办家居促消费活动;联合金融平台机构,加大金融产品促消费力度。
  • 华为加拿大公司就法官拒绝引入新证据发表声明:遗憾!

      见证美容业发展热潮的专业人士们。
  • 2039年中国GDP完全可能超过美国

      显而易见,这个时候全球范围内的新能源汽车行业已经“大局已定”。苹果再难超越特斯拉,成为那个半路杀出、掌握智能汽车话语权的黑马了。
  • 快讯:算力概念股持续走强 工业富联午后涨停

      我国已初步具备金融强国的经济基础
  • 中美还有哪些牌可以打?

      减肥药“双雄”走弱,礼来、诺和诺德均跌超2%。消息面上,礼来周五宣布,美国食品药品监督管理局(FDA)意外推迟了对其阿尔茨海默病新药donanemab的审批决定,并将召开外部专家会议,讨论其药物的安全性和有效性。礼来表示,FDA咨询委员会会议讨论donanemab的日期尚未确定,但可能需要几个月的时间,因此预计审批时间将推迟到一季度之后。
  • 生物机器人,不只是机器人那么简单

      德国《商报》网站近日报道称,为了争夺重要海上贸易通道沿线的军事影响力,印度3月6日启用了一个新的海军基地。该基地位于偏远的热带天堂——印度最南端的岛屿之一米尼科伊岛。
  • [新浪彩票]足彩第24038期任九:皇马勒沃单3

      (3)施工工具:电锯,电锤,电钻,瓦刀,铲子,改锥,老虎钳,射钉枪等八大件依然是主角,新工具除了搅拌枪、真空吸盘、智能激光测距仪、智能电动螺丝刀等为数不多的辅助工具外,难觅踪迹。
  • 张瑜:读懂增量信息

      王先生表示,接待他的销售还将微信朋友圈屏蔽,“是故意不想让我看到吗?”王先生称。对此,销售人员称,新款车型的发布,他也是晚上才知道的,他还解释说,朋友圈是把所有顾客都屏蔽了,不是针对王先生。
  • 预计2018年美联储加息四次

      1月30日,宁德时代披露的业绩预告显示,去年全年预计实现盈利约425亿元至455亿元,同比增长38.31%-48.07%。以此计算,去年第四季度宁德时代净利润大约在113.55亿元至143.55亿元,环比增长,但相较于2022年第四季度的131.38亿元,宁德时代净利润或出现同比下滑。
  • “灿烂中国游”首支旅游团自美启程

      在我看来,站出来回应,总比放着不管要好的多,毕竟这样的言论已经上升到了对品牌的伤害。
  • 讲座报名:科学填报志愿 合理选择院校及专业

      “跨境产业互联网,有望为中国经济带来新的增长极。”黄奇帆认为。以跨境电商为例,我国进出口货物总额达6万亿美元,跨境电商仅占2000亿美元。如果打通了行业体制标准,未来跨境电商可以做国内订单,国内电商也可以做国际订单。