天堂岛精品🔇_美日韩一本在线-艺文笔记

王金豹 2025年11月16日 02:01:17
发布于:曼谷

天堂岛精品🔇_美日韩一本在线_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Subtask 31-63-22-020-052  B. Removal of the ND CAPT (3WT1)  (1)  Push in the two locking catches (4).

 (2)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (3)  Slowly and continuously lower the handle (4) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 412 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (4) Pull the handle (3) found at the removal point and disengage the unit

 (2).  (5)  Remove the unit (2). Subtask 31-63-22-420-051

 C.  Installation of the ND CAPT in place of the PFD CAPT

 (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the PFD just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

 Subtask 31-63-22-020-053  D. Removal of the upper ECAM DU (4WT1)  (1)  Remove the thermoformed cover from the center instrument panel.

 (2)  Push in the two locking catches (4).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 413 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (3)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (4)  Slowly and continuously lower the handle (3) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

 (5)  Pull the handle (3) found at the removal point and disengage the unit (2).

 (6)  Remove the unit (2).

 Subtask 31-63-22-420-052  E. Installation of the upper ECAM DU in place of the ND CAPT  (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the ND just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 414 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 Subtask 31-63-22-020-054

 F. Removal of the ND F/0 (3WT2)  Remove the thermoformed cover from the F/O main instrument panel.

 (1)  Push in the two locking catches (4).

 (2)   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 指示/记录系统 8

原标题:
87 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 柳叶刀:新冠变异株可能正在免疫低下感染者体内

      继首轮交出总上座人次、场均上座21856人次的出色答卷后,中超联赛第二轮上座继续攀升达到人次、场均23138人次,这个数据在上赛季各轮中可以排名第四,具体为:
  • 可爱到犯规!王俊凯晒宝宝滤镜合照为董子健庆生

      2023年11月18日上午,在上海国际童书展接力出版社展位,儿童阅读研究专家徐美玲老师带小读者们品读了作家凯特·迪卡米洛的新作,并和现场观众分享了儿童自主阅读培养的经验与方法。小朋友们在活动中共读佳作,体会故事的力量,感受心灵的联结。
  • 不良债转股很难大范围铺开

      “法非从天下,非从地出,发于人间,合乎人心而已”这一经典格言出自战国时期法家创始人之一慎到的《慎子·逸文》。这一观点符合社会发展实际,其凸显的人本主义法治精神,对当下具有重要的借鉴意义。法律是治国之重器,良法是善治之前提。法治的关键在于善法或良法的存在,衡量善法的一个重要标准,就是看它是否体现广大人民意志,是否保护人民利益,是否积极回应人民的关切与需求。民之所呼,法之所向。推进全面依法治国,根本目的是依法保障人民权益。坚持人民主体地位,恪守以人为本、立法为民的理念,把体现人民利益、反映人民愿望、维护人民权益、增进人民福祉落实到全面依法治国各领域全过程,不断增强人民群众获得感、幸福感、安全感,用法治保障人民安居乐业。
  • 范冰冰:应弘扬社会正气 传递社会正能量

      早在做校内网、饭否时,王兴就与红杉擦肩而过,直到2010年第三次做美团,沈南鹏才把他识别出来。而后红杉不仅是美团A轮唯一投资人,也是B轮、C轮、D轮最大机构投资人。红杉深度参与了美团的发展,为了促成2015年美团与点评“史诗级”合并,红杉内部开过近两百个电话会。
  • 插混车界全能手 试驾奇瑞风云T6

      经中国家居产业发展峰会组委会研究决定,特聘央视网产业发展事业群总监马桦,新华网客户端融合发展中心副总经理李鹏,中国质量网家居负责人张晓辉,搜狐家居总经理郑海云,北京商报家居事业部主任吴厚斌,优居副总裁、优居研究院院长张永志,网易家居全国总编胡艳力,新浪家居全国总编王晶,中国网家居主编纪海晨,凤凰网家居全国主编李文娟,家页传媒主编宗书慧,为产业发展战略及媒体评审团成员。
  • 云从科技科创板上市:市值159亿 3年亏损超过20亿

      为了努力降低成本,和众多食品饮料企业一样,金龙鱼也在开辟新的业务。
  • 11月5日 COMEX 12月期银未平仓合约减少4273手

      当市场质疑双方合作是否会继续时,去年4月余承东透露,华为与北汽极狐的合作模式将再进一步,从“HI模式”升级到智选模式,这意味着华为将掌握更大话语权。
  • 四川纳溪区:早茶飘香

      《AmongUsVR》最初于去年11月登陆MetaQuest、MetaRift和PCVR平台,其继承了《AmongUs》的全部核心机制,让玩家置身于Skeld核心区域。玩家在完成修复飞船任务的同时,还要提防隐藏在队伍中的“杀手”。如果玩家碰巧注意到任何可疑行为,可以使用语音聊天或文本来提醒船员或召开会议。新浪声明:新浪网登载此文出于传递更多信息之目的,并不意味着赞同其观点或证实其描述
  • 欧冠女排科内双杀瓦基弗晋级4强 哈克力夺19分

      决赛轮,罗学文与广东巡回赛冠军李建山以-3杆并列领先,压轴出发。在第一洞推进20码的老鹰推,他就单独占据了领先榜,并一直保持到了最后。第2号洞抓鸟,他进一步扩大了优势!随后,在7号洞、10号洞再抓两个小鸟后,罗学文总成绩来到-8。最后8个洞,罗学文打出7个帕,在15号洞吞下柏忌,以-7杆的总成绩结束比赛。两轮总成绩137杆,罗学文以5杆优势夺冠。
  • 黄金突破楔形上轨,目标见1227.30

      具体来说,我建议,平台审核方面首先要加强对自媒体信息发布的审核,最好进行分类分层的专业化审核。二是要畅通投诉渠道、建立投诉机制,让大众在发现不实信息时能第一时间投诉、督促纠正,使一些错误、不良信息的传播得到及时遏制。三是要加大对自媒体不良信息传播造成的后果的处罚力度,提高违规违纪成本。