国内精品♨️_啊哈哈啊哈哈好棒啊哥哥-艺文笔记

王金豹 2025年11月13日 21:12:41
发布于:曼谷

国内精品♨️_啊哈哈啊哈哈好棒啊哥哥_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

7/31/08 Pilot/Controller Glossary PCG-1 PILOT/CONTROLLER GLOSSARY PURPOSE a. This Glossary was compiled to promote a common understanding of the terms used in the Air Traffic Control system. It includes those terms which are intended for pilot/controller communications. Those terms most frequently used in pilot/controller communications are printed in bold italics. The definitions are primarily defined in an operational sense applicable to both users and operators of the National Airspace System. Use of the Glossary will preclude any misunderstandings concerning the system's design, function, and purpose. b. Because of the international nature of flying, terms used in the Lexicon, published by the International Civil Aviation Organization (ICAO), are included when they differ from FAA definitions. These terms are followed by “[ICAO].” For the reader's convenience, there are also cross references to related terms in other parts of the Glossary and to other documents, such as the Code of Federal Regulations (CFR) and the Aeronautical Information Manual (AIM). c. This Glossary will be revised, as necessary, to maintain a common understanding of the system. EXPLANATION OF CHANGES a. Terms Added: AUTOMATIC FLIGHT INFORMATION SERVICE (AFIS) - ALASKA FSS ONLY b. Editorial/format changes were made where necessary. Revision bars were not used due to the insignificant nature of the changes.

2/14/08 Pilot/Controller Glossary PCG A-1 A AAI- (See ARRIVAL AIRCRAFT INTERVAL.) AAR- (See AIRPORT ARRIVAL RATE.) ABBREVIATED IFR FLIGHT PLANS- An authorization by ATC requiring pilots to submit only that information needed for the purpose of ATC. It includes only a small portion of the usual IFR flight plan information. In certain instances, this may be only aircraft identification, location, and pilot request. Other information may be requested if needed by ATC for separation/control purposes. It is frequently used by aircraft which are airborne and desire an instrument approach or by aircraft which are on the ground and desire a climb to VFR‐on‐top. (See VFR‐ON‐TOP.) (Refer to AIM.) ABEAM- An aircraft is “abeam” a fix, point, or object when that fix, point, or object is approximately 90 degrees to the right or left of the aircraft track. Abeam indicates a general position rather than a precise point. ABORT- To terminate a preplanned aircraft maneuver; e.g., an aborted takeoff. ACC [ICAO]- (See ICAO term AREA CONTROL CENTER.) ACCELERATE‐STOP DISTANCE AVAILABLEThe runway plus stopway length declared available and suitable for the acceleration and deceleration of an airplane aborting a takeoff. ACCELERATE‐STOP DISTANCE AVAILABLE [ICAO]- The length of the take‐off run available plus the length of the stopway if provided. ACDO- (See AIR CARRIER DISTRICT OFFICE.) ACKNOWLEDGE- Let me know that you have received my message. (See ICAO term ACKNOWLEDGE.) ACKNOWLEDGE [ICAO]- Let me know that you have received and understood this message. ACL- (See AIRCRAFT LIST.) ACLS- (See AUTOMATIC CARRIER LANDING SYSTEM.) ACLT- (See ACTUAL CALCULATED LANDING TIME.) ACROBATIC FLIGHT- An intentional maneuver involving an abrupt change in an aircraft's attitude, an abnormal attitude, or abnormal acceleration not necessary for normal flight. (See ICAO term ACROBATIC FLIGHT.) (Refer to 14 CFR Part 91.) ACROBATIC FLIGHT [ICAO]- Maneuvers intentionally performed by an aircraft involving an abrupt change in its attitude, an abnormal attitude, or an abnormal variation in speed. ACTIVE RUNWAY- (See RUNWAY IN USE/ACTIVE RUNWAY/DUTY RUNWAY.) ACTUAL CALCULATED LANDING TIMEACLT is a flight's frozen calculated landing time. An actual time determined at freeze calculated landing time (FCLT) or meter list display interval (MLDI) for the adapted vertex for each arrival aircraft based upon runway configuration, airport acceptance rate, airport arrival delay period, and other metered arrival aircraft. This time is either the vertex time of arrival (VTA) of the aircraft or the tentative calculated landing time (TCLT)/ACLT of the previous aircraft plus the arrival aircraft interval (AAI), whichever is later. This time will not be updated in response to the aircraft's progress. ACTUAL NAVIGATION PERFORMANCE (ANP)- (See REQUIRED NAVIGATION PERFORMANCE.) ADDITIONAL SERVICES- Advisory information provided by ATC which includes but is not limited to the following:   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:PILOT/CONTROLLER GLOSSARY飞行员/管制员词汇表

原标题:
23 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 口碑见证品牌力量!2023家居消费者口碑榜上榜品牌揭晓

      (4)施工工艺:泥木水电油,没有新工具的出现,自然也难有新工艺的诞生和使用,更重要的是,各工种的工艺基本还是来自于师傅言传身教,除水电工拥有国家标准的技能考核和证书之外,其他施工工艺主要靠师傅在现场的摸索和积累。
  • 苏宁已无实控人

      3月11日晚间,佐力药业发布2023年业绩快报,全年实现营业收入19.42亿元,同比增长7.61%,净利润3.86亿元,同比增长41.55%。同时,佐力药业还预计,2024年一季度实现净利润1.37亿元—1.47亿元,同比增长40.58%—50.84%。稍早前,也预计一季度净利润同比增长不低于25%。
  • 瑞幸咖啡:公司已向开曼法院正式提交了对可转债债权人的债务重组方案

      在体验阶段藉由开发中的PS5游戏版本,投身进入新现身的圣休亚瑞,很明显《暗黑破坏神4》带回《暗黑破坏神》首两款游戏的残酷调性。这个世界比《暗黑破坏神3》更成熟也更贴近大众,并重新加入对恐怖与惊吓元素的关注。旅途中可见白雪上堆满死尸。经过人来人往的小镇时,你可以听到愤怒和痛苦的嚎叫声。柔和的月光照在神圣之地上,彰显出如鬼域般的荒凉。故事沉重的主题聚焦于仇恨上,描述它如何侵蚀曾经充满希望的心灵,它的腐败和造成的影响,这些元素相加乘的效果,很容易让人迅速沉浸其中。自然而然,我们不可避免地会产生一种想当英雄的冲动,不管背后的原因是什么,想阻止它并让圣休亚瑞的痛苦结束。
  • 期指三大合约联袂上涨 IC合约贴水大幅收敛

      在张志磊参赛前22个小时,他的经纪人李茂沛在手机上发出文字,告诉了抖音平台负责版权的工作人员这个消息。
  • 奇牛国际:美联储主席鲍威尔表示 未来加息面临阻力

      新华社开罗3月11日电(记者张猛)喀土穆消息:苏丹武装部队和苏丹快速支援部队之间的交火在11日斋月首日仍在继续,联合国安理会敦促苏丹冲突方斋月停火的决议未得到落实。
  • 任泽平:个税缴纳人群增加 调节收入分配作用有限

      原标题:构建多元化、多层次培养结构和体系培厚拔尖人才生长土壤(让更多基础研究人才竞相涌现)
  • 买超百亿!北上资金归来,这次有何不一样?

      《那年花开月正圆》、《白夜追凶》、《使徒行者2》、《爸爸去哪儿5》……近期,一批热门影视剧和综艺,成为各大视频网站争先抢占的“阵地”,最新的剧集和节目,通常需要用户充值购买,成为各家网站的“VIP会员”后才能观看。
  • 周杰伦演唱会海口站延期举办 具体时间将另行通知

      本报也了解到,在坚持《总体方案》同时积极鼓励俱乐部招商引资的双重考虑下,年初中国足协和中足联筹备组修订了《职业足球俱乐部和球队名称管理规定》,并组织了全体中超俱乐部研讨,综合各方意见出台了《名称使用实施细则》,对于球队名称使用,做出了相关规定。在长挂时钟角标的问题上,中足联筹备组还在制定规定前安排了制作中心模拟了9个字甚至更多字符时的情况,但转播效果非常不好。最终综合考虑转播效果和俱乐部公平等各方面原因后,确定以6个汉字为上限。
  • 周杰伦《等你下课》:请还给我,教室里的爱情

      浙江俱乐部vs上海海港32087人
  • 谭雅玲:美元贬值发力为加息铺垫

      刘瑞欣总结比赛时说:“我觉得90分应该没有问题,因为这是我个人在LPGA的成绩。再加上3个月没有打球回来,第一场打成这样我觉得比较满意的个人。”
  • 第26号台风"玉兔"生成冷空气到货 接下来广州天气...

      近年来,美国政府不遗余力地推进“美国制造”。2021年1月,美国政府签署“买美国货”行政令,要求联邦政府采购更多本土产品与服务。此后,美国政府相继出台《两党基础设施建设法案》《芯片与科学法案》《通胀削减法案》等多项法案,以增强美国供应链安全为由,对涉及电动汽车、半导体、太阳能电池板、风力涡轮机等产品的本土高端制造业提供巨额投资和补贴。
  • 全国人大代表林水栖、张巧良、钟波、钟铮谈司法护航民营经济发展——以法治提信心稳预期促发展

      不同阶段面临着不同机遇与挑战。现阶段,于涂料行业而言,需做三方面准备,第一充分的市场调研;第二国家政策的清晰解读;第三内外环境的双向调研。唯有做好内功才能应对未来的风浪。中国建筑装饰装修材料协会建筑涂料分会秘书长朱厚举表示,非常同意嘉宝莉集团副总裁许有为的观点。现下的局势是所有企业面临的行业“卡点”,对于出现的全球疫情和经济分化,这是行业产品上的卡点,谁把卡点解决了,谁就除掉了行业的痛点。现在是做好内功的好时机,只有做好选择题,才能更好应对未来挑战。
  • 常常“鸡飞狗跳” 家长和孩子“手机争夺战”如何平息

      中国人民大学首都发展与战略研究院研究员、国际关系学院教授李庆四对本报记者表示,美国基础设施多兴建于上世纪50年代,如今,大量基础设施已陈旧老化,存在更新和修缮需求。同时,过去30多年的产业转移造成了美国制造业空心化,由制造业繁荣而产生的中产阶级群体也随之萎缩。因此,美国近几届政府都有意振兴本土制造业,但政策均未取得明显效果。本届美国政府继续加大资金投入和政策扶持,希望促成制造业回流。然而,冰冻三尺非一日之寒,激进推行“美国制造”可能要付出高昂代价。