天堂岛精品🔇_轻轻剥开你的罩子一口咬上头-艺文笔记

王金豹 2025年11月13日 23:00:35
发布于:曼谷

天堂岛精品🔇_轻轻剥开你的罩子一口咬上头_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

TROUBLE-SHOOTING 1. General Use the data below to trouble-shoot the main landing gear. WARNING: YOU MUST DO A HARD LANDING CHECK AFTER A HARD LANDING. HARD LANDINGS CAN CAUSE DAMAGE TO THE STRUCTURE AS WELL AS THE LANDING GEAR. Complaint Possible Cause Remedy Strut bent. Hard landing. Do a hard landing check. Refer to Chapter 05-50. Replace the strut. Negative camber. Strut bent, Hard landing. Do a hard landing check. Refer to Chapter 05-50. Replace the strut. Too much tire wear. Incorrect toe-in. Adjust the toe-in. Refer to Test Adjust The Main Landing Gear procedure. Landing Gear DA20-C1 AMM Page 102 19 Dec 1997 32-10-00 Doc # DA201-C1 Rev. 0 Intentionally left blank DA20-C1 AMM Landing Gear Doc # DA201-C1 Rev. 14 32-10-00 Page 201 30 Oct 2008 MAINTENANCE PRACTICES 1. General These maintenance practices tell you how to remove and install components of the main landing gear and adjust the main landing gear. Refer to the manufacturer for further data. 2. Remove/Install the Main Landing Gear Strut A. Equipment Item Quantity Reference Airplane jacks 2 Commercial Tail former 1 ? B. Remove the Main Landing Gear Strut (Refer to Figure 1 - Sheet 1) Detail Steps/Work Items Key Items (1) Lift the airplane on jacks. Refer to Chapter 07-10 (2) Remove the wheel fairing: − Remove the outer bolt. − Remove 2 screws on the inner side. If installed (3) Remove the back-plate from the brake caliper. Refer to Chapter 32-40 (4) Remove the wheel. Refer to Chapter 32-40 (5) Release the brake caliper. (6) Release the brake pipe from the strut. Tie the brake caliper back. Do not stress the brake pipe. (7) Remove the 4 bolts which attach the axle. Remove the axle, torque-plate and fairing mount. Only if you will install a different strut. (8) Disconnect the bonding cable from the strut. (9) Remove the nut, washers and bolt at the inner mount attachment-bracket. (10) Remove the nuts and washers, retaining bar, inserts and brass strips at the outer mount attachment-bracket. Hold the strut! (11) Remove the strut. Move the strut outboard. Landing Gear DA20-C1 AMM Page 202 30 Oct 2008 32-10-00 Doc # DA201-C1 Rev. 14 C. Install the Main Landing Gear Strut (Refer to Figure 1 - Sheet 1) Detail Steps/Work Items Key Items (1) Examine the spar bridge in the area of the main gear mountings. Look specially for damage to the GFRP structure Refer to Chapter 51-10 for GFRP inspection procedures. (2) Put the new strut in position. Move it inboard through the fuselage slot. (3) Put the inserts and brass strips in position above and below the strut at the outer mount. Hold the strut! Choose inserts to give 0.5mm (0.02 in) compression when tight. (4) Apply grease to the brass strips and the bolts. Use MIL-G-3545 grease. (5) Install the retaining bar. Install the washers and nuts to hold the retaining bar to the outer mount attachment-bracket Torque to 20 Nm (14.8 ft.lb.) (6) Apply grease to the washers and the bolt. Use MIL-G-3545 grease. (7) Install the bolt, washers and nut at the inner mount attachment-bracket. Refer to Figure 1 - Sheet 1. Make sure that 1 plain washer and the belleville spring washers are between the top of the strut and the mounting block. If necessary, install up to 2 plain washers between the spring washers and the mounting block to make the airplane level. (8) Tighten the nut on the inner bolt. To give a height of the spring washers of 4 +0.5mm -0 (0.16 +0.02 -0 in). (9) Connect the bonding cable to the strut. If you install a bonding terminal on a new strut, remove the surface protection where the terminal will attach. Then varnish the area with NYCOTE 7-11. (10) Install the axle, torque-plate and fairing mount. Install the 4 bolts which attach the axle. Only if you install a different strut. Torque 13.6 - 15.8 Nm (120 - 140 in.lb.). (11) Attach the brake pipe to the strut. (12) Install the brake caliper. Refer to Chapter 32-40 (13) Install the wheel. Refer to Chapter 32-40 (14) Install the back-plate to the brake caliper. Refer to Chapter 32-40 (15) Install the wheel fairing: − Install the outer bolt. − Install 2 screws on the inner side. Airplanes with wheel fairing option only. (16) Lower the airplane with the jacks. (17) Do a test for correct adjustment of the landing gear. See paragraph 3 DA20-C1 AMM   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:钻石20系列AMM 2

原标题:
80 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 听说杨紫终于找到了本命化妆师

      饮用水也不一定要喝到肚子里,只要和嘴能沾边,那就是新增的消费场景。
  • 李馨玥:3.12黄金高位横盘时间换空间,日内先顺势低多再看数据!

      项目所在的石景山区1616街区内规划建设有多个住宅小区,随着居民人数不断增长,对公共服务配套提出更高要求。学校建成后,将引进区内优质教育资源,为周边适龄少年儿童提供优质教育服务,有利于完善社区配套设施功能,促进区域内教育事业均衡发展。
  • 股市下跌与熔断机制无关

      菩提心,即众生无边誓愿度,烦恼无尽誓愿断,为了众生离苦得乐发誓修一切种智、誓愿成佛之心。怨亲平等,即于一切众生平等饶益,无彼我相。报佛恩,即知佛恩难报,当于此世勇猛精进,弘扬佛法,广度众生。观罪性空,即罪无自性,从因缘生,作诸恶业而生诸罪。亦从因缘灭,洗心忏悔则罪灭。
  • 24岁儿媳与五旬公公私奔 丈夫受打击自杀

      动力及续航方面,新款Taycan基础版车型最大功率300kW,0-100km/h加速时间4.8s,WLTP工况最高续航678km。新款TaycanTurboS车型最大功率700kW(超增压模式),0-100km/h加速时间2.4s,WLTP工况最高续航630km。3月11日,我们将会对新款保时捷Taycan的发布进行报道,敬请期待。(责编:张大威)
  • 华达利总裁直播圈粉,HTL全球沙发大师打造O2O沉浸式场景

      但显然,2024年未来需要转变策略了。3月5日,蔚来发布了2023年Q4及全年财报,在全年营收556.2亿元创下新高的同时,净亏损也扩大到史无前例的207.2亿元,全年毛利为5.5%,也比去年少了一半。
  • 人民币长期取决于改革前景

      韩骁律师指出,不管是上述哪一种情况,只有购买了影视剧的视频网站可以播放。“在微博评论中,出售热播影视剧或综艺节目资源的商家,侵犯了视频网站的著作权或者侵犯了视频网站的专有使用权,以及影视剧著作权所有人的著作权。”韩骁称,根据《中华人民共和国著作权法》第四十八条的相关规定,对于出售资源的商家,“应当根据情况,承担停止侵害、消除影响、赔礼道歉、赔偿损失等民事责任。”同时,不良商家的侵权行为若损害了公共利益,可以由著作权行政管理部门责令停止侵权行为,没收违法所得,没收、销毁侵权复制品,并可处以罚款。
  • 通州宋庄新盘案名曝光:建投国贸·瑨上 低密洋房社区

      第一代MINICOUNTRYMAN发布于2010年,国内那场发布会的主题是“GETWAY”翻译过来就是“开溜”,时至今日这仍然是让我印象深刻的一次活动。而全新的第三代MINIJCWCOUNTRYMAN则是我近期试驾到的最好玩的车,不仅是说它的钢炮性能,还包含了车内无数的彩蛋设计。罗卡角的风景很壮阔,MINIJCWCOUNTRYMAN感受很热辣,面对越来越卷的生活,找点快乐很重要。
  • 铃鹿纯彩石×商丘金沙壹号院,打造高奢新体验!

      王笑宇表示,文旅IP自身的产业链延伸既广阔又深入,大部分主题乐园是由“小镇+乐园”的产品模型构成,搭配度假酒店以及商业街区等。乐园内,新IP的推出可以进一步带动包括餐饮、文创以及商业等多种消费业态的增长。而在乐园周边,一批住宿、餐饮、休闲娱乐等配套设施也将随着新园区、新IP的上新,涌入大量客流,进一步承接主题乐园溢出效应。
  • 现货钯金日内跌幅达2.00%,现报1014.75美元/盎司。

      今年两会期间,加快氢能产业发展首次被写入政府工作报告,将其定位为“前沿新兴产业”,名列2024年重点工作之一,与此同时,多位两会代表委员也提交了与氢能产业发展相关的建议。另据不完全统计,在今年初的地方两会上,31个省级行政区中有22个将氢能写入政府工作报告,提及氢能发展的省份数量保持逐年增加的趋势。对此,有预测称,到2025年,我国氢能产业产值将达到1万亿元。
  • 人民日报批“三无网游”:内容破底线 外挂很猖獗

      经典《暗黑破坏神》进化之作
  • 时隔5年后重启!谌贻琴出席这一重要活动

      为满足印尼当地市场需求及全球化战略布局的需要,赛轮集团股份有限公司(以下简称“公司”)拟在印尼投资建设“年产360万条子午线轮胎与3.7万吨非公路轮胎项目”。项目投资总额25,144万美元,其中:建设投资20,429万美元、流动资金4,329万美元、建设期利息386万美元。
  • 需求虽迟到但并未缺席 冬季动力煤企稳回升可期

      就在刚刚,吓死我了,就在我身边发生的一件事。
  • 夺冠后波奇享受啤酒浴 响尾蛇冬眠休养重头再来

      2023大家居建装行业的百大新品——卫浴篇
  • 北京——中建·云境丨楼盘测评

      李鸿彬:近几年,国家大力推行的“双减”政策已经取得了阶段性良好成效,但教育负担过重的问题仍然存在。家长拔苗助长、学校“唯分数论”,孩子身心都累。