糖心logo官网✅_爆乳女教师高清BD🍝-艺文笔记

王金豹 2025年11月13日 13:09:21
发布于:曼谷

糖心logo官网✅_爆乳女教师高清BD🍝_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499, Post SB 28-1087 For A/C 001-049,051-061,101-105,201-203,  A. Table of the circuit breakers referred to in this procedure:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/FQI/CHAN/1 1QT A13 121VU FUEL/FQI/CHAN/2 2QT M27  B. Test NOTE : This task gives an alternative procedure (with a different start) ____ for trouble shooting a wing-tank fuel-probe malfunction. It is shown here for the fused connector plugs only.  NOTE : This test (and procedure) is written for a left wing fuel-probe ____ malfuction with the right wing items (FINs) given in parenthesis if applicable.  (1) Do the power on BITE test of the FQIS as follows:  (a) If the FQIS is not energized:  1 Close the C/Bs 1QT and 2QT.

_ 2 Energize the Aircraft Electrical Circuits from the External _ Power (Ref. AMM TASK 24-41-00-861-002).  (b) If the FQIS is energized, reset the FQIC as follows: 1 Open the C/Bs 1QT and 2QT. _  2 Wait 5 seconds.

_  3 Close the C/Bs 1QT and 2QT.

_ NOTE : For the FQIC to do a (new) power up BITE test, a power ____ supply interrupt (interval) of more than 5 seconds is necessary. This gives the current status of the FQIS components.  (2) Do the EIS Start Procedure (ECAM only) (Ref. AMM TASK 31-60-00-860-001).

 (3) On the ECAM control panel, push (in) the FUEL P/BSW.

 (4) Make sure that the FUEL page shows on the ECAM lower display unit.

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 001-049, 051-099, 101-149, 151-199, ∞∞28-42-00∞∞∞∞∞∞∞∞∞∞Page C298  201-299, 401-499, Aug 01/05 CES

 (5) Wait 60 seconds.

 (6) Continue as follows:

 NOTE : The FUEL page FQIs will show XXs in amber color, for 35 ____ seconds, during the FQIC power up BITE test. A FQIS sensor fault must be sensed by the FQIC for 60 seconds before the applicable LRU identification is transmitted to the CFDS as unserviceable. The fault message is shown on the MCDU when set to SYSTEM REPORT/TEST (FUEL) and the FQIS STATUS page.  (a) Do the procedure to get access to the SYSTEM REPORT/TEST menu page (Ref. AMM TASK 31-32-00-860-001).

 (b) When the SYSTEM REPORT/TEST menu page comes into view, push the line key adjacent to FUEL.

 (c) When the FUEL menu page 1 comes into view, push the NEXT PAGE key on the MCDU keyboard to see the FUEL menu page 2.

 NOTE : If a menu has more than one page (shown by the more to ____ come symbol > on the top line, right side of the MCDU display) each operation of the NEXT PAGE key on the MCDU keyboard will cause the next page to be shown. When the last page of any menu is shown, operation of the NEXT PAGE key will cause the first page to be shown.  (d) When the FUEL menu page 2 comes into view, push the line key adjacent to FQIS STATUS.  (7) Examine the FQIS STATUS page.

 (8) Make a record of all the wing-tank fuel-probes shown on the FQIS STATUS page.

 (a) If the FQIC (3QT) is shown, trouble shoot the Fuel Quantity Indication Computer (FQIC) 3QT (Ref. TASK 28-42-00-810-801) before you do more steps.

 (b) If no FQIS messages are shown, maintenance steps are not necessary.

 (9) Open the C/Bs 1QT and 2QT.

 (10) Remove the access panel 574BB (674BB) located on the lower surface of the wing (false spar box). It is forward of and between flap track 2 and the out board edge of the inner flap (Ref. AMM TASK 05-25-70-200-004).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 001-049, 051-099, 101-149, 151-199, ∞∞28-42-00∞∞∞∞∞∞∞∞∞∞Page C299  201-299, 401-499, Aug 01/05 CES

 (11) Get access through the opening 574BB (674BB). The fused connector plugs are installed below the tank wall connectors 4039VC1 and 4040VC1 (4039VC2 and 4040VC2).

 (12) Swap the positions of the fused connector plugs 4041VC-A and 4043VC-A (4042VC-A and 4044VC-A).

 (13) Close the C/Bs 1QT and 2QT.

 (14) Do steps (5) thru (8) again.

 NOTE : This is necessary because when the C/Bs were set to open and ____ the 28VDC removed from the FQIS in step (9) the CFDS display (on the MCDU) will return to the top menu.  (15) Compare the two FQIS STATUS records that you made.

 (16) If the original (reported) FQIS message:   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 FUEL 燃油4

原标题:
58 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • “地中海”的脑袋,扎个丸子头就得了?装X一时爽……

      龙鳞采用珐琅工艺,龙身的下半部分则采用金箔雕花珐琅工艺(paillonnéenamel)。这种极为罕见的珐琅工艺需要在各层半透明珐琅之间放置纤薄金箔,用微型刷头进行绘制,是制表领域中最为精密的装饰工艺之一。
  • 广西贵港通报“一小学教师粗暴对待学生”:已对涉事教师停课处理

      经中国家居产业发展峰会组委会研究决定,特聘央视网产业发展事业群总监马桦,新华网客户端融合发展中心副总经理李鹏,中国质量网家居负责人张晓辉,搜狐家居总经理郑海云,北京商报家居事业部主任吴厚斌,优居副总裁、优居研究院院长张永志,网易家居全国总编胡艳力,新浪家居全国总编王晶,中国网家居主编纪海晨,凤凰网家居全国主编李文娟,家页传媒主编宗书慧,为产业发展战略及媒体评审团成员。
  • 周末娱乐指南:新综艺《我想开个店》开播!

      作为养老社区,天津乐境的设计十分注重细节打造,旨在让景观服务生活。从建筑设计、楼体色彩到灯具选材、出风口的设置,无论室内建筑、室外园林等各个空间,天津乐境都以老人视角做细每一处关怀。
  • 安德利产销量停滞:分红率低大量资金用于投资 IPO募资必要性存疑

      Lemaire于2006年创立于法国,由设计师ChristopheLemaire和Sarah-LinhTran以冷色系为主基调打造的服装品牌。
  • 外媒:谷歌确实该打,但别打错了地方

      “1000多年前的剪纸长什么样?”“‘总把新桃换旧符’中的桃符是春联前身吗?”春节假期,武汉博物馆邀请多组亲子家庭共话年俗。社教老师以甲骨文中的“年”字为引,带领大家感受年俗之美。武汉博物馆有关负责人表示,将深挖馆藏文物资源,不断拓宽宣教渠道,创新社教方式,讲好武汉故事,传承中华文化。
  • 韩玮:2020年A股进入牛市第二阶段

      国家发改委分析指出,3月第1周猪价呈现降-涨-降走势,均价略高于上周。周前期,终端需求较为疲软,屠宰企业压价意向较强,猪价略有走低;周中期,随着二次育肥热度提升,市场供应量持续收紧,猪价自南向北联动上涨;但终端消费改善有限,周后期屠宰企业压价意向再度转浓,猪价止涨转跌。供需博弈激烈,但养殖单位仍有抗价情绪,预计3月第2周猪价或频繁涨跌调整。
  • 新能源汽车产销双降 2月乘用车销量回落

      在电池结构设计上,神炼电池采用高强度箱体设计,大幅提升碰撞安全性能。独创的MUST多功能一体化结构实现高集成、高强度、热管理等多功能合一,维护成本更省。此外,神炼电池依托首创的电芯“问顶技术”,确保电芯不泄漏、不析锂、不起火,不爆炸。
  • 伦敦“救不了”Shein

      所以阴差阳错之下,苹果错过了入局新能源汽车的第一个时间窗口。而当库克再一次想起乔布斯生前留下的那“一闪而过的灵光”时,时间就已经到了2014年。
  • 苹果iOS和华为鸿蒙OS安全性哪家强?看完详解我懂了

      北京市教委明确,中小学组织研学旅行活动坚持学生和家长自愿参加原则,不得将学生参加研学旅行活动情况作为学校教育评价的依据和标准,不得与学生升学、毕业挂钩。同时,学校不得以组织研学旅行为名开展变相旅游,确保研学旅行和学校课程有机融合,避免学生“只旅不学”。学校应为不参加活动的学生提供相关课程学习机会,确保学习效果。
  • 6大货币对、美元指数及黄金阻力/支持位

      显而易见,这个时候全球范围内的新能源汽车行业已经“大局已定”。苹果再难超越特斯拉,成为那个半路杀出、掌握智能汽车话语权的黑马了。
  • 赵明回应荣耀将创立子品牌:还需观察

      近年来,美国政府不遗余力地推进“美国制造”。2021年1月,美国政府签署“买美国货”行政令,要求联邦政府采购更多本土产品与服务。此后,美国政府相继出台《两党基础设施建设法案》《芯片与科学法案》《通胀削减法案》等多项法案,以增强美国供应链安全为由,对涉及电动汽车、半导体、太阳能电池板、风力涡轮机等产品的本土高端制造业提供巨额投资和补贴。
  • 11月2日 COMEX 12月期银未平仓合约减少4132手

      来源:《中国外汇》2024年第5期