在线看免费❗_姬辱-艺文笔记

王金豹 2025年11月10日 16:43:59
发布于:曼谷

在线看免费❗_姬辱_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 - install 540AB, 540BB, 540CB, 540DB, 540EB, 540FB, 540GB, 540HB, 540JB, 574BB

 - install 640AB, 640BB, 640CB, 640DB, 640EB, 640FB, 640GB, 640HB, 640JB, 674BB.

 (3)  Remove the HOOK-COVER (RIB 2 SURGE DOORS) and carefully close the door 540AZ (640AZ).

 Subtask 28-42-43-650-053  B. Fuel Configuration  (1) Refuel, defuel or transfer fuel as necessary (Ref. TASK 12-11-28-650-003), (Ref. TASK 28-25-00-650-001) or (Ref. TASK 28-25-00-869-001).  Subtask 28-42-43-942-054  C. Removal of Equipment  (1)  Remove the safety barriers.

 (2)  Remove the warning notice(s).

 (3)  Remove the access platform(s).

 (4)  Remove the ground support and maintenance equipment, the special and standard tools and all other items.

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-43Page 476 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 TASK 28-42-43-000-003

 Removal of the Wing-Tank Outer-Cell Group A Harness 15QT1(15QT2)  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU _______ START A TASK ON OR NEAR:  - THE FLIGHT CONTROLS

 - THE FLIGHT CONTROL SURFACES

 - THE LANDING GEAR AND THE RELATED DOORS

 -COMPONENTS THAT MOVE.  WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING _______ GEAR.  1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific blanking cap No specific circuit breaker(s) safety clip(s) No specific safety barriers No specific string No specific tape No specific access platform 4.0 m (13 ft. 1 in.) R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-43Page 477 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 B. Referenced Information

 -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 28-10-00-910-001  Safety Procedures When You Do Work in a Fuel Tank  28-10-00-910-002  Access to the Fuel Tanks and the Work Areas  28-25-00-650-001  Pressure Defuel  28-25-00-650-003  To Drain Remaining Fuel from the Wing Tanks and the  Center Tank  57-27-11-000-002  Removal of the Access Panel (540HB, 540JB, 540KB,  540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,  550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,  ....)  28-42-43-991-003  Fig. 401  28-42-43-991-009  Fig. 405  28-42-43-991-008  Fig. 408  28-42-43-991-005  Fig. 409  28-42-43-991-012  Fig. 410  3. Job Set-up__________  Subtask 28-42-43-941-058  A. Safety Precautions

 WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK. _______  (1) You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.  (2) Put the safety barriers in position. Subtask 28-42-43-860-050  B. Fuel Configuration  (1)  Defuel the applicable fuel tank (Ref. TASK 28-25-00-650-001).

 (2)  Drain the remaining fuel from the applicable fuel tank (Ref. TASK 28-25-00-650-003).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-43Page 478 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 28-42-43-865-056

 C. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/FQI/CHAN/1 1QT A13 121VU FUEL/FQI/CHANNEL/1 AND 2 8QT L26 121VU FUEL/HI/LVL/SPLY 1QJ L25 121VU FUEL/FQI/CHAN/2 2QT M27 121VU FUEL/PUMPS/2/R CTL AND L IND 10QA R29 121VU FUEL/CTR TK/PUMPS1 AND 2/CTL AND IND 32QA R26 121VU FUEL/CTR TK/PUMPS1 AND 2/CTL AND IND 31QA R25 121VU FUEL/PUMPS/1/L CTL AND R IND 3QA R23  Subtask 28-42-43-010-057  D. Get Access  (Ref. Fig. 401/TASK 28-42-43-991-003)

 (1)  Put the access platform in position below the applicable access zone 540(640).

 (2)  Remove the applicable access panels (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-27-11-000-002):   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUEL 燃油6

原标题:
45 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 国务院新组建直属机构首任局长,亮相全国两会记者会

      古代的诸侯王一旦势力增大之后,就总想着拥兵自立,而对于当代线下的头部经销商来说,也不乏做大后想谋求更多利益的情况。
  • 国海良时期货:双焦短期或见顶下探

      天津乐境在建设规划方面坚持“以人为本”,充分考虑居住品质、空间环境、适老化设计、绿色节能等多方面要求。社区建筑曾获LEED金级奖项认证,意味着在绿色建筑方面具有杰出表现。同时,项目还曾获2023年中国土木工程詹天佑奖优秀住宅小区金奖。
  • 港珠澳大桥今日通车 多项创新打破海上桥梁工程极限

      ▲图源:Youtube,IntroducingProjectTitanTheAppleCar
  • 苹果确认用USB

      JohnTernus,硬件工程高级副总裁
  • 微商区块链成诈骗新马甲 日均新增传销平台约30个

      谈到路易威登的制表理念,就必须提及位于日内瓦郊区的LaFabriqueduTemps高级制表工坊,这是路易威登深耕制表业的关键一步。LaFabriqueduTemps,翻译过来即“时间的工厂”(TheFactoryofTime),它坐落于腕表制造圣地瑞士,瑞士制表历史可追溯至四个世纪之前。
  • 刘涛绿洲晒自拍照状态佳 清新薄荷绿皮衣飒气十足

      她建议,由市场监管部门牵头,联合文旅、公安、网信、教育等部门,开展涉未成年人文创产品整治专项行动,对文创企业、校园周边店铺、地摊、本地网络电商平台等生产销售的低俗文创产品进行集中查处。加大常态化监管巡查力度,加强对面向未成年人的玩具、文具的监管;压实电商平台的监管主体责任,督促相关平台严格审核入驻商家的生产、经营资质,并利用技术手段对商家待发布产品进行审核,防范暴力、色情等低俗文创产品流入市场。
  • 风向突变美元失宠,全因美联储官员自乱阵脚

      到底比L9好在哪儿,MEGA没说清楚
  • 新浪VR

      一个疏远你的人,其实根本不会在意你怎么看他,怎么想他,也不会在意你哪一天会离他而去。
  • 英锦赛奥沙利文10

      去年十一月,李斌在公开信强调:三年内不提升财务表现的项目将被推迟和削减,以确保公司的长期竞争力。去年底,蔚来汽车宣布裁员10%,电池业务也把制造环节外包。根据李斌的测算,裁员举措将在2024年给蔚来节省20亿元。
  • 黄力晨:降息押注支撑黄金上涨 警惕非农意外爆冷

      问:教育事业的发展,可能是一场“持久战”。对于当下正在因为学业而挣扎的学生和家长,您有什么建议吗?
  • 黄金突破楔形上轨,目标见1227.30

      2016年7月18日,习近平来到固原市原州区万亩冷凉蔬菜生产基地考察。原州区被誉为“中国(西部)冷凉蔬菜之乡”。然而,水资源短缺、利用率不高,以及水利基础设施薄弱等因素曾一度卡住了蔬菜种植这一富民产业的“脖子”。近年来,当地修建了10万至20万立方米大型调蓄水池20座,建成高效节水农业示范基地24处,开发高效节水灌溉土地面积32万亩,这些喷灌水利设施有力促进了蔬菜种植产业的规模化发展,带动当地村民脱贫奔小康。△冷凉蔬菜种植已成为当地的致富产业
  • 传言流出,马克龙愤怒回击!

      3月11日(周一),珠海港控股集团有限公司公告,根据珠海市人民政府国有资产监督管理委员会下发的《关于马小川等免职的通知》,免去马小川珠海港控股集团有限公司董事、财务总监职务,免去黄建斌、裴书华、齐雁兵等珠海港控股集团有限公司董事职务。目前公司尚未收到新任董事的任命文件,待收到相关任命文件后,公司将及时对外披露新任董事相关信息。
  • 中国体育报:为排球联赛教练流动点个赞

      排在第七名的是上汽通用五菱,2月重新回到榜单前十排名,销量为4.6万辆,同比下滑20.4%,市场份额为4.2%。
  • “90后”旅行即生活 边走边订成消费一大特色

      科技股多数下跌,苹果、谷歌母公司Alphabet分别上涨1.18%、1.67%,微软、亚马逊、Meta、奈飞分别下跌0.39%、1.93%、4.42%、0.64%。此外,特斯拉上涨1.39%。