国内精品♨️_www.ktt2048.com 看天堂-艺文笔记

王金豹 2025年11月15日 00:24:34
发布于:曼谷

国内精品♨️_www.ktt2048.com 看天堂_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 - install 540AB, 540BB, 540CB, 540DB, 540EB, 540FB, 540GB, 540HB, 540JB, 574BB

 - install 640AB, 640BB, 640CB, 640DB, 640EB, 640FB, 640GB, 640HB, 640JB, 674BB.

 (3)  Remove the HOOK-COVER (RIB 2 SURGE DOORS) and carefully close the door 540AZ (640AZ).

 Subtask 28-42-43-650-053  B. Fuel Configuration  (1) Refuel, defuel or transfer fuel as necessary (Ref. TASK 12-11-28-650-003), (Ref. TASK 28-25-00-650-001) or (Ref. TASK 28-25-00-869-001).  Subtask 28-42-43-942-054  C. Removal of Equipment  (1)  Remove the safety barriers.

 (2)  Remove the warning notice(s).

 (3)  Remove the access platform(s).

 (4)  Remove the ground support and maintenance equipment, the special and standard tools and all other items.

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-43Page 476 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 TASK 28-42-43-000-003

 Removal of the Wing-Tank Outer-Cell Group A Harness 15QT1(15QT2)  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU _______ START A TASK ON OR NEAR:  - THE FLIGHT CONTROLS

 - THE FLIGHT CONTROL SURFACES

 - THE LANDING GEAR AND THE RELATED DOORS

 -COMPONENTS THAT MOVE.  WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING _______ GEAR.  1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific blanking cap No specific circuit breaker(s) safety clip(s) No specific safety barriers No specific string No specific tape No specific access platform 4.0 m (13 ft. 1 in.) R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-43Page 477 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 B. Referenced Information

 -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 28-10-00-910-001  Safety Procedures When You Do Work in a Fuel Tank  28-10-00-910-002  Access to the Fuel Tanks and the Work Areas  28-25-00-650-001  Pressure Defuel  28-25-00-650-003  To Drain Remaining Fuel from the Wing Tanks and the  Center Tank  57-27-11-000-002  Removal of the Access Panel (540HB, 540JB, 540KB,  540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,  550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,  ....)  28-42-43-991-003  Fig. 401  28-42-43-991-009  Fig. 405  28-42-43-991-008  Fig. 408  28-42-43-991-005  Fig. 409  28-42-43-991-012  Fig. 410  3. Job Set-up__________  Subtask 28-42-43-941-058  A. Safety Precautions

 WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK. _______  (1) You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.  (2) Put the safety barriers in position. Subtask 28-42-43-860-050  B. Fuel Configuration  (1)  Defuel the applicable fuel tank (Ref. TASK 28-25-00-650-001).

 (2)  Drain the remaining fuel from the applicable fuel tank (Ref. TASK 28-25-00-650-003).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-43Page 478 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 28-42-43-865-056

 C. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/FQI/CHAN/1 1QT A13 121VU FUEL/FQI/CHANNEL/1 AND 2 8QT L26 121VU FUEL/HI/LVL/SPLY 1QJ L25 121VU FUEL/FQI/CHAN/2 2QT M27 121VU FUEL/PUMPS/2/R CTL AND L IND 10QA R29 121VU FUEL/CTR TK/PUMPS1 AND 2/CTL AND IND 32QA R26 121VU FUEL/CTR TK/PUMPS1 AND 2/CTL AND IND 31QA R25 121VU FUEL/PUMPS/1/L CTL AND R IND 3QA R23  Subtask 28-42-43-010-057  D. Get Access  (Ref. Fig. 401/TASK 28-42-43-991-003)

 (1)  Put the access platform in position below the applicable access zone 540(640).

 (2)  Remove the applicable access panels (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-27-11-000-002):   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUEL 燃油6

原标题:
92 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 联储不加息人民币贬值压力下降

      风云T6是相当注重空间体验的车子,试驾车的第二排双座椅还是采用立体感较强的设计,对大腿的承托相当之好。中间的座椅虽然造型一般,但因填充物的加分,长途乘坐也不至于太辛苦。整体来看第二排的空间表现不俗,体验者的头部和膝部的剩余空间都对得起它2672mm的轴距。
  • 碧桂园“病危”进ICU?

      本报也了解到,在坚持《总体方案》同时积极鼓励俱乐部招商引资的双重考虑下,年初中国足协和中足联筹备组修订了《职业足球俱乐部和球队名称管理规定》,并组织了全体中超俱乐部研讨,综合各方意见出台了《名称使用实施细则》,对于球队名称使用,做出了相关规定。在长挂时钟角标的问题上,中足联筹备组还在制定规定前安排了制作中心模拟了9个字甚至更多字符时的情况,但转播效果非常不好。最终综合考虑转播效果和俱乐部公平等各方面原因后,确定以6个汉字为上限。
  • 2月CPI同比由降转涨 更多扩内需政策酝酿出台

      很多时候要知晓,突然冷落你的人,一定跟另一个人有关系,他在冷落你的同时,或许正在捂热别人,这就是残酷的现实。
  • 大女人or小女人 男人们到底更偏爱哪一种类型

      我要怎么做,会让你感觉好一些?
  • 贺博生:黄金晚间非农数据涨跌趋势分析 最新多空操作建议指导

      在金融界工作20多年的王女士表示,金融圈的工作一向被外界认为高大上,毕业生非常向往。中国人传统讲人情关系,大家身边有熟人朋友需要找实习机会的时候,顺手帮助推荐也算成人之美。“如果不涉及金钱利益,大家可能觉得就是帮了个忙,付出一份人情。但是明码标价就让事情变了性质。有人可能觉得这事在市场经济下可以理解,但我觉得做金融的人,特别是到了能决定录用实习生的级别,收入应该是不菲的,还要赚学生们的这份钱,只会让人看不起。”
  • 油炸知了成网红美食 实地探访:金蝉价格10年涨5倍,千人上山抓蝉有人月入数千

      在新疆阿克苏地区温宿县,围绕冰雪运动等相关产业,当地打造多功能冰雪旅游项目,设置了儿童雪圈滑道、体验滑道等不同区域,还推出多项冰雪旅游精品路线和优惠政策。
  • 原油反弹迟缓化工板块走弱 黄金连涨三天

      “这表明我国政府对其发展寄予厚望,并将其视为外贸创新、消费升级和中小企业‘走出去’的重要推动力量。”中国数实融合50人论坛智库专家洪勇认为。
  • SU7定档官宣, 小米集团股价起飞!造车新势力的春天来了

      最近,汪小菲在直播间聊起自己的情感问题,高调宣布很爱现任女友“小梅”,并透露将在今年结婚。此事给汪小菲直播间注入的能量有限,他最近一周带货50万-75万元。
  • AI巨头英伟达突现高位跳水

      条纹制服风格衬衫解开扣子,与中袖黑色皮西装叠搭。她搭配黑色裤子和方头靴子,并戴了一副Bayonetta眼镜、银色耳环、戒指和优雅的金表,给人呈现既传统又新潮感。
  • 大企业在大小银行之间存款套利?数据并不支持此观点

      本次行权相关股票期权费用将根据有关会计准则和会计制度的规定,在等待期内摊销,并计入相关费用,相应增加资本公积。根据公司《2019年股票期权激励计划(草案)》,假设本期可行权的股票期权全部行权,公司总股本将由7,122,786,109股增加至7,126,490,722股,对公司基本每股收益及净资产收益率影响较小,具体影响以经会计师事务所审计的数据为准。
  • 别慌!国内油价下一轮只是小涨 预计上调0.10元/升

      尽管1月25日该草案刚被抛出时,药明康德立即反应,然而1月26日、29日,药明康德A股还是连续两个交易日跌停。
  • 腾讯微视反击抖音:传掏30亿补贴达人账号

      凭借着汪小菲持续的发疯和卖惨,张兰直播间火了有四个月之久,去年3月份,张兰直播间一周销售额还能维持在1000万-2500万元。
  • 任泽平:货币超发使得贫富差距拉大

      责任编辑:王涵艾尔登法环新模式////////////////关于我们
  • 美股大赛获奖名单 30万各有得主

      中新社记者梁晓辉