在线看免费❗_动漫黄色-艺文笔记

王金豹 2025年11月14日 13:06:37
发布于:曼谷

在线看免费❗_动漫黄色_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

/49 As soon as the system pb is released the E/WD returns and the light on the ECAM Control Panel is extinguished. EIS MENU Reconfiguration 29/49 When you are limited to a single ECAM screen the handling of system malfunctions and how you are advised of failures is slightly different. For clarity we will concentrate on the ECAM screen. If an advisory condition arises, the relevant system page is not automatically displayed. Instead the light on the pb switch for the system and a boxed ADV message on the E/WD will flash. EIS MENU Reconfiguration 30/49 If an ECAM warning or caution is triggered then there will be no automatic display of the relevant system page. System pages should be called by manual selection on the ECAM Control Panel. To see this more clearly let’s look at a failure. We will only discuss the one ECAM screen and the selections on the ECAM Control Panel. EIS MENU Reconfiguration 31/49 You hear a single chime and see the MASTER CAUTION light. Cancel the MASTER CAUTION EIS MENU Reconfiguration 32/49 No, to extinguish the Master Caution light, click on the Master Caution pb. EIS MENU Reconfiguration 33/49 No, to extinguish the Master Caution light, click on the Master Caution pb. EIS MENU Reconfiguration 34/49 TThheeMASTTER CAUTTIION iiss eexxttiinngguuiisshheedd EIS MENU Reconfiguration 35/49 When a failure is detected ECAM will give the normal aural and visual indications. On the E/WD the failure message will be displayed and on the ECAM Control Panel the two CLR keys will be illuminated. F/O ND SCREEN F/O PFD SCREEN EIS MENU Reconfiguration 36/49 By looking at the underlined system title you can see which system page needs to be viewed. In this example the FUEL page pb should be selected and held on the ECAM Control Panel. The system page can be studied to provide more information about the failure and then the pb released. EIS MENU Reconfiguration 37/49 The E/WD returns and the ECAM actions can be carried out. We will do these actions for you. EIS MENU Reconfiguration 38/49 EIS MENU Reconfiguration 39/49 Now that the ECAM actions have been completed there is only the failure title remaining. To confirm what effect the actions have had on the system reselect the FUEL page on the ECAM Control Panel. Call the FUEL page. EIS MENU Reconfiguration 40/49 As before the FUEL page is displayed while the pushbutton is depressed. You can see on the system page that the cross-feed is connected and the pump has shut down. EIS MENU Reconfiguration 41/49 As soon as the pushbutton is released the E/WD returns. EIS MENU Reconfiguration 42/49 To continue with ECAM a CLR key should be pressed to remove the failure message on the E/WD. Clear FUEL EIS MENU Reconfiguration 43/49 Normally the Status page would be displayed but with only a single ECAM screen available the STATUS page must be manually selected. Notice that there is a boxed STS symbol on the E/WD. EIS MENU Reconfiguration 44/49 The STATUS pushbutton should be held down and the STATUS page reviewed. The STATUS page can be displayed for up to 3 minutes before an automatic return to the E/WD occurs. EIS MENU Reconfiguration 45/49 EIS MENU Reconfiguration 46/49 Once the review is complete the pushbutton is released and the E/WD returns. EIS MENU Reconfiguration 47/49 The ECAM procedure is now complete. There are no lights on the ECAM Control Panel. EIS MENU Reconfiguration 48/49 During the approach phase there is no automatic call of the STATUS page when the Flap selector is moved. To remind the pilots to review STATUS the boxed STS symbol on the E/WD pulses. The STATUS page should be selected as before. EIS MENU Reconfiguration 49/49 In this module we have looked at various failures associated with the EIS. You will have the opportunity to practice the various failures during the simulator phase. MMoodduulleeCCoommpplleettee NEXT EIS MENU Reconfiguration 50/49 LLIISSTTOOFFSSUUBBJJEECCTTSS EXIT AUDIO GLOSSARY FCOM RETURN DDMMCC11FFAAUULLTT PPFFDDSSCCRREEEENNFFAAUULLTT UUPPPPEERREECCAAMMSSCCRREEEENNFFAAUULLTT BBOOTTHHEECCAAMMSSCCRREEEENNSSFFAAUULLTT ECAM MENU Abnormal Operation 1/38 ECAM MENU Abnormal Operation 2/38 AIRCRAFT SYSTEM SENSORS   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:空客a320飞机概述2

原标题:
97 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 汪涛:大气污染治理对经济影响几何

      比如2月23日成立的诺安中小盘精选混合,截至3月10日,涨幅达到3.26%,近期净值变化较为明显,显示出相对较快的建仓节奏;2月27日成立的国寿安保高端装备股票发起式也已开始建仓,3月8日,该基金净值上涨了0.44%。
  • 英国大量金融从业人员面临失业

      人工智能(AI)芯片龙头股英伟达收的2%,延续了上周五重挫逾5%的态势。
  • 兴业期货:贸易战缓和新季玉米上市 C1901看跌至1800

      身着古装在雪中行走有种特别的意境,白茫茫的自然景象似乎可以替她们表达情绪,天空中飘着的除了雪花,还有那些说不清道不明的浪漫、期盼、忧愁。。。。。。
  • VR 动作游戏《Swordsman VR》免费更新训练场地图

      新浪家居总经理冀静则从消费者角度,直击行业发展痛点。她指出,大的消费市场环境在迭变,媒体需要洞见家居消费者群体的痛点。当下,主流家居消费群体是伴随互联网成长的一代,因此在消费上也显得特别“精明”。企业便需要给到消费者更好的选择,在夯实硬实力的基础上,强化软实力,走进用户的心,与用户取得情绪共鸣。
  • 荣耀赵明定义AI手机四个层级 绝大多数厂商停留在三四层级

      股东对总议案与具体提案重复投票时,以第一次有效投票为准。如股东先对具体提案投票表决,再对总议案投票表决,则以已投票表决的具体提案的表决意见为准,其他未表决的提案以总议案的表决意见为准;如先对总议案投票表决,再对具体提案投票表决,则以总议案的表决意见为准。
  • 小米集团发行12亿美元优先债券

      当一个人心里开始疏远你,你的冷暖他不关心,你的心事他不碰触,他的时间也不给你。
  • 谷歌:今年在美国办公室和数据中心方面投资100亿美元

      瑞风RF8智聆版涵盖燃油与PHEV插混四款车型,PHEV旗舰型价格为23.99万,PHEV尊贵型价格21.99万;,燃油旗舰型价格18.99万,燃油尊贵型价格16.99万,今年2月1日已经开始交付。相比现在动辄30,40万的新能源MPV,瑞风RF8价格显得很有诚意。
  • 张婧仪宋祖儿算是把物理防晒拿捏了!

      某种程度上,AI让没有专业技能的外行,也能在电商摄影入个门。过去更重视广告数据分析和投放效率的亚马逊,提出了一个有趣的观点:“广告一半是艺术,一半是科学,艺术的部分将变得更加容易。”
  • 赛拉维x中粮:以当代诗意言山水之事

      (1)施工周期无明显变化:施工周期分成两个部分,整装施工工期以80平米为例,合同工期基本在60个工作日至90个工作日;定制化全案整装,以130平米为例,基本在90至120个工作日左右;半包工地,以130平米为例,也多在90工作日至150工作日之间;与二十年前家装公司120平米合同工期的90自然日至120自然日相比,基本属于原地踏步甚至工期还有增加。
  • “老公水开了,帮我倒面粉吧” 瞬间家毁人亡

      2020年,他在欧洲三级阿尔卑斯巡回赛上取胜,那激励了他的自信。上个赛季他在欧洲挑战巡回赛上两次夺冠,在五年之后重新获得欧巡赛参赛卡。
  • 太火了!6

      美国政府近日发布全美电动汽车充电网络新规定,要求所有接受美国联邦政府补贴生产的电动车充电桩,必须在美国本土制造。此前,美国政府还表示,受政府补贴的道路、桥梁等基础设施建设项目,其所需的“油漆、砖头、木材”等一般建筑材料,也要使用“美国货”。