糖心logo官网✅_婷婷伊人五月尤物-艺文笔记

王金豹 2025年11月12日 10:34:54
发布于:曼谷

糖心logo官网✅_婷婷伊人五月尤物_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

B. Aircraft Maintenance Configuration  (1)  Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)  Do the EIS start procedure (ECAM only) (Ref. TASK 31-60-00-860-001).

 4. Procedure _________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,  (Ref. Fig. 501/TASK 28-24-00-991-002)  **ON A/C 301-399,

 (Ref. Fig. 501A/TASK 28-24-00-991-002-A)  **ON A/C ALL

 Subtask 28-24-00-865-063  A. Make sure that this(these) circuit breaker(s) is(are) closed:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/LP VALVE/MOT1/ENG2 2QG A09  49VU FUEL/LP VALVE/MOT1/ENG1 1QG A08 121VU FUEL/LP VALVE/MOT2/ENG2 4QG M26 121VU FUEL/LP VALVE/MOT2/ENG1 3QG M25  1EFF : ALL 1 28-24-00Page 505 1 1 Aug 01/05 1 1 1CES 1 Subtask 28-24-00-710-053

 B. Test of the Valve 12QM valve  -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 2 SUPPLY and  circuit breaker 3QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL pushbutton  - the FUEL system page shows  switch (P/BSW).  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 2 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 3QG.  6. On the panel 49VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 1 SUPPLY and  circuit breaker 1QG.  CONTROL are isolated.  On the ECAM lower DU:  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  7. On the panel 115VU:  On the ECAM lower DU:

 1EFF : ALL 1 28-24-00Page 506 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT ------------------------------------------------------------------------------- - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  8. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  9. On the panel 49VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 1 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 1QG.  Subtask 28-24-00-710-054  C. Test of the Valve 13QM

 -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 2 LP valve MOTOR 2 SUPPLY and  circuit breaker 4QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL P/BSW.  - the FUEL system page shows  - the RIGHT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:

 1EFF : ALL 1 28-24-00Page 507 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUEL 燃油4

原标题:
77 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 美股三大指数集体收涨 英伟达收盘再创新高

      图片:豫能控股近期深股通持股情况,来源:东方财富Choice数据。股市回暖,抄底炒股先开户!智能定投、条件单、个股雷达……送给你海量资讯、精准解读,尽在新浪财经APPVIP课程推荐加载中...收起@@title@@APP专享直播1/10热门推荐收起新浪财经公众号
  • 技术流分析怎么拍照显脸小,专治各种上镜大脸

      琼森工作服公开赛,陈顾新表现出色,获得并列17名。欧巡个人最好名次帮助海南小伙取得1.01395分,世界排名从679位上升到663位。
  • 资金流向房地产挤出了民间固投

      最后,MEGA的报价相较于宣发的120分和产品的80分,我只愿意给40分。
  • 新华社:中国女排迈入第三个黄金时代

      仓廪实而知礼节,衣食足而知荣辱。中国传统文化中蕴含着物质富足与精神富有的辩证统一关系。只有不断发展,才能实现人民对生活安康、社会安宁的梦想。精神财富的丰富,思想文化的自信自强,能够为创造物质财富提供价值引领、注入精神动力。实现中国式现代化,必须不断厚植现代化的物质基础,不断满足人民日益增长的精神文化需求,促进物的全面丰富和人的全面发展。正如习近平主席所指出的:“我们将不断提高人民物质生活和精神生活水平,做到家家仓廪实衣食足,又让人人知礼节明荣辱。”
  • 南向资金连续18日净买入!港股互联网ETF(513770)续涨2%

      继2023年经济意外增长2.5%后,大多数预测人士认为在高利率的钳制下,今年经济增长将减速。
  • 唯品金融进军消金欲分羹 用户数不及阿里难突围

      分析人士称,引发中路股份连续大涨的原因可能与“高空风电”概念有关。据中国电力工程顾问集团公司官方消息,1月7日,由中电工程和中路股份合作建设、中电工程安徽院总承包的“绩溪高空风能发电新技术示范项目”成功发电,成为我国首个可并网的兆瓦级高空风能发电示范项目。
  • 杭州:郁金香花海引客来

      金融强国建设需要拥有高水平的金融人才队伍。金融领域专业性强,知识高度穿透,复杂程度高。美国凭借其发达的高等教育、开放的移民政策和鼓励创新的社会环境,吸纳了大量高质量金融人才,为其金融强国建设提供有力的人才支撑。改革开放以来,伴随着金融业的发展和体制机制改革,我国培育了大批金融人才,2022年我国金融业人员数量接近740万人,较10年前增加了40%以上。尽管金融业人员队伍不可谓不大,但质量有待于进一步提升,结构有待于进一步改善。目前,复合型人才相对稀缺,尤其是金融与科技深度融合的人才缺失;高素质人才供给不足,需求较大;传统的教育体制与市场日新月异的人才需求之间欠匹配,人才管理制度难以有效符合市场化的需求;具有实践经验的国际金融人才较为缺失,难以满足金融外向发展的需求,等等。没有一支高质量的金融人才队伍,就难以为金融强国建设提供充足有效的人力资源保障和支撑。
  • OPEC减产或无法让取信投资者,原油上行动能成为奢侈品

      冬春交替时节,儿童呼吸道传染病患者人数增加。孩子感冒、发烧、连续打喷嚏等症状让家长焦虑。
  • 国信证券前投行骨干被查,曾被证监会终身市场禁入

      下午2时40分,“别动,警察!”随着一声响亮的叫喊,几名便衣在地铁八号线奥林匹克森林公园站站口将一名男子按倒在地实施抓捕。原来,这名男子趁游客不注意将其携带的相机扒窃,却不知他的一举一动早就被反扒侦查员掌握,待其扒窃得手侦查员便将其抓获。
  • 汪涛:预计年底人民币对美元汇率为6.7左右

      居民用水:很多村庄家家都通上自来水
  • 如果人民币外汇期货在境内上市

      新京报讯(首席记者郭铁)现制酸奶品牌“茉酸奶”近日缩杯调价引起消费者关注。对此,茉酸奶3月11日回复新京报记者称,结合市场调研和咨询公司建议,公司升级有机酸奶基底和友好杯型的同时,对价格做了相应调整,以让更多人尝试公司产品。