国产自拍👅_色翁荡息又大又硬又粗又视频图片-艺文笔记

王金豹 2025年11月08日 03:27:15
发布于:曼谷

国产自拍👅_色翁荡息又大又硬又粗又视频图片_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

B. Aircraft Maintenance Configuration  (1)  Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)  Do the EIS start procedure (ECAM only) (Ref. TASK 31-60-00-860-001).

 4. Procedure _________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,  (Ref. Fig. 501/TASK 28-24-00-991-002)  **ON A/C 301-399,

 (Ref. Fig. 501A/TASK 28-24-00-991-002-A)  **ON A/C ALL

 Subtask 28-24-00-865-063  A. Make sure that this(these) circuit breaker(s) is(are) closed:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/LP VALVE/MOT1/ENG2 2QG A09  49VU FUEL/LP VALVE/MOT1/ENG1 1QG A08 121VU FUEL/LP VALVE/MOT2/ENG2 4QG M26 121VU FUEL/LP VALVE/MOT2/ENG1 3QG M25  1EFF : ALL 1 28-24-00Page 505 1 1 Aug 01/05 1 1 1CES 1 Subtask 28-24-00-710-053

 B. Test of the Valve 12QM valve  -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 2 SUPPLY and  circuit breaker 3QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL pushbutton  - the FUEL system page shows  switch (P/BSW).  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 2 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 3QG.  6. On the panel 49VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 1 SUPPLY and  circuit breaker 1QG.  CONTROL are isolated.  On the ECAM lower DU:  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  7. On the panel 115VU:  On the ECAM lower DU:

 1EFF : ALL 1 28-24-00Page 506 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT ------------------------------------------------------------------------------- - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  8. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  9. On the panel 49VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 1 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 1QG.  Subtask 28-24-00-710-054  C. Test of the Valve 13QM

 -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 2 LP valve MOTOR 2 SUPPLY and  circuit breaker 4QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL P/BSW.  - the FUEL system page shows  - the RIGHT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:

 1EFF : ALL 1 28-24-00Page 507 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUEL 燃油4

原标题:
32 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 中信期货:做多JD1901交易策略分析

      入列本次《2023大家居建装行业百大新品》门窗展区的新品有:皇派门窗-冠军时代双内开窗、派雅门窗-MS级山湖海尊享版、新豪轩门窗-IDEA75侧压密封推拉窗、轩尼斯门窗-天幕系列、米兰之窗-索尔马尼82铝合金金钢纱网一体窗、欧哲门窗-天幕智能全景窗、贝克洛门窗-RSD125P全景门、墨瑟门窗-克劳迪亚IV78铝包木欧标窗、良木道门窗DSW220i智能提升窗、易欧思系统门窗-EL86隐扇窗、亿合门窗-摩登时代Pro系列断桥平开窗、博仕门窗-M8C测压推拉窗、罗兰西尼系统门窗-R7C厨房系统外开窗、富轩全屋门窗-富那斯S65智能提升窗、百利玛门窗-百利玛极界系统全景推拉门、阿尔卑斯系统门窗-圣加仑高性能中窄双内开窗、沃伦门窗-星空系列——75窄边平齐内开窗、怡发门窗-梦想家外开窗、瓦瑟系统门窗-WAZ25SPV电动全景推拉门、德技优品门窗-星光S9系统断桥平开窗、安格尔门窗-境致高密封侧压窗、E格静音系统门窗-静音105内开窗纱一体窗、歌尔西亚门窗系统-GWS73系列隐框平推窗、王力高端智能锁-S915、美心门-XV装甲入户门(单面套)、梵蒂斯装甲入户门-煌鹿、德盾装甲门-M级/玻璃铸铝系统装甲门-奥格、典固铜门-守护神、奢曼装甲门-暗香、皇士金盾-光影梦徜。
  • 太平鸟止住了亏损,但难再续写增长神话

      国王掉入附加赛区,萨博尼斯11中10空砍25分15篮板8助攻3抢断2盖帽9失误,蒙克20分4篮板5助攻,福克斯18分9篮板,穆雷13分6篮板。
  • 把硬币投入池子如法吗

      成本已经成为困扰大模型发展的关键要素。OpenAI训练一次就要花费数百万美元,英伟达的GPU芯片已经一片难求,大公司不得不花费数十亿美元来建设庞大的算力中心。
  • 辽宁主攻石冰彤登陆土超 已参与萨勒耶尔女排训练

      本场比赛,库里继续缺阵。首节比赛,马刺占据上风,领先勇士8分结束第一节。第二节,勇士一波高潮追平比分,双方陷入僵持。半场结束时,马刺领先勇士2分。第三节,马刺一波高潮将分差再度拉大到两位数,勇士之后回击一波30-6的高潮完成反超并领先两位数。末节,勇士牢牢掌控10分左右的领先。最终,勇士112-102力克马刺。
  • 重磅!「2022设计师严选品牌 TOP10」活动启动

      前舱四个一组的环型拉手在空间上环环相扣,象征着中国文化中同心协力的价值观;前后舱六个环型拉手之间穿插、层叠、回环、连接,其形态来源于中国结又不同于中国结,是对中国结元素的创新再现。
  • 扒王子文变脸的帖子太多了,这篇才是最全的!

      消息公布之后,一石激起千层浪,想要入场淘金的人已经跃跃欲试,特别是对缺少投资渠道的县城土豪而言,加盟海底捞似乎就等于为自己购买了“理财”。不过,也有人提出质疑:消费者看中的是海底捞的服务,加盟后服务品质会不会缩水?
  • 张志磊卫冕战被一致看好 赞助金额估值超600万

      官方微信:《剑侠世界3》[jxsj3wx]
  • 站上7.2万美元、跻身全球市值第八大资产!谁在助推比特币的“疯狂”

      或扫码关注“国际学校家长圈”公众号后台咨询
  • 餐饮企业“加盟潮”为何卷土重来

      在赵明看来,目前绝大多数厂商的发力都是在第三层和第四层,包括手机上的部分AI应用,以及把网络的部分AI应用在手机上进行呈现,或者提供一部分算力,甚至只是为了营销需要喊口号,所谓的AllinAI仍然是一个浅层的进入。只有在第一层和第二层,才是面向未来的构建AI的长远的消费者的体验。
  • “反华五人帮”曝光

      2022年8月,“欠债4000万案终审败诉”消息出来一个月后,李亚鹏入局直播带货售卖茶叶,还推出了自家品牌“书院造”。面对欠债及投资争议,李亚鹏曾在直播间称自己面临的困难远远不止四千万,还曾表示“我人生最大的错误就是我的情怀远远大于我的能力。”
  • 华为发布ICT学院2.0计划 未来5年培养200万ICT人才

      充值188元成为“代理”获“资源库”