糖心logo官网✅_拔萝卜光-艺文笔记

王金豹 2025年11月10日 13:46:00
发布于:曼谷

糖心logo官网✅_拔萝卜光_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 HIGHLIGHTS __________  REVISION NO. 30 Aug 01/05

Pages which have been revised are outlined below, together with the Highlights of the Revision CH/SE/SU C REASON FOR CHANGE EFFECTIVITY PAGES CHAPTER 05 L.E.P.  1- 1 REVISED TO REFLECT THIS REVISION INDICATING NEW,REVISED, AND/OR DELETED PAGES

T.  OF C.  REVISED TO REFLECT THIS REVISION 1

05-50-00  CORRECTION/ADDITION/AMPLIFICATION ALL 201, 204, ADDED NOTES INSIDE ROLL,PITCH AND YAW BOXES 215, 222-TITLE OF TASK(S) DATA UPDATED ALL 223  CES

 CHAPTER 05 __________  TIME LIMITS/MAINTENANCE CHECKS  LIST OF EFFECTIVE PAGES _______________________ N, R or D indicates pages which are New, Revised or Deleted respectively Remove and insert the affected pages and complete the Record of Revisions and the Record of Temporary Revisions as necessary CH/SE/SU  C  PAGE  DATE  RECORD  OF TEMP.  REVISION  L.E.P.  R 1- 1 Aug01/05  T. of C.  R  1 Aug01/05  05-OBSV  101 Feb01/03  05-OBSV  102 Feb01/03  05-OBSV  103 Feb01/03  05-50-00  R  201 Aug01/05  05-50-00  202 May01/03  05-50-00  203 May01/03  05-50-00  R  204 Aug01/05  05-50-00  205 May01/03  05-50-00  206 May01/04  05-50-00  207 May01/03  05-50-00  208 May01/03  05-50-00  209 May01/03  05-50-00  210 May01/04  05-50-00  211 May01/03  05-50-00  212 May01/03  05-50-00  213 Feb01/98  05-50-00  214 Feb01/98  05-50-00  R  215 Aug01/05  05-50-00  216 Feb01/98  05-50-00  217 Feb01/98  05-50-00  218 Feb01/98  05-50-00  219 Feb01/98  05-50-00  220 Feb01/98  05-50-00  221 Feb01/98  05-50-00  R  222 Aug01/05  05-50-00  R  223 Aug01/05  05-50-00  224 Nov01/02  05-50-00  225 Feb01/98  05-50-00  226 Feb01/98  05-50-00  227 Feb01/98  05-50-00  228 Feb01/98  05-50-00  229 Feb01/98  05-50-00  230 Feb01/98  05-50-00  231 Feb01/98

CH/SE/SU  C  PAGE  DATE  CH/SE/SU  C  PAGE  DATE  05-50-00 05-50-00 05-50-00 05-50-00 05-50-00 05-50-00 05-50-00  232 May01/00 233 Nov01/00 234 May01/01235 May01/01 236 May01/01 237 May01/01238 Feb01/03 

 CHAPTER 05 __________  TIME LIMITS/MAINTENANCE CHECKS  TABLE OF CONTENTS

_________________  SUBJECT CH/SE/SU_______ ________  C_  FAULT SYMPTOMS 05-OBSV  UNSCHEDULED MAINTENANCE CHECKS 05-50-00______________________________  FAULT ISOLATION PROCEDURES  Identification of the Cause of  In-Flight Airframe Vibrations  and/or Noises  Hard/Overweight Landing  Bird or Hail Strike  Tire Burst or Tread Throw  Lightning Strike  Engine Bird Strike or Slush  Ingestion  Tail Runway Impact  NLG Towing Overload or overrun  NlG Steering Angle Exceedance  Runway or Taxiway Leaving  Flight Through Dust Storm/Volcanic  Ash or Severe Conditions on Ground  Engine Side Loads  Fluid Spillage in Cargo  Compartment  Abnormal Pax/Crew Door Movement  Significant MLG Vibration at  Touch-Down  landing Gear extension at more  than the Geardown Limiting speed  Flap/Slat Extension at more than  the Flap/Slat Limiting Speed  In Flight Excessive Load factor  due to Turbulence or Maneuver or  in Excess of VMO/MMO  Engine Failure  Overweight Taxiing  Very High Winds on Ground  Leaks - Permitted Values  Lateral Jerk at Take-off  Bad Icing Condition - Flight in  Bad Icing Condition

101 201 201 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 238 ALL

ALLALLALLALLALL ALLALLALLALLALL ALLALL ALLALL ALL ALL ALL ALLALLALLALLALLALL  05-CONTENTS Page 1 Aug 01/05 R CES   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 时间限制/维护检查

原标题:
14 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐