深夜福利✅_日韩一卡 二卡 三卡 四卡 使用方法-艺文笔记

王金豹 2025年11月14日 09:52:07
发布于:曼谷

深夜福利✅_日韩一卡 二卡 三卡 四卡 使用方法_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

3. Elevator Control System Adjustments If you cannot get the correct range of movement of the elevator control system, use this procedure to adjust the system. Gust travel refers to the amount of travel remaining at the control surface with the control stick held against the cockpit stop. WARNING: IF YOU DO AN ADJUSTMENT OF A PUSH-ROD, YOU MUST MAKE SURE THAT THE PUSH-ROD IS STILL IN SAFETY. IF YOU DO NOT DO THIS, THE PUSH-ROD CAN DISCONNECT. THIS CAN CAUSE DEATH OR INJURY TO A. Equipment PERSONNEL. Item Quantity Part Number Ruler or deflection gauge. 1 Commercial. Rigging pins. 3 - B. Elevator Control Adjustment Procedure Refer to Figure 1. Detail Steps/Work Items Key Items/References (1) Remove these items for access: S The pilots' seats. S The rudder. Refer to Sections: 25-10. 55-40. (2) Install rigging pins in the following: S Through the stick mounting block and the torque tube. S The idler lever. S The rear bellcrank. On the control bulkhead. On the front main bulkhead. On the vertical stabilizer rear web. (3) If you cannot put a rigging pin into a lever or bellcrank, adjust the push-rods as necessary. Refer to Section 27-00 for the push-rod adjustment procedure. (4) Make sure that the elevator aligns with the horizontal stabilizer. At the stabilizer tips. AIRCRAFT Flight Controls DA 40 Series AMM Detail Steps/Work Items Key Items/References Page 204 20 Sep 2007 27-30-00 Doc # 6.02.01 Rev. 5 (5) If the elevator does not align with the horizontal stabilizer, adjust the vertical push-rod at the rear bellcrank. Refer to Section 27-00 for the push-rod adjustment procedure. (6) Remove rigging pins from the following: S The stick mounting block. S The idler lever. S The rear bellcrank. On the control bulkhead. On the front main bulkhead. On the vertical stabilizer rear web. (7) Do a test for the correct range of elevator movement. Refer to Paragraph 2. (8) Do an inspection of all the controls that you have adjusted. S If necessary for your airworthiness authority, do a second inspection of the controls. (9) Install these items: S The pilots' seats. S The rudder. Refer to Sections: 25-10. 55-40. AIRCRAFT DA 40 Series AMM Flight Controls Doc # 6.02.01 Rev. 5 27-30-00 Page 205 20 Sep 2007 4. Elevator Push-Rod Access Elevator Push-Rod Remove/Install Access References Between the control torque tube and the idler lever at the front main bulkhead. Pilots’ seats. Refer to Section 25-10. Between the idler lever at the front main bulkhead and the bellcrank at the vertical stabilizer rear web. Pilots’ seats. Rudder. Refer to Section 25-10. Refer to Section 55-40. Between the bellcrank at the vertical stabilizer rear web and the elevator. Rudder. Refer to Section 55-40. 5. Elevator Bellcrank and Lever Access Elevator Bellcrank/Lever Remove/Install Access References Idler lever at the front main bulkhead. Pilots’ seats. Refer to Section 25-10. Bellcrank at the vertical stabilizer rear web. Rudder. Refer to Section 27-20. AIRCRAFT Flight Controls DA 40 Series AMM Page 206 20 Sep 2007 27-30-00 Doc # 6.02.01 Rev. 5 Intentionally left blank AIRCRAFT DA 40 Series AMM Flight Controls Doc # 6.02.01 Rev. 5 27-38-00 Page 1 20 Sep 2007 Section 27-38 Flight Controls - Elevator Trim 1. General The DA 40 has an elevator with a trim tab. The trim tab is mechanically operated. This lets you trim the airplane for different speeds and center-of-gravity positions. A handwheel on the center console controls the elevator trim. An indicator tells the pilot the trim setting. A flexible cable moves the trim tab. AIRCRAFT Flight Controls DA 40 Series AMM Page 2 20 Sep 2007 27-38-00 Doc # 6.02.01 Rev. 5 Figure 1: Elevator Trim Mechanism in the Cockpit AIRCRAFT DA 40 Series AMM Flight Controls Doc # 6.02.01 Rev. 5 27-38-00 Page 3 20 Sep 2007 2. Description The trim installation has 3 main parts: ) A handwheel assembly with a trim indicator. ) A flexible cable which connects the handwheel to the trim tab. ) The trim tab actuator assembly. Figure 1 shows the elevator trim mechanism in the cockpit. Figure 2 shows the trim tab actuator assembly. A. Trim Handwheel Assembly A handwheel assembly on the center console controls the elevator trim system. The assembly has a   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:钻石40系列AMM 2

原标题:
69 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 《舞侠Online》官网上线!

      (8)家装施工交付升级,施工新工具、新材料、新工艺的持续开发和普及运用是关键,包括施工人员新型职业化(产业工人)建设而言,新工具、新材料、新工艺的带动价值同样毋庸置疑。
  • 王永利:比特币期货交易的推出会推动其价格大涨吗?

      据北京商报记者梳理发现,开年以来,险资机构密集调研A股上市公司,不只此前大热的科创领域,也涉及了通信、银行等多个板块。屈放表示,从目前的险资调研情况分析,不仅包括高市值、高安全垫在内的核心资产,也开始关注科技创新、新质生产力为主的科创型企业。
  • 纽约黄金期货价格周一走高

      对于熟悉“小快灵”式地面传控打法的国安来说,三后卫的打法一直难以适应,克罗地亚人比利奇以及土帅谢峰就有前车之鉴。
  • 美元走势前景遭泼冷水,黄金欲借FED官员的“乌鸦嘴”翻身

      本公司及董事会全体成员保证信息披露的内容真实、准确、完整,没有虚假记载、误导性陈述或重大遗漏。
  • iShares白银ETF11月12日白银持有量与上一交易日减少29.21吨

      他们分别是:飞利浦智能锁DDL708-FVP-7HW人脸可视智能锁、3D人脸识别智能锁-好太太童瑶同款智能锁V86Max、萤石极光人脸视频锁Y3000FVX双摄版、狄耐克智能彩屏面板magic、欧瑞博苍穹系列智能照明、摩根全屋智能——卢志荣·缀璧系列、小度全屋智能——小度光影屏、易来的易来青空®灯、云米全域风空调SPACEPRO、立林智慧屏--魔派2系列。
  • 熊市的反弹会一波比一波弱

      “我们要通过具体的实践活动、真实的实验情境,让孩子们感受科学的魅力,提高科学素养。”参观学习后,深圳市教育科学研究院实验学校(光明)科学教师兰天也说。
  • 年轻人争相买金,也别忘了“投资有风险”这句老话

      所以说宗馥莉接班娃哈哈,也是必然又唯一的选择。
  • 国服稳了?网易大神惊现《魔兽世界》预约页面

      如果品牌认知产生动摇,或者压根没有进入用户视线,是不会排在“决策候选区里面”的。在资格赛阶段就面临出局风险,是无法谈及决赛的胜负。
  • 邦达亚洲:美元与美股联袂下滑 黄金收复1210

      与此同时,江淮乘用车与其他传统品牌相比,还存在“偏科”状况。
  • 伍戈:市场预测错了什么?

      2019年蔚来汽车病入膏肓,来自合肥政府的70亿元股权投资把蔚来“从ICU拉了回来”。这一案例让合肥迅速破圈,被称为“中国最敢赌的城市”、“中国最牛风险投资机构”。
  • 四川纳溪区:早茶飘香

      路易威登与LaFabriquedesArts工坊的几位珐琅大师倾力合作,耗费数月悉心研究,最终才呈现迷人的蓝色渐变效果珐琅。它的蓝色,为精细研磨的金属氧化物粉末加上特殊油料反复调配反复尝试,才被定为珐琅颜料。为了给微型彩色玻璃艺术品注入生命力,珐琅大师采用最传统的毛细作用填充技术,用画笔为每个部分悉心上色,总共需要制作五到六层半透明珐琅并放入窑炉内进行相同次数的烧制,才能达到这种令人惊叹的透明效果,因此每个表盘耗时近100小时。
  • 食人肉的寄生虫正在美国蔓延,气候变化可能加剧这个噩梦

      按理来说,苹果汽车是一个标准的含着金汤匙出身的富二代。
  • 期指多头信心不足 指数重心回落仍是主基调

      未成年人手机上网已成为近年来的热点话题。团中央维护青少年权益部、中国互联网络信息中心(CNNIC)发布的《第5次全国未成年人互联网使用情况调查报告》显示,2022年未成年网民规模已突破1.93亿,使用手机上网的未成年网民比例一直保持在90%左右。
  • “豁出去”的梁建章能否再救携程

      从销量来看,2023年,北汽蓝谷的销量确实得到了极大的改善,北汽蓝谷子公司北京新能源汽车股份有限公司12月汽车销量为20,815辆,同比增长111.04%;2023年累计销量为92,172辆,同比增长83.69%。
  • VR 游戏开发商 Thirdverse 完成 800 万美元融资

      截至2023年末,未经审计资产总额28,026.69元,负债总额29,165.25万元,净资产-1,138.56万元,2023年实现营业收入35,554.15万元,利润总额3,020.31万元,净利润3,020.31万元。