国产自拍👅_超级H荡的辣文小说-艺文笔记

王金豹 2025年11月11日 22:13:13
发布于:曼谷

国产自拍👅_超级H荡的辣文小说_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 5. Close-up ________ Subtask 49-11-00-410-051  A. Close Access  (1)  Make sure that the work area is clean and clear of tool(s) and other items.

 (2)  Set the LIGHT control switch 11LJ to the off position.

 (3)  Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).

 (4)  Close the APU exhaust access fairing 317.

 (5)  Remove the access platform(s). Subtask 49-11-00-865-051

 B.  Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1WG, 2WG, 1WF, 2WF.

 Subtask 49-11-00-860-058  C. Aircraft Maintenance Configuration  (1)  Pressurize the reservoirs of the hydraulic systems.  (Ref. TASK 29-14-00-614-002).

 (2)  Put a warning notice in the cockpit to tell persons that the APU is not installed.

 NOTE : The circuit breakers 1KD, 2KD, 1QC, 2QC, 3QC, 1QF and 2QF must ____ be opened and tagged and must remain so until the APU is reinstalled.  (3)  Make an entry in the aircraft technical log book.

 (4)  De-energize the ground service network  (Ref. TASK 24-42-00-862-001).

 TASK 49-11-00-000-001  Removal of the APU Substitution Kit (GTCP 36-300)  1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION  ------------------------------------------------------------------------------- No specific circuit breaker(s) safety clip(s)  No specific protective cover  No specific thread protector  No specific access platform 3.5 m (11 ft. 6 in.)

 B. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 49-11-11-400-001 Installation of the Auxiliary Power Unit (APU) - 4005KM (GTCP 36-300) 52-41-00-010-001 Open the APU Doors for Access 52-41-00-410-001 Close the APU Doors after Access 49-11-00-991-001 Fig. 801 49-11-00-991-002 Fig. 802

 3. Job Set-up __________ Subtask 49-11-00-860-054  A. Aircraft Maintenance Configuration  (1)  Energize the ground service network  (Ref. TASK 24-42-00-861-001).

 (2)  On the panel 25VU make sure that the APU MASTER SW p/bsw is OFF.

 (3)  Make sure that hydraulic systems are depressurized  (Ref. TASK 29-00-00-864-001).

 Subtask 49-11-00-865-052  B. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/FIRE AND OVHT/DET/LOOP B 2WG L44 121VU APU/FIRE AND OVHT/DET/LOOP A 1WG L43 121VU APU/FIRE/EXTIG/SQUIB/B 2WF L39 121VU APU/FIRE/EXTIG/SQUIB/A 1WF L38  Subtask 49-11-00-010-052  C. Get Access  (1)  Put the access platform in position below the APU access doors 315AL and 316AR.

 (2)  Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).

 (3)  Open the APU exhaust access fairing 317.

 (4)  Set the LIGHT switch to the ON position.

 4. Procedure _________  (Ref. Fig. 801/TASK 49-11-00-991-001, 802/TASK 49-11-00-991-002) Subtask 49-11-00-020-050  A. Removal of the APU Subtitution Kit  (1)  Remove the oil-cooler outlet-duct plug (31) on the door 315AL.

 (2)  Remove the bleed-air duct plug (35) from the bleed air duct (24).

 (3)  Install the protective cover to the bleed air duct (24).

 (4)  Remove the blanking plug (27) from the exhaust muffler drain (30).

 (5)  Remove the exhaust muffler plug (32) from the APU exhaust outlet (33).

 (6)  Support the rear suspension assembly (18) and remove the nut (17) the washer (16) and the bolt (14).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER2

原标题:
2 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 女排巴西杯海滩创造队史 3

      MareksGaļinskis|YEKINDAR已经有一段时间没有打出外界预期的水准了,他还在按照过去的风格比赛,但他的个人能力远逊以往。而KeithMarkovic|NAF也不是那种为了进步能不惜一切的选手,虽然他是很优秀。
  • 11月19日 COMEX 12月期金未平仓合约减少11520手

      强大的金融机构是金融强国实际功能的主要构成部分。金融强国通常拥有规模和质量处于全球前列的商业银行、投资银行、保险公司和信托公司的金融机构体系。第二次世界大战以来,美国的商业银行和投资银行长期处在全球的前列,日本的商业银行一度赶上后又掉队。直到今天,美欧日的金融机构依然处在全球重要地位,尤其是美国的金融机构总体上仍处在强势状态。经过加入世界贸易组织后大刀阔斧的改革,中国的银行业迅速崛起,截至2022年末,资产规模合计约45.9万亿美元,为美国银行业的1.95倍。但就总资产而言,中国金融体系大致相当于美国的70%左右。中国的银行业虽大,但在全球的影响力相对有限,因其业务国际化程度偏低,产品和服务的国际竞争力较弱。相比美国十分发达的资本市场和证券业,我国的证券业和投资银行发展相对滞后。据统计,美国拥有世界上规模最大的资本市场,股市总市值超过46万亿美元,占全球股市总市值的42.5%。而中国股市总市值仅占10.6%,为美国的1/4左右,且发展步线较慢。保险业和信托业发展状况与国际先进水平相比亦有不小的差距。可见,中国的金融机构除银行业外,既不大,也不强,离金融强国所需要的强大金融机构体系要求尚有不小的差距。未来,需按照市场化、法治化、国际化原则,健全具有高度适应性、竞争力、普惠型的现代金融机构体系。
  • 港珠澳大桥今日正式运营:打破海上桥梁工程极限

      首先要请出泰坦尼克号,它除了在影视上留下了浓墨重彩的一笔,还成了巨物对比中的常用标准单位。
  • 乘联会:2月乘用车市场零售109.5万辆

      一定还隐藏着更大的玄机
  • 期货上市公司首份年报出炉 行业同质化竞争加剧

      选择比努力重要。选择比努力重要。选择比努力重要。
  • 降息对银行业不完全是利空

      注册地址:广州市增城区中新镇坑贝村城高路一巷6-1号
  • 中国经济学家圈多样性璀璨发展 盘点令人尊敬的女性经济学家

      互联网巨头正在抢夺王慧文支持的“AI创业明星”袁进辉,以及他创立的硅基流动(SiliconFlow)。
  • 春节黄金周澳门入境旅客人次同比增25%

      调研组严格按照抽样调研的原则,选择代表性的家装企业进行深入考察,并与企业负责人、项目经理、施工人员等进行充分的交流。调研组还重点了解了企业的质量管理体系,包括工艺标准、材料选用、施工流程等方面的具体表现。
  • FED看衰全球增长前景挽救黄金,美元何以仍不乏后台背书?

      联合国人权理事会叙利亚问题独立国际调查委员会成立于2011年8月22日,其任务是调查自2011年3月叙利亚冲突爆发以来所有涉嫌违反国际人权法的行为,目前该委员会委任期延长至2024年3月31日。
  • 标普指数下跌,或意味贵金属市场迎来春天

      为探究家居产业创新与发展路径,聚势家居产业高质量发展新动能,8月2日,题为“大雁归来”的「2023中国家居产业发展峰会发布会」于北京盛大开幕,同时还宣告了持续十年之久的家居年度“奥斯卡”——“2023大雁奖”评选活动也正式拉开帷幕。
  • 曾打造国产第一电动超跑,创始人却沦为“老赖”,现在或将赴美IPO

      2008年,相信许多人仍然记忆犹新。那一年,从美国爆发的次贷危机席卷全球,无数企业在旦夕之间破产;那一年,中国汶川发生8.0级强烈地震,无数生命在顷刻之间凋零。
  • 新浪彩票双色球名家第24027期推荐汇总

      Astralis:“谢谢你,Xyp9x
  • 制农田“营养餐”、开展无人机作业……各地春耕春管“科技范”满满

      说起中国MPV市场发展史,瑞风是其中浓墨重彩的一笔。20年前,那时|询价)牢牢占据公务MPV市场份额,奥德赛在高端家用MPV市场握有相当的话语权,那时的合资品牌MPV价格都很高,就是在这种时代背景下,瑞风提出想为老百姓和中小企业主提供实用,价格亲民的MPV产品。于是2002年,第一辆瑞风MPV下线,凭借着这种初心,瑞风用了不到两年时间,从初出茅庐一跃成为三甲。