国内精品♨️_大香蕉在线观看75🥡-艺文笔记

王金豹 2025年11月10日 01:31:45
发布于:曼谷

国内精品♨️_大香蕉在线观看75🥡_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

H. Put the Airplane Back to Its Usual Condition SUBTASK 27-11-41-410-001 (1) Close this access panel: Number Name/Location 112A Forward Access Door SUBTASK 27-11-41-860-003 (2) Do this task: Put the Aileron Hydraulic Systems A and B Back to the Condition Before Pressure Removal, TASK 27-11-00-860-802. ------------------------- END OF TASK --------------------------- 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-11-41 Page 410 Feb 10/2007 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details AILERON CONTROL WHEEL DRUM - REMOVAL/INSTALLATION 1. General A. This procedure has these tasks: (1) A removal of the aileron control wheel drum (2) An installation of the aileron control wheel drum. B. The aileron control wheel drum is referred to as the "control wheel drum" in this procedure. C. The control wheel drum is installed at the base of the captain’s control column. TASK 27-11-51-000-801 2. Aileron Control Wheel Drum Removal (Figure 401) A. References Reference Title 27-11-00-860-801 Remove Pressure from the Aileron Hydraulic Systems A and B (P/B 201) B. Tools/Equipment NOTE: When more than one tool part number is listed under the same "Reference" number, the tools shown are alternates to each other within the same airplane series. Tool part numbers that are replaced or non-procurable are preceded by "Opt:", which stands for Optional. Reference Description SPL-1585 Kit - Rigging Pins, All Systems (Part #: F70207-109, Supplier: 81205, A/P Effectivity: 737-600, -700, -700C, -700ER, -700QC, -800, -900, -900ER, -BBJ) C. Location Zones Zone Area 112 Area Forward of Nose Landing Gear Wheel Well 133 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Left 134 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Right 211 Flight Compartment - Left 212 Flight Compartment - Right D. Access Panels Number Name/Location 112A Forward Access Door E. Prepare for the Removal SUBTASK 27-11-51-010-001 (1) Open this access panel: Number Name/Location 112A Forward Access Door 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-11-51 Page 401 Oct 10/2006 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details SUBTASK 27-11-51-860-001 WARNING: MAKE SURE THE DOWNLOCK PINS ARE INSTALLED ON ALL THE LANDING GEARS. WITHOUT THE DOWNLOCK PINS, THE LANDING GEARS COULD RETRACT AND CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT. (2) Do this task: Remove Pressure from the Aileron Hydraulic Systems A and B, TASK 27-11-00-860-801. SUBTASK 27-11-51-860-002 (3) Put the captain’s and first officer’s control wheels in the neutral position. SUBTASK 27-11-51-480-001 (4) Install the rig pins A/S-1 and A/S-1A, from the rig pin kit, SPL-1585, in the aileron transfer mechanism. (a) Make sure that the rig pin A/S-1 is fully in the aileron transfer mechanism. (b) Hold the rig pin A/S-1 to make sure it does not fall out. SUBTASK 27-11-51-480-002 (5) Install the rig pin A/S-15, from the rig pin kit, SPL-1585, in the aileron trim mechanism. F. Aileron Control Wheel Drum Removal SUBTASK 27-11-51-020-001 (1) Disconnect the cable ACBA [1] and cable ACBB [2] at the turnbuckles [3]. (a) Attach identification tags on the disconnected cables for easier assembly. SUBTASK 27-11-51-020-002 (2) Disconnect the cable AA [4] and cable AB [6] at the turnbuckles [5]. (a) Attach identification tags on the disconnected cables for easier assembly. SUBTASK 27-11-51-020-003 (3) Remove the cable guide [16] from the control wheel drum assembly [19]. (a) Remove the screws [17] from the cable guide [16]. (b) Remove the cable guide [16]. SUBTASK 27-11-51-020-004 (4) Remove the control wheel drum assembly [19]: (a) Remove the screw [35] and clamp [37] that attach the rudder pedal adjustment crank to the control wheel drum assembly [19]. (b) Remove the screws [24], [27], [39] and clamps [26], [29] and [41]. (c) Disconnect the electrical connectors [15] and [30] from the roll force transducer [18]. (d) Remove the screws [31], washers [32] and nuts [34] to remove the wiring harness [38] from bracket on the control wheel drum assembly [19]. (e) Disconnect the electrical connector [33] from the aileron transmitter. (f) Remove the nuts [14], washers [13], and bolts [12] that attach the control wheel drum assembly [19] to the airplane structure.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL飞机维护手册2

原标题:
2 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 环球时报社评:台积电变“美积电”,警钟已经敲响

      增强脸部立体感,以眼睛下方的三角区为中心,最低限度遮住瑕疵即可!
  • 央行金融稳定工作会议:大型银行评级一直优良,少数问题中小金融机构改革化险取得重要进展

      近日,东部战区海军航空兵某机场战机列阵、引擎轰鸣。“起飞!”随着指挥员一声令下,多型战机接续升空,一场多课目、多批次跨昼夜飞行训练拉开帷幕。(来源:东部战区)
  • 两会引领投资风向标 新质生产力成基金布局重点

      此外,宗庆后还在现场宣布,2024年会进一步加大对优秀经销商的激励,计划拿出1个亿奖励优秀经销商。
  • 太平鸟2022年净利润下降超7成,成跌最惨上市服装公司之一

      “质量信号没有达到效果,还要看数量信号,也就是用户的留存情况。”这也与产品的实用性相关,GPT能够在全球席卷上亿用户,除了出类拔萃的能力外,优质的交互体验,不断推出的多模态生成产品,都是关键因素。
  • 张志磊2次击倒帕克却输拳 体能体重劣势被放大

      比如2024年年初,在苹果汽车被曝出项目被砍之前,曾有新闻提到库克计划将苹果L5级别的自动驾驶降低到L2。
  • 合力万盛与泰国Thai Fight公司开启全面战略合作

      对于如今越剧重新掀起热潮,陈丽君李云霄成为新顶流,何赛飞乐见其成,“中国戏曲要传承就要年轻化,老中青几代都得有演员,这两个年轻人大家都那么喜欢,我也挺了解她们的,这次能跟她们一起唱,我觉得这也是我传承戏曲普及戏曲的工作之一,节目把我和茅威涛放在一起,这也顺理成章,我以前演戏的时候就跟茅威涛有很多搭档。”
  • 男女必读:不同年龄谈恋爱心理有什么区别?

      汽车零部件板块表现活跃,多股盘中直线拉涨,涨幅超14%,、、等多股涨停。
  • 李光耀如何带领新加坡创造奇迹?

      一线城市,存量房市场是绝对的主流,新交付盘、尤其是新交付毛胚房楼盘已经是屈指可数,但这类楼盘,依然是家装企业最美的那一口香饽饽。
  • 放大双眼 叠涂眼影打造立体感眼妆

      首先,3月9日,华润置地亦庄新城0503街区B19R1地块揭晓案名为“北京润府”,销售指导价为6.5万/平方米。该项目位于地铁17号线北神树站旁,占地面积达69914.097平方米,总建筑面积高达.05平方米,2.5的容积率+60米的控高,规划有19栋8至18层的住宅楼。乐居君假设以90㎡-140㎡的首置首改面积段来计算,预计项目可提供约1300套住宅。
  • 原生家庭的“烂牌”,如何才能不传递给孩子?

      动力方面,五菱缤果PLUS特别搭载了高效能三合一水冷扁线电机,集成度高、体积小,让车辆获得了更大的乘坐空间。其电机最高效率可达97.5%,且效率85%以上的区间占比大于85%,即使在高速、电机过热等场景下,电机也能迅速散热,维持适宜的工作温度,保证充足动力。
  • 每天早上空腹吃1个苹果,孩子身体竟会发生这些变化

      主营业务惨淡经营的同时,公司在期内对部分业务进行了调整和剥离,产生已终止业务全面亏损1.40亿元,导致全年亏损进一步加深。
  • 房山巨燕燕京府解读 主推75~126㎡ 售价待定

      经典漆事业部市场总监曹毅对此表示,市场的变动唯有适者才能生存。目前涂料市场要聚焦三大核心竞争力,产品的核心竞争力,产品有质量有亮点;人才的核心竞争力,要培养能够独当一面的优秀人才;渠道的核心竞争力,规划、策略、推广手段的提升,细分领域的着重发力。现阶段,压力与动力并存、机遇与机会共存。马儿不仅要跑得快还要跑得稳。
  • 没妈的孩子像根草? 把孩子送回老家带,你会后悔吗……

      与AIOT结合:解决资产数字化和价值流转问题
  • 23个月大的宝宝不愿意喝奶粉怎么办?

      中国式现代化体现科学社会主义的先进本质,展现了不同于西方现代化模式的新图景。西方国家在现代化进程中无法遏制资本贪婪的本性,无法解决物质主义膨胀、精神贫乏等痼疾。中国式现代化致力于物质文明和精神文明相互协调、相互促进,让全体人民始终拥有团结奋斗的思想基础、开拓进取的主动精神、健康向上的价值追求,为全面建设社会主义现代化国家提供了源源不断的动力。巴基斯坦驻华大使莫因·哈克说:“相信中国一定能够实现国家发展目标,建设一个物质文明和精神文明相协调的强大国家。”俄罗斯联邦共产党中央委员会主席根纳季·久加诺夫表示,中国的快速发展已成为人类文明发展进程中一项重大成就,中国式现代化的成功经验将为更多国家和人民开辟通往美好未来的道路。