糖心logo官网✅_智利 女-艺文笔记

王金豹 2025年11月12日 12:39:30
发布于:曼谷

糖心logo官网✅_智利 女_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Installation of the PTU Manifold CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN _______ YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO MUCH.  CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS _______  LUBRICANT.

 (1)  Remove the sealant from the mating surface of the manifold (7) and the aircraft structure with a plastic or wooden scraper.

 (2)  Clean the component interface and/or the adjacent area.

 (3)  Do an inspection of the component interface and/or the adjacent area.

 (4)  Examine the structure of the aircraft in the area of the manifold attachment for cracks, corrosion or other damage.

 (5)  Apply a layer of SEALANTS (Material No. 09-018) to the mating surface of the manifold (7).

 (6)  Put the manifold (7) in position on the aircraft and install the bolts (1) and the washers (2). Do not tighten the bolts (1).

 (7)  Remove the blanking plugs from the pipe end-fittings and the unions on the manifold (7).

 (8)  Make sure that the hydraulic line end-fittings are serviceable.

 (9)  Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of the line end-fittings.

 (10)  Connect the pipe (11) to the union (13).

 (11)  TORQUE the pipe end-fitting (12) to between 9.7 and 10.7 m.daN (71.53 and 78.90 lbf.ft).

 (12)  Connect the pipe (21) to the check valve 3093GM.

 (13)  TORQUE the pipe end-fitting (22) to between 12.9 and 14.2 m.daN

 (95.13 and 104.71 lbf.ft).

 (14)  Connect the pipe (48) to the union (50).

R 1EFF : 059-099, 102-105, 151-152, 201-206, 1 29-13-15Page 420 1 1 May 01/05 1 1 1CES 1

 (15)  TORQUE the pipe end-fitting (49) to between 1.5 and 1.7 m.daN (11.06

 (16)  Connect the pipe (3) to the reducer (5).

 (17)  TORQUE the pipe end-fitting (4) to between 5.4 and 5.9 m.daN (39.82 and 43.51 lbf.ft).

 (18)  Tighten the bolts (1).

 (19)  Make sure that the isolation coupling (45) engages correctly in the coupling half (46).

 (20)  Remove the blanking caps from the electrical connectors.

 (21)  Make sure that the electrical connectors are clean and in the correct condition.

 (22) Connect the electrical connector (29) to the PTU solenoid valve. R **ON A/C 001-049, 051-058, 101-101, R Post SB 29-1094 For A/C 001-049,051-058,101-101,  Subtask 29-13-15-560-050-D  A. Preparation of the Replacement Component  (1) Remove the components which are attached to the removed manifold (7) as follows:  (a)  Remove the PTU solenoid valve 3012GL (Ref. TASK 29-23-51-000-002).

 (b)  Remove the priority valve 3064GM (Ref. TASK 29-13-33-000-001).

 (c)  Remove the bobbins (9),(30) (Ref. TASK 20-23-21-911-001).

 (d)  Remove and discard the following items from the bobbins:

 -square section seals (10),(31),  -back-up rings (36), (37), (39), (40) and  -O-rings (35), (38).

 (e)  Put the bobbins (9),(30) into plastic bags to keep them clean.

 (f)  Remove the check valve 3093GM and discard the O-ring (23).

R 1EFF : 001-049, 051-099, 101-105, 151-152, 1 29-13-15Page 421 1201-206, 1May 01/05 1 1 1CES 1

 (g) Remove the check valve 3094GM as follows:

 1_ Cut, remove and discard the lockwire.  2_ Remove the check valve 3094GM and discard the O-rings  (15),(16) and the back-up rings (41).

 (h)  If necessary, remove and discard the lockwire from the coupling half (46) and the manifold (7).

 (i)  Remove the coupling half (46) and discard the packing (47).

 (j)  If necessary, remove the reducer (5) and discard the packing (52).

 (k)  If necessary, remove the union (13) and discard the packing (53).

 (l)  Install the blanking plugs on the open ports of the manifold (7).

 (m)  Install the blanking plugs on all of the removed components.

 (2) Install the removed components on the replacement manifold (7) as follows:  (a)  Remove the blanking plugs from the manifold (7) and the components.

 (b)  Lubricate the new O-rings and the threads of the components with HYDRAULIC FLUIDS (Material No. 02-003).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压4

原标题:
48 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 土超女排PTT苦战2

      在脖子哥看来,MEGA的“不及预期”,是宣发、产品、定价三者的错位。
  • 黄金出现卖出信号,第一目标见1214.74

      商务部中国国际电子商务中心电子商务首席专家李鸣涛表示,激活消费应该成为当前经济政策的优先事项,通过提升消费快速形成应对经济下行的强大拉动力。同时,消费活跃也是未来经济发展信心的重要体现,当前,信心比黄金更重要。“618”是我国上半年网络零售最重要的集中促销活动,尤其是在当前社会消费增长进入下行通道,线下零售受疫情防控措施影响较大的情况下,今年“618”大促应该成为刺激消费、重拾信心的关键一仗。
  • 黄金持稳于逾一周高位附近,待FED官员讲话提供新指引

      如何让人才培养更好地服务国家重大战略需求?教育部高校学生司负责人介绍,2020年,教育部在部分高校启动实施“强基计划”,着力选拔一批“有志于服务国家重大战略需求且综合素质优秀或基础学科拔尖的学生”进行专门培养。项目实施3年来,共录取新生1.8万余人。
  • 原钉钉CEO无招将离职创业,创业方向为跨境出海领域

      在外界看来,MEGA是否“一炮而红”,对于理想汽车至关重要。去年,理想汽车交付量达37.6万辆,成为国内造车新势力销冠,为此今年李想也制定了冲击80万辆的年销目标。不过,随着今年车市竞争进一步升级,理想汽车的竞争对手们也持续加码。今年前2个月,理想汽车月销量均被AITO问界超越。此外,春节后,开始“掀桌”降价,随后多家车企跟进,车市再度开启价格“热”战,内卷对于理想汽车来说挑战加剧。
  • 王慧文病休后的遗憾,阿里腾讯掏23亿美元弥补

      建议开展专项整治、完善市场准入及退出机制
  • 资本市场如何进行供给侧改革

      4、本次可行权股票期权的行权价格为13.35元/股。若在激励对象行权前公司有资本公积金转增股本、派送股票红利、股票拆细、缩股、派息、配股或增发等事项,应对股票期权行权价格进行相应的调整。
  • 赵明回应荣耀将创立子品牌:还需观察

      上图为走访百强装企门店调研照片实录
  • Michael Kors 法国约66%的员工将被裁减

      在去年12月的2023年中国企业领袖年会上,蔚来创始人李斌说,“蔚来在这个行业里边,一直被媒体和同行认为是比较喜欢长期思考的一家公司。”
  • 讲座报名:科学填报志愿 合理选择院校及专业

      新一年的汽车市场在比亚迪吹响的号角之下,将几乎所有人卷入了价格战之中,风雨飘摇的高合甚至连一战的资格都没有。
  • 芒种:人生万事不过种和收

      景顺长城基金管理有限公司
  • 孙杨顾问律师:将更换团队 在国内也要提起诉讼

      SpaceExplorers-SpacewalkersExtended(Felix&PaulStudios)
  • 短期围绕3000点做文章

      “只靠区块链单一的技术,很难满足产业的发展需求。应该以客户的价值为先,很多技术之间创新融合,解决商业中现实的问题,成为整个区块链技术发展的主流趋势。”蚂蚁集团副总裁蒋国飞说。
  • 美国通胀数据再掀金融海啸 黄金日内冲高回落

      乔丹-史密斯(JordanSmith)68杆、尚恩-诺瑞斯(ShaunNorris)68杆、特里斯顿-劳伦斯(ThristonLawrence)63杆,以265杆,低于标准杆23杆,并列位于第二位。
  • 特斯拉工厂火灾疑为恐袭 德国最高检察官接管调查

      激烈的富翁争夺战中,遇到小游戏时不妨活动活动手指,放松一下,来玩个简单轻松的小挑战。大富翁11包含4种小游戏,有经典的‘拆炸弹’,也有全新登场的‘投娃娃’。无论碰到哪个挑战,记住一个秘诀——避开炸弹,就可以轻松拿到高分,获得一笔不小的金钱奖励。