国内精品♨️_美女被日动态图-艺文笔记

王金豹 2025年11月11日 00:47:49
发布于:曼谷

国内精品♨️_美女被日动态图_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in Para. 3.  5. Close-up________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 239  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 2  1. Possible Causes _______________  - ELAC-2 (2CE2)

 - wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC2 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-2 (2CE2), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 241  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Green Hydraulic Pressure Switch Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the LOW GREEN PRESS signal from the ELAC 1 (2CE1) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 3

原标题:
96 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 廖群:2023年1

      2015年成立到2019年底提交IPO申请,蛋壳公寓共完成7轮、58亿元融资。但各种黑天鹅之下的空置率和融资不顺使蛋壳难以为继,加之其创始人的意外被调查,公司最终被迫退市。
  • 增速放缓亟需政策进一步发力

      由InsomniacGame制作的索尼第一方大作《漫威蜘蛛侠2》现已上线英服PS商店页面,预计于2023年发售,登陆PS5平台,玩家现在可以将游戏添加到愿望单。
  • 一女子在 Meta《地平线世界》游戏中体验元宇宙遭陌生人“性侵”

      谁不希望身边的人都是真心以待的朋友呢?
  • 任泽平:中国经济正站在产能新周期底部和金融周期顶部

      数据、算力和算法构成了大模型的基石。在当下这波如火如荼的大模型淘金热中,从学界到初创企业再到巨头纷纷下场,而无论其技术路线是开源或闭源,应用场景是通用或垂直,AI芯片作为大模型大脑,始终是模型预训练和推理必不可少的工具。
  • 新华社:世纪之战

      优惠规则也更加简单。京东把“头号京贴”升级为跨店满减,消费者不用再单独领券,直接下单就能享受每满299减50的优惠;天猫的跨店满减优惠从去年的“跨店满200减30”升级至今年的“跨店满300减50”;拼多多通过平台红包、百亿补贴、满300返50、大牌直降、买一送一等福利直接让利消费者;推出“专享价格+单品红包”,用户不用凑单,一件就能立减。
  • 五矿经易期货:铁矿石1905合约交易报告

      这所位于安徽六安大别山深处的学校,因高升学率、壮观的送考仪式和《舌尖上的中国》而声名远播。慕名而来的学生每年都在万人以上。跟着他们一起来的则是数量庞大的陪读家长队伍。为了让孩子全身心投入学习,他们放弃工作,在学校外租房,全天候照顾孩子的生活起居。
  • 如何找到对的人 男女都要一起来看看

      注:上表拟提供担保或反担保的控股子公司包括但不限于重庆金科,具体担保方式及担保公司以担保事项实际发生时金融机构的要求为准。
  • 被轻视的便秘,久蹲一族的潜在风险

      (二)发行人股东林培高、陈绍龙、李伟华、孙伟杰承诺:
  • 2月CPI同比由降转涨 更多扩内需政策酝酿出台

      国家发改委分析指出,3月第1周猪价呈现降-涨-降走势,均价略高于上周。周前期,终端需求较为疲软,屠宰企业压价意向较强,猪价略有走低;周中期,随着二次育肥热度提升,市场供应量持续收紧,猪价自南向北联动上涨;但终端消费改善有限,周后期屠宰企业压价意向再度转浓,猪价止涨转跌。供需博弈激烈,但养殖单位仍有抗价情绪,预计3月第2周猪价或频繁涨跌调整。
  • 11月19日 COMEX 12月期银未平仓合约减少7776手

      苹果专利图14是一种说明性可穿戴设备的侧视图,其中构件在接头处耦合,例如带有摩擦铰链和/或扭转弹簧的接头;图21是一种说明性设备的透视图,该设备带有一对平行的独立可调铰链表带部分;图22是图21说明性设备的透视图,其中铰链带部分被配置为形成iPhone的支架。
  • 新浪VR

      更不用说,理想汽车过往一直引以为傲的“油箱”这次被拿掉了。这势必导致不少对于电动车接受度没那么高的保守型用户,基于补能焦虑放弃选择MEGA。而理想引以为傲的5C超级充电由于总数有限,用户在试驾过程中也往往无法对充电速度进行体验。