天堂岛精品🔇_如何让女性喷水-艺文笔记

王金豹 2025年11月12日 09:59:58
发布于:曼谷

天堂岛精品🔇_如何让女性喷水_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Installation of the PTU Manifold CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN _______ YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO MUCH.  CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS _______  LUBRICANT.

 (1)  Remove the sealant from the mating surface of the manifold (7) and the aircraft structure with a plastic or wooden scraper.

 (2)  Clean the component interface and/or the adjacent area.

 (3)  Do an inspection of the component interface and/or the adjacent area.

 (4)  Examine the structure of the aircraft in the area of the manifold attachment for cracks, corrosion or other damage.

 (5)  Apply a layer of SEALANTS (Material No. 09-018) to the mating surface of the manifold (7).

 (6)  Put the manifold (7) in position on the aircraft and install the bolts (1) and the washers (2). Do not tighten the bolts (1).

 (7)  Remove the blanking plugs from the pipe end-fittings and the unions on the manifold (7).

 (8)  Make sure that the hydraulic line end-fittings are serviceable.

 (9)  Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of the line end-fittings.

 (10)  Connect the pipe (11) to the union (13).

 (11)  TORQUE the pipe end-fitting (12) to between 9.7 and 10.7 m.daN (71.53 and 78.90 lbf.ft).

 (12)  Connect the pipe (21) to the check valve 3093GM.

 (13)  TORQUE the pipe end-fitting (22) to between 12.9 and 14.2 m.daN

 (95.13 and 104.71 lbf.ft).

 (14)  Connect the pipe (48) to the union (50).

R 1EFF : 059-099, 102-105, 151-152, 201-206, 1 29-13-15Page 420 1 1 May 01/05 1 1 1CES 1

 (15)  TORQUE the pipe end-fitting (49) to between 1.5 and 1.7 m.daN (11.06

 (16)  Connect the pipe (3) to the reducer (5).

 (17)  TORQUE the pipe end-fitting (4) to between 5.4 and 5.9 m.daN (39.82 and 43.51 lbf.ft).

 (18)  Tighten the bolts (1).

 (19)  Make sure that the isolation coupling (45) engages correctly in the coupling half (46).

 (20)  Remove the blanking caps from the electrical connectors.

 (21)  Make sure that the electrical connectors are clean and in the correct condition.

 (22) Connect the electrical connector (29) to the PTU solenoid valve. R **ON A/C 001-049, 051-058, 101-101, R Post SB 29-1094 For A/C 001-049,051-058,101-101,  Subtask 29-13-15-560-050-D  A. Preparation of the Replacement Component  (1) Remove the components which are attached to the removed manifold (7) as follows:  (a)  Remove the PTU solenoid valve 3012GL (Ref. TASK 29-23-51-000-002).

 (b)  Remove the priority valve 3064GM (Ref. TASK 29-13-33-000-001).

 (c)  Remove the bobbins (9),(30) (Ref. TASK 20-23-21-911-001).

 (d)  Remove and discard the following items from the bobbins:

 -square section seals (10),(31),  -back-up rings (36), (37), (39), (40) and  -O-rings (35), (38).

 (e)  Put the bobbins (9),(30) into plastic bags to keep them clean.

 (f)  Remove the check valve 3093GM and discard the O-ring (23).

R 1EFF : 001-049, 051-099, 101-105, 151-152, 1 29-13-15Page 421 1201-206, 1May 01/05 1 1 1CES 1

 (g) Remove the check valve 3094GM as follows:

 1_ Cut, remove and discard the lockwire.  2_ Remove the check valve 3094GM and discard the O-rings  (15),(16) and the back-up rings (41).

 (h)  If necessary, remove and discard the lockwire from the coupling half (46) and the manifold (7).

 (i)  Remove the coupling half (46) and discard the packing (47).

 (j)  If necessary, remove the reducer (5) and discard the packing (52).

 (k)  If necessary, remove the union (13) and discard the packing (53).

 (l)  Install the blanking plugs on the open ports of the manifold (7).

 (m)  Install the blanking plugs on all of the removed components.

 (2) Install the removed components on the replacement manifold (7) as follows:  (a)  Remove the blanking plugs from the manifold (7) and the components.

 (b)  Lubricate the new O-rings and the threads of the components with HYDRAULIC FLUIDS (Material No. 02-003).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压4

原标题:
22 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 初探贵港龙井村古民居——陈氏老宅

      ·年度VR内容创作者奖
  • 经济换档期财政与货币政策须高度协调配合

      北京警方提示,节假日期间出行人员较多,请大家一定要提高安全防范意识,在乘坐公共交通工具、商市场购物、景区旅游等人多场所,要留意好自身财物,以防被盗。
  • 石景山

      末伏:8月10日-8月19日(10天)
  • 更多>>视频

      2023年6月6日,红杉资本宣布将在2024年3月31日前实现三大区域(美欧、中国、印度/东南亚)的各自完全独立,并采用不同品牌运营。曾经,为了寻找更大、更具活力、更有未来的市场,西方风险投资家们携美元基金知名品牌来到中国,催生了这片土地上的创投行业。
  • 改革牛2.0明年中期将现

      药明康德业务模式,本质上是新药掘金路上的“卖水人”角色,为医药企业提供新药研发和生产服务。全球新药研发则以美国为首。
  • 熊猫发行30周年金银币价格今天多少一克(2018年11月06日)

      超聚变一直是资本市场的热词之一,其自带“华为+算力”的双光环,一旦有新消息出来,知名游资、机构、外资也坐不住。
  • 新浪彩票双色球名家第23140期推荐汇总

      除了在基础研究上有重大意义外,此项成果也为解决我国人口健康领域的重大挑战做出贡献。据介绍,利用体细胞克隆技术制作脑疾病模型猴,为人类面临的重大脑疾病的机理研究、干预、诊治带来前所未有的光明前景。
  • 港珠澳大桥即将正式通车 这10件事你要知道(图)

      广东工人来源:大多来自于一些周边省份,如江西、湖南、安徽等地,有部分本地工人,北方籍工人数量较少;
  • 长安期货:春节备货开启 鸡蛋仍有上涨空间

      北京市教委明确,中小学组织研学旅行活动坚持学生和家长自愿参加原则,不得将学生参加研学旅行活动情况作为学校教育评价的依据和标准,不得与学生升学、毕业挂钩。同时,学校不得以组织研学旅行为名开展变相旅游,确保研学旅行和学校课程有机融合,避免学生“只旅不学”。学校应为不参加活动的学生提供相关课程学习机会,确保学习效果。
  • 2018戊戌狗年150克彩色纪念金币价格(2018年11月06日)

      经此一役,特斯拉彻底坐稳全球新造车的头把交椅,其股价一年增长了743.4%,超越全球所有的汽车厂商市值的总和。
  • 农夫山泉,四面楚歌

      而对于外界猛烈质疑,苏亚雷斯并没有正面回答,“我对我所有的队员都是满意的。他们在场上拼搏和付出我都是看在眼里的,他们的阵型我也是看到了。”
  • 传销还是委托理财?当事人投资虚拟货币186万资金“打水漂” 法院这样判

      城乡经济循环是国内大循环的题中应有之义,也是确保国内国际双循环比例关系健康的关键因素。“三农”涉及的行业多、领域广、群体大,在扩大国内需求、构建新发展格局中,可腾挪的空间、可挖掘的潜力非常广阔,对稳增长、稳就业、稳物价的战略支撑作用非常突出。随着农民收入持续增长,农村消费加快升级,预计每年可新增2万亿元左右的消费需求。到2022年末,我国常住人口城镇化率为65.22%,还有较大提升空间。初步测算,未来5至10年,高标准农田、设施农业等乡村建设投资需求有近15万亿元。把战略基点放在扩大内需上,就要充分发挥乡村作为消费市场和要素市场的重要作用,全面推进乡村振兴,推进以县城为重要载体的城镇化建设,推动城乡融合发展,增强城乡经济联系,畅通城乡经济循环。
  • 史上最严调控出台,房地产小周期趋于结束

      对此,中国家居产业发展峰会大雁奖组委会执行秘书长王晓洁指出,当前,家居行业作为大宗消费品,被赋予了更大的期待,而家居企业和品牌的高质量发展则成为推动美好生活的重要力量。2023中国家居产业发展峰会旨在增强企业质量和品牌发展能力,推动开展中国品牌创建行动,开展品牌理论、价值评价研究,完善品牌价值评价标准、推动品牌价值评价和结果运用,为产业聚力、为品牌赋能。协会:达成认知,扩圈向上