免费精品综合导航👅_精品伊甸乐园二区三区-艺文笔记

王金豹 2026年01月30日 02:10:28
发布于:曼谷

免费精品综合导航👅_精品伊甸乐园二区三区_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

TASK 27-61-00-840-802 5. Put the Spoiler Systems A and B Back to the Condition Before the Pressure Removal (Figure 201, Figure 202) A. References Reference Title 12-12-00-610-801 Hydraulic Reservoir Servicing (P/B 301) SWPM 20-60-03 Standard Wiring Practices Manual B. Tools/Equipment NOTE: When more than one tool part number is listed under the same "Reference" number, the tools shown are alternates to each other within the same airplane series. Tool part numbers that are replaced or non-procurable are preceded by "Opt:", which stands for Optional. Reference Description SPL-1675 Assembly - Lock, Flight Controls (Part #: F80049-18, Supplier: 81205, A/P Effectivity: 737-100, -200, -200C, -300, -400, -500, -600, -700, -700C, -700ER, -700QC, -800, -900, -900ER, -BBJ) (Opt Part #: F80049-12, Supplier: 81205, A/P Effectivity: 737-100, -200, -200C, -300, -400, -500, -600, -700, -700C, -700ER, -700QC, -800, -900, -900ER, -BBJ) C. Consumable Materials Reference Description Specification G50171 Compound - Corrosion Inhibiting Compound, Interior Application - D5026NS or ZC-026 D. Location Zones Zone Area 133 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Left 134 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Right 210 Subzone - Control Compartment - Body Station 178.00 to Body Station 259.50 E. Procedure SUBTASK 27-61-00-080-002 (1) Remove the flight controls hydraulic module locks from the spoiler shutoff valves. (a) Remove the lockpins. (b) Remove the lock, SPL-1675 from the two spoiler shutoff valves. (c) Put the manual override lever at the two spoiler shutoff valves in the position 1 (ON position). (d) Before you connect the electrical connector, examine the connector for corrosion. 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-61-00 Page 209 Oct 10/2007 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details WARNING: DO THE STEPS BELOW IF THE AIRPLANE OPERATES AT AIRPORTS WHERE DEICING FLUID THAT CONTAIN POTASSIUM FORMATE IS USED. ALSO DO THE STEPS FOR ALL AIRPLANES THAT YOU FOUND CORROSION IN THE ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL. THE ELECTRICAL CONNECTOR IS PART OF A SYSTEM THAT IS NECESSARY FOR SAFE FLIGHT. (e) If there was corrosion, refer to (SWPM 20-60-03) to correct the problem. (f) Apply the D5026NS or ZC-026 compound, G50171 to the connector (SWPM 20-60-03) (g) Connect the electrical connector to the spoiler shutoff valve at the spoiler hydraulic modules A and B. SUBTASK 27-61-00-860-011 (2) Set the SPOILER A and B switches on the forward overhead panel to the ON position. SUBTASK 27-61-00-860-012 (3) Remove the safety tag and close this circuit breaker: F/O Electrical System Panel, P6-2 Row Col Number Name B 12 C00204 FLIGHT CONTROL SHUTOFF VALVES SPOILER SUBTASK 27-61-00-860-013 (4) Pressurize the hydraulic reservoirs if it is necessary. To pressurize them, do this task: Hydraulic Reservoir Servicing, TASK 12-12-00-610-801. ------------------------- END OF TASK --------------------------- 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-61-00 Page 210 Oct 10/2007 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details SPOILER CONTROL SYSTEM - ADJUSTMENT/TEST 1. General A. This procedure has these tasks: (1) Spoiler Control System Operational Test (a) This test can be used to quickly give the status of the spoiler control system. This test can be done without special tools or equipment. (2) Spoiler Control Cables Adjustment (3) Ratio Changer Input Rod Adjustment (4) Flight Spoiler Adjustment (a) An adjustment of the clearance between the flight spoilers and the flaps. (5) Spoiler Actuator Linkage Adjustment (6) Spoiler Mixer Adjustment (7) Spoiler Position Sensor Adjustment (a) This is an adjustment and test of the operation of the spoiler position sensors No. 3 and 10. (8) Flight Spoiler System Test (a) This is a test of the operation of the flight spoilers No. 2, 3, 4, 5, 8, 9, 10, and 11. (9) Spoiler Manual Operation Test (10) Spoiler Operation Time Test (11) Alternate Spoiler Position Sensor Test (a) This is a test of the operation of the spoiler position sensors No. 4 and 9. (12) Spoiler Mixer No-Back Assembly Test (13) Spoiler Mixer Centering Mechanism Operational Test B. The spoiler control system gives lateral control and speed brake signals to the flight spoiler   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-600-700-800-900 飞机维护手册6 AIRCRAFT MAINTENANCE MANUA

原标题:
8 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 周杰伦演唱会海口站延期举办 具体时间将另行通知

      该车配备宁德时代5C麒麟电池,续航710km,CLTC工况每百公里电耗15.9kWh,号称拥有充电12分钟补能500km的水准,号称“全世界量产车最快充电速度”。
  • 爱彼迎离开之前,民宿梦就已经破灭了

      北京商报记者了解到,在距收费口前300米的匝道高杆上方增设ETC预交易天线。别小看这小小的升级改造,它可以在司机驶过时,就能通过天线扫描并识别出车辆信息,实现ETC扣费。等车辆驶入收费口时,直接抬杆放行,不再二次扣费。因此过往的车辆此时便可以顺畅通行。
  • 筑家20载·逐梦新未来丨新豪轩门窗「筑家日」重磅官宣,掀起理想筑家新浪潮!

      这两个人的渊源是丁磊曾经是乐视汽车中国及亚太区的CEO,后来高端大气上档次的FF91量产希望破灭,他们一个去了美国造车,一个新成立品牌继续造车。
  • 中国宁波一号主场加冕 再捧世界冠军奖杯

      近日,英伟达创始人黄仁勋和OpenAI创始人奥特曼在谈及AI时纷纷表示,AI的尽头是光伏和储能。据悉,英伟达CEO黄仁勋在一次公开演讲中指出,AI未来发展与状和储能紧密相连。“AI的尽头是光伏和储能!我们不能只想着算力,如果只考虑计算机,我们需要烧掉14个地球的能源。”
  • 安妮海瑟薇 快去向俞飞鸿讨教保养秘籍

      为了支持生成式AI初创企业,TogetherAI与英伟达、CrusoeCloud、Vultr等合作,在欧美地区运营云计算中心,为企业提供推理、训练等服务。其中,文生视频平台PikaLabs是其合作伙伴之一,刚刚获得5500万美元融资。新浪声明:新浪网登载此文出于传递更多信息之目的,并不意味着赞同其观点或证实其描述
  • 救市资金何时退出更合适?

      篮网120-101大胜骑士:
  • 排超女排总决赛II天津复仇 3

      2、在股东大会批准上述担保额度的前提下,提请股东大会授权公司董事会并由董事会进一步授权公司经营管理层,审批因融资等事项而对参股房地产项目公司提供担保及调剂、签署所需各项法律文件的具体事宜。
  • 本轮房地产下滑有何不同?

      对此,理想汽车迅速发出投诉函,强烈谴责这种恶意P图行为,称其故意歪曲理想汽车的用途,将新品影射为装载死者的丧葬用品(殡仪车),严重侵害了理想汽车的产品形象及品牌声誉。理想汽车明确表示,这种侵权图片及其内容已构成侮辱,侵犯了其名誉权。
  • 深化高端市场定位 亿合门窗牵手国家级体育赛事CTA网球赛

      在家装企业的展厅中,基本配置的标准产品在合作企业的产品体系中只能属于产品线的低端,选配产品中,也很难见到合作企业主打的高性价比产品。
  • 锐科激光净利润 同比增长446.87%

      巨大的烟囱,明媚的阳光,起航中的邮轮展现出一幅令人印象深刻的景象。英国卡纳德邮轮公司(Cunard)的卢西塔尼亚号皇家邮轮(RMSLusitania)配备了与其对手不同的新型发动机,并将打破跨洋航行的最快纪录,而且不是一次打破,是两次。
  • 男人必读:男人究竟要靠什么来吸引女人的注意

      本周,具有争冠实力的球员还包括:IRS马来西亚公开赛冠军、FireballsGC战队的西班牙球员大卫-普伊格(DavidPuig)以及在澳门两度夺冠的两位球员——印度選手加甘吉特-布拉尔(GaganjeetBhullar)、澳洲老将斯科特-亨德(ScottHend)。
  • 黄仁勋:AMD等对手就算是免费 也无法击败英伟达!

      Meta表示,与v59及之前版本相比,QuestPro用户应该会看到MR体验的CPU性能提高34%,GPU性能提高19%。
  • 股海导航 3月1日沪深股市公告与交易提示

      一、可转债发行上市概况
  • 中国古代私家园林建筑的杰出代表 苏州名片之一

      原标题:战“疫”行动,需要平等之光照耀(和音)
  • 尾盘强势拉升 期指氛围仍偏多

      今年2月底,杨植麟创立的月之暗面获得阿里巴巴、美团与小红书等联合投资的10亿美元;再往前,张鹏的智谱AI截至2023年10月累计获得了25亿元的融资,美团、腾讯、阿里以及小米等是主要投资方;王小川的百川智能则获得了腾讯投资、阿里巴巴、小米以及深创投等机构3亿美元A1轮融资。