深夜福利✅_国产精品人妻一码二码🍜-艺文笔记

王金豹 2026年01月23日 02:30:08
发布于:曼谷

深夜福利✅_国产精品人妻一码二码🍜_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

__________  Subtask 24-24-34-860-052  A. Aircraft Maintenance Configuration  (1)  Make sure that the ground service network is energized  (Ref. TASK 24-42-00-861-001).

 (2)  Make sure that the warning notice is in the cockpit, on the EMER ELEC PWR section of the overhead panel 21VU, to tell persons not to operate the pushbutton switches.

 (3)  Make sure that the access platform is in position at the access doors 812 and 822 of the avionics compartment.

 (4) Make sure that the access doors 812 and 822 are open.  Subtask 24-24-34-865-051

 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION ------------------------------------------------------------------------------- R 105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01 R 106VU CSM/G /EV/MAN/SPLY 6XE B04 R  4. Procedure _________  (Ref. Fig. 401/TASK 24-24-34-991-001)  Subtask 24-24-34-420-050

 A. Installation of the GCU  (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  Remove the blanking caps from the electrical connectors.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Put the CSM/G control unit (1) in position.

 (6)  Install the washers (2) and the screws (3) and then tighten the screws.

 (7) Connect the electrical connector (4).  Subtask 24-24-34-865-052

 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 6XE, 7XE Subtask 24-24-34-710-050

 C. Operational test  (1) Do an operational test of the emergency GCU, with the CFDS (Ref. TASK 24-24-00-710-002).  NOTE : As an alternative procedure, do this operational test without ____  the CFDS.

 (2) Do an operational test of the emergency GCU without the CFDS (Ref. TASK 24-24-00-710-001).  5. Close-up ________ Subtask 24-24-34-410-050  A. Close Access  (1)  Make sure that the work area is clean and clear of tool(s) and other items.

 (2)  Close the access doors 812 and 822.

 (3)  Remove the warning notice(s).

 (4) Remove the access platform(s). Subtask 24-24-34-860-051  B. Put the aircraft back to its initial configuration.  (1) De-energize the ground service network  (Ref. TASK 24-42-00-862-001).

 GENERATOR - CONSTANT SPEED MOTOR (CSM/G) (8XE) - REMOVAL/INSTALLATION _____________________________________________________________________ TASK 24-24-51-000-001 Removal of the Constant Speed Motor/Generator (CSM/G) (8XE) WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES. _______  WARNING : DO NOT WALK ON A CLOSED LANDING GEAR DOOR.

 1.  Reason for the Job

__________________  Self Explanatory

 2.  Job Set-up Information

______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific blanking caps No specific blanking plugs No specific circuit breaker(s) safety clip(s) No specific drainage container No specific warning notice No specific stepladder 2 m (6 ft. 7 in.)  B. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized  Configuration before Maintenance Action 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 32-12-00-010-001 Open the Main Gear Doors for Access 24-24-51-991-001 Fig. 401  3. Job Set-up __________ Subtask 24-24-51-860-050  A. Aircraft Maintenance Configuration  (1) On the overhead panel 21VU, make sure that:  - the guarded pushbutton-switch EMER GEN TEST is released (the guard is closed),

 - the guarded pushbutton-switch MAN ON/AUTO is released (the guard is closed),

 1EFF : ALL 1 24-24-51Page 401 1 1 Feb 01/99R 1 1 1CES 1

 -the guarded pushbutton-switch RAT MAN ON 2805GE is released (the guard is closed).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM ELECTRICAL POWER 电源2

原标题:
82 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 任泽平:两会传递出新时代重大信号

      此时,静静的另一席话
  • 真人版在逃公主 女明星的cos真的很不错

      为期四天的保守党年会4日落幕,为了应对在提前大选中失利的局面,保守党政府在民生政策上做了诸多调整,冻结英格兰地区大学学费上涨,向选民承诺,保守党要为每一个人服务,要促进经济增长。其内阁成员在大会发言中也高调展示团结姿态,表示有信心取得脱欧谈判的成功。而10月3日,欧洲议会议员在开会中提议,暂时停止脱欧谈判,因为谈判四轮后都没有签下任何协议。
  • 中国面对贸易战应以打促和

      创新科教协同、导师制、本硕博衔接等培养模式
  • 开年经济表现如何?一组先行指数告诉你

      第二,在互联网上分享课程
  • 禅宗初祖达摩大师(图)

      印度的新基地是印度洋及其邻近海域日益军事化的最新例证。该地区具有巨大的经济重要性。据美国政府统计,约80%的海上原油贸易都要经过印度次大陆周边海域。
  • 申银万国:中美关系牵动市场 消息作用价格大幅波动

      1、自公司股票上市之日起12个月内,不转让或者委托他人管理本人在本次发行及上市前直接或间接持有的发行人股份,也不要求发行人回购该部分股份。
  • 人类文明还剩多少年?

      1995还是1999?这是“英伟达们”的关键问题
  • 曝联通、移动将跟进卫星通信业务:手机直连卫星关键时刻能救命

      受波尔多雨季的启发,风衣成为本季的一个核心单品,除了经典的表达,Rousteing也对其进行了重塑。风衣被切割为短夹克和伞裙,结合缠绕设计变身紧身长裙,通过拼接薄纱风琴褶赋予其全新的外观。
  • 谁能替代英伟达?

      有娃哈哈经销商透露,每年的经销商大会演讲之后,娃哈哈全国范围内的经销商还会以省为单位单独和宗庆后开小会。无论经销商提出什么问题,宗庆后往往都会现场给思路,碰到现场回答不了的,就让一旁的秘书记下来,要求区域经理之后想办法解决。
  • 更多>>视频

      国寿嘉园·天津乐境构建了“小病不出门,养生有人管,大病有保障”的三重医疗保障,将医疗服务融入日常养老中,为长者提供了全方位、全周期的健康保障。稍显遗憾的时候,天津乐境目前与外部医院的绿色通道尚有拓展空间。此外,社区在智慧运营方面也有可提升的空间。
  • 科思科技被质疑欺诈发行?上下游惊现"熟人"魅影 高募20亿后应收款"烂尾"

      此外,张咏梅建议文旅部门加强对文创产业的培育扶持,鼓励文创企业与博物馆、研究院合作,与中华传统文化、非遗元素相结合,创造出更多具有现代审美和实用价值的文创产品,让良币驱逐劣币,用“有温度、有态度”的优质文创产品挤压低俗文创产品的生存空间,发挥更大的育人价值。
  • “2点半效应”再现 期指动向仍看权重

      总体看,中国餐饮连锁产业还处于初级阶段,可提升空间较大。据《2023中国餐饮加盟行业白皮书》显示,2022年中国的餐饮连锁化率仅为19%,但仍远低于美国54%的水平。对品牌方而言,仰望星空的同时,更要脚踏实地,毕竟因加盟而翻车的前车之鉴不少。
  • 14K金价格多少钱一克(2024年03月12日)

      好故事让孩子“被看见”
  • “中国家装百强装企走访调研”(半程)报告

      不过,流量淡去后,新抖数据显示,李亚鹏近30天直播场次不少,共进行15次直播,带货时仅上架商品20款左右。平均下来,场均直播时长只有2.29小时,场均销售额不超过250万。
  • 无锡药明康德新药开发股份有限公司关于澄清事项的进一步公告

      近日,东部战区海军航空兵某机场战机列阵、引擎轰鸣。“起飞!”随着指挥员一声令下,多型战机接续升空,一场多课目、多批次跨昼夜飞行训练拉开帷幕。(来源:东部战区)