国产自拍👅_黄色A影院-艺文笔记

王金豹 2026年01月31日 01:41:17
发布于:曼谷

国产自拍👅_黄色A影院_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

(5) Lost, when speed is below 50 kt. LGCIU SYS 1 Norm Norm Norm ABCU Norm Norm Norm L/G BRK PRESS IND Norm Norm Norm PARK BRK Norm Norm Norm LIGHTS EEMMEERR CCAKBPT NNoorrmm NNoorrmm NNoorrmm IR N° 1 only (2) N° 1 only (2) N° 1 only (2) ADR N° 1 only N° 1 only N° 1 only ADF N° 1 only Inop Inop VOR-MMR N° 1 only N° 1 only N° 1 only (1) DME N° 1 only Inop Inop VOR/DDRMI Norm Norm Norm (1) ATC N° 1 only Inop Inop NAV ISIS Norm Norm Norm (1) IR2 and IR3 are lost 5 min after failure of the main generators. But, if IR3 replaces IR1 (ATT-HDG selector at CAPT3), IR3 remains supplied (6) Lost, when speed is below 50 kt. ENG 1 BLEED Norm BMC 1 inop BMC 1 inop ENG 2 BLEED BMC 2 inop BMC 2 inop BMC 2 inop APU BLEED Inop Inop Inop (1) PNEU X BLEED (MAN CTL) Norm Inop Inop (7) Restored, when speed is below 100 kt. ECB - STARTER Norm (2) Inop Inop (1) APU FUEL LP VALVE Norm Norm Norm FUEL PUMP Norm Norm Norm (1) Restored, when speed is below 100 kt. (2) For APU start only. FADEC A + B (1) A + B (1) A + B (1) PWR PLT IGNITION A only A only A only HP FUEL VALVE closure Norm Norm Norm (1) Channels A and B are self-powered above 10 % N2. If N2 is below 10 % , only Channel A is powered. MISC MECH HORN Norm Norm Norm FLT ON BAT ONLY Flight time on batteries only may be increased to at least 30 min as follows: ENG MODE SEL................................................................................................................................. NORM ANTI ICE PITOT 1 C/B (D02).................................................................................................................PULL 26 V ADIRU 1 C/B (F07)........................................................................................................................PUL L CM 1 altitude, speed, and vertical speed indication on PFD are lost. Use standby instruments ? 7 min before landing: ANTI ICE PITOT 1 C/B (D02)....................................................................................................... RESET ? After 1 min: CAUTION This time delay is necessary to ensure reliable speed information even in icing conditions when the ADIRU is reset to ON. 26 V ADIRU 1 C/B (F07)........................................................................................................ RESET ABN-24 3/4 AQU3I1CK8 R/AEF3E1RE9N/ACE3 H2A0ND/A B3O2OK1 ABNORMAL AND EMERGENCY PROCEDURES 30 AUG 10 A318/A319/A320/A321 FLEET MSN ELEC EMER CONFIG SUMMARY CRUISE MAX SPD.................................................................................................................................. ......... 320 KT ALTN LAW : PROT LOST ONLY CAPT PITOT AND AOA HEATED FUEL: CTR TK UNUSABLE. COM: VHF1, ATC1, RMP1, only NAV: ILS1, VOR1, GPS1 (if MMR is installed) only LANDING CONF APPROACH SPEED Use FLAP 3 VAPP = VREF + 10 kt + APPR COR/140 kt APPROACH MINIMUM RAT SPEED 140 KT CAT 2 INOP SLATS FLAPS SLOW ? When L/G down: USE MAN PITCH TRIM. LANDING FLARE: Only 2 spoilers per wing. Direct law SPOILERS: Only 2 per wing NO?REVERSER BRAKING: ALTERNATE without antiskid MAX BRK PR 1000 PSI NO?NOSEWHEEL?STEERING GO-AROUND NIL ACTUAL LANDING DISTANCES (m) WITH FAILURE WITHOUT REV WEIGHT (1000 KG) 46 50 54 58 62 66 70 74 78 DRY runway 2 180 2 300 2 400 2 490 2 620 2 810 3 090 3 380 3 630 WET runway Refer to FPE-IFL Landing Distance Without AUTOBRAKE - CONF FULL and apply LDG DIST Factor = 2.40 CONTA runway Refer to FPE-IFL Landing Distance Without AUTOBRAKE - CONF FULL and apply LDG DIST Factor = 2.15 CORRECTIONS +1 000 ft above SL +10 kt tailwind DRY Runway +3 % +18 % Refer to ABN-80 VAPP CALCULATION for the approach speed computation method. ABN-24 4/4 AQU3I1CK8 R/AEF3E1RE9N/ACE3 H2A0ND/A B3O2OK1 ABNORMAL AND EMERGENCY PROCEDURES 30 AUG 10 Intentionally left blank A318/A319/A320/A321 FLEET MSN ABN-24 1/4 AQU3I1CK8 R/AEF3E1RE9N/ACE3 H2A0ND/A B3O2OK1 ABNORMAL AND EMERGENCY PROCEDURES 30 AUG 10 A318/A319/A320/A321 FLEET MSN ELEC EMER CONFIG SYS REMAINING ELEC EMER CONFIG SYS REMAINING EMER GEN RUNNING IN FLIGHT BAT ONLOYN THE GROUND PRESS AUTO SYS 1 Norm Norm Norm MAN PRESS CTL Inop Inop Inop (1) RAM AIR Norm Norm Norm PACK VALVE 1 Norm Closure Inop Closure Inop PACK VALVE 2 Closure Inop Closure Inop Closure Inop (1) AVIONIC VENT Norm Norm Partial   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A318/A319/A320/A321QRH快速检查单QUICK REFERENCE HAND BOOK3

原标题:
10 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 曾经的表情包小公举只整这里就变身成为小仙女啦!

      如何平衡品牌风格和个人风格,如何在继承AlexanderMcQueen遗产的同时兼顾商业,至少目前看来,McGirr还有非常多的工作要做。
  • 意媒:朱婷与斯坎迪奇合约到期 获土意三豪门邀约

      “比如你做到下一个里程碑,也许不需要这么多钱,或者你拿多了,其实是预支了未来的筹码。”袁进辉说。
  • 女人必知:这11种旺夫面相特征让男人急着娶

      政策层面,中国的顶层设计对飞行汽车的方向导引愈来愈清晰,不断出台法律法规以及方案举措更具有前瞻性、系统性、连贯性与包容性。除了将北京市延庆区等全国13个地区划定为无人驾驶航空试验基地外,湖南、四川、安徽三省的全域还被圈定为低空飞行的改革试点省份,与此同时南昌被确定为全国低空改革的试点城市。中国交通运输部和科技部联合印发的《交通领域科技创新中长期发展规划纲要(2021—2035年)》中,首次对飞行器与汽车融合进行了部署,工业和信息化部等四部门印发的《绿色航空制造业发展纲要(2023—2035年)》对飞行汽车提出明确时间规划:到2025年,电动通航飞机投入商业应用与试点运行;到2035年,建成具有完整性、先进性、安全性的绿色航空制造体系,新能源航空器成为发展主流;另外,自今年1月1日起,国务院、中央军委发布的《无人驾驶航空器飞行管理暂行条例》正式施行,飞行汽车进入到法规的支持与引领跑道。
  • “反华五人帮”曝光

      要打理好这么庞大的生意,需要百分百的专注与心思,哪还有闲心谈个人问题啊。
  • 期指重回窄幅盘整格局

      (外形在赛时得到了较高认可,好些人看好他演戏,可惜后来给人留下印象的更多是恋情绯闻,一些“跑男”风波什么的……)
  • 波超女排波利采涉险夺5连胜领跑 丁霞替补拦网1分

      如果回到“乱世买黄金”这句古老的格言上,黄金是不是还值得买,就要看你是否觉得当前的世界还会足够“乱”。
  • 央国企料迎价值重估 券商看好投资机会

      家居新时代,是大家居融合发展的时代,消费者需要的完整家居,既要满足家居的科学完整性,又要充分满足每个消费者的个性化、定制化需求,解决新需求,不是简单的靠传统方式的叠加,而是需要全产业链从战略角度研究、创新、融合发展新模式,需要各个品类充分在尊重其他品类的专业性、科学性、发展成果的基础上,制定本行业、本企业的大家居时代发展模式、合作模式、服务模式,而这种新模式的出发点和基础,必须、也只能是客户利益的最大化。
  • 科技毁了世界杯吗?

      修改战利品
  • 泰康人寿重庆分公司315金融消费者权益保护教育宣传 如实告知到底有多重要

      3、公司名称:海安市百俊房地产开发有限公司
  • 残局大师Xyp9x官宣正式离开Astralis

      同年8月,一份报告称,苹果内部认为库克希望继续开发一个更重要的新产品类别,即潜在的增强现实眼镜。但随着AppleVisionPro的推出,这款耳机是否满足这一要求是有争议的。
  • 沪指二季度不宜过度悲观

      与此同时,新浪VR直播间同步上线元宇宙版本,以虚拟数字空间的形式为用户提供沉浸式线上参展体验,该元宇宙空间由新元知浪团队倾力制作。
  • 美国2月核心CPI涨幅超出预期 令美联储面临两难境地

      于是,大模型产业走向垂直化、细分化、专业化,已经成为了未来最重要的趋势之一。
  • 原田胜宏宣布《铁拳 7》销量突破 1000 万

      值得关注的是,除了发布会时间的确定,小米还首次对外公布了小米汽车门店的详细信息。红星新闻记者注意到,首批小米汽车门店覆盖全国29个城市,共计59家门店。从今日起,全国用户均可通过小米汽车官方小程序进行信息登记,预约首批到店品鉴活动,品鉴开启时间为3月25日。
  • 中集集团:子公司中集车辆拟回购全部H股并自愿退市

      作为中国第一家在海外建厂的轮胎企业,公司拥有丰富的海外项目建设及运营经验。本次在印尼建设轮胎生产工厂,可以更好的获取海外市场机会及满足海外市场需求,并通过积极响应下游客户需求,不断增强公司对下游客户的综合吸引力,从而加速带动公司产品产销量的提高。