深夜福利✅_蜜牙13777直接打开-艺文笔记

王金豹 2026年01月26日 02:25:41
发布于:曼谷

深夜福利✅_蜜牙13777直接打开_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

R 1EFF : 159-199, 211-212, 1 27-54-55Page 451 1 1 Aug 01/05 1 1 1CES 1

R  (k) If necessary, drill a 2.5 mm (0.10 in.) hole for the cotter pin  R  (37) in an applicable position on the bearing housing (34).  R  Remove all unwanted material from the area.  R  (l) Safety the ring nut (40) with a new cotter-pin (37).  R  (m) Apply COMMON GREASE (Material No. 04-022) to the bearing surfaces  R  of the lever (28).  R  (n) Turn the lever (28) through 90 deg. and install it in the bearing  R  housing (34).  R  (o) Install the bearing housing (26), the bolt (25) and the nut (44).  R  (p) Apply COMMON GREASE (Material No. 04-022) to the retention plate  R  (35) and to the bolt (27).  R  (q) Install the retention plate (35), the bolt (27) and the nut (39).  R  (r) TORQUE the nut (39) to between 1.4 and 1.5 m.daN (10.32 and 11.06  R  lbf.ft).  R  (s) Manually operate the lever (28) and make sure that it moves  R  freely.  R  (t) Safety the nut (39) with the new cotter pin (38).  R  (u) Remove the adjustable strut.  R  (2) At the track 1 position:  R  (Ref. Fig. 401B/TASK 27-54-55-991-001-C)  R  (a) Connect the lever (10) to the flap link arm (5) as follows:  R  1 Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (6)_  R  and the nut (8).  R  (b) Install the bolt (6), the washer (7) and the nut (8).  R  (3) At the track 2 position:  R  (a) Connect the lever (28) to the flap link arm (32) as follows:  R  1 Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (33)_  R  and to the nut (31).  R  2 Install the bolt (33), the washer (29) and the nut (31)._ 

R 1EFF : 159-199, 211-212, 1 27-54-55Page 452 1 1 Aug 01/05 1 1 1CES 1

R  (4) Do a check of the flap rigged position (Ref. TASK 27-51-00-820-003).  R  (5) At the track 1 position:  R R  (a) TORQUE the nut (8) to between 7.6 and 8.5 m.daN (56.04 and 62.68 lbf.ft) and safety with a new cotter pin (9).  R  (6) At the track 2 position:  R R  (a) TORQUE the nut (31) to between 7.6 and 8.5 m.daN (56.04 and 62.68 lbf.ft) and safety with a new cotter-pin (30).  R  (7) At tracks 1 and 2:  R R  (a) Apply STORAGE PRESERVATION (Material No. 15-007) to the bolts (6) and (33) and the nuts (8) and (31) after assembly.  R R  (8) Install the Flap Track 2 Actuator 6211CM(6261CM) (Ref. TASK 27-54-49-400-002).  R R R  (9) Remove the locking tools LOCK-TORQUE SHAFT (FLAPS AND SLATS) WITH CLAMP-PIVOT from the torque shaft outboard of the track 2 actuator (Ref. TASK 27-50-00-000-003).  R  (10) Remove the hoisting sling (Ref. TASK 27-50-00-000-002).  **ON A/C 301-399,  Subtask 27-54-55-420-053-B  B. Installation of the Flap-Actuator Lever Assembly - Track 1  WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED. 

R 1EFF : 159-199, 211-212, 301-399, 1 27-54-55Page 453 1 1 Aug 01/05 1 1 1CES 1

 (1)  At the track 1 position: R (Ref. Fig. 401C/TASK 27-54-55-991-001-B)

 (a)  Apply COMMON GREASE (Material No. 04-022) to the bearing surfaces of the actuator lever (11).

 (b)  Install the actuator lever (11) into the No.1 flap track beam.

 (c)  Apply COMMON GREASE (Material No. 04-022)to the bearing surfaces of the bearing housing (1).

 (d)  Put the bearing housing (1) in position on the flap track beam.

 (e)  Put the two washers (4) on the two bolts (5). Install the two bolts (5), the two washers (13) and the two nuts (12).

 (f)  Put the five washers (2) on the five bolts (3). Install the five bolts (3), the five washers (15) and the five nuts (14).

 (g)  TORQUE the two nuts (12) to between 2.2 and 2.6 m.daN (16.22 and

 19.17 lbf.ft).  (h)  TORQUE the five nuts (14) to between 1.3 and 1.4 m.daN (115.04 and 123.89 lbf.in).

 (i)  Remove the adjustable strut.

 (j)  Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (7) and the nut (9).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵6

原标题:
87 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 张杰牵手谢娜唱《这就是爱》 互曝夫妻日常甜炸了

      如今长安的最新战略规划则是,到2030年将实现集团销售500万辆,其中长安品牌400万辆,新能源汽车销售占比60%以上。为实现目标,共布局了长安启源、深蓝、阿维塔三大智能电动品牌,打造出大、中、小三个纯电专属平台。
  • 现场直击!善林金融被查封 有投资者百万资金打水漂

      尽管如此,李莉在调研中发现,孩子们还是有多种途径破解“未成年模式”:他们要么使用家长或其他成年人的账号,要么在网上购买账号,或者借用成年人身份证破解账号。对此,她建议,从“人脸识别”等领域,进一步优化“实名注册和防沉迷系统”。通过注册账户、身份证与本人人脸“三合一”精准识别上线者,杜绝未成年人通过使用成年人的账号参与手机游戏。对于未成年人账户,游戏开发商应在游戏时间、游戏规则和竞技模式等方面做精细化分类设计,比如限制“团战模式”参与人数,禁止“同城模式”竞技赛道等,消解组团打手游的空间。
  • 新东方的压力给到了东方甄选

      新征程是充满光荣和梦想的远征。我们一起向前,奋斗、坚定,让那些许过的愿望一路生花。
  • 信用卡赛点:银行业务大爆发收割客户 好景能否持续?

      值得一提的是,今年3月,股票型基金的新发规模相较1月至2月出现了较大的增长,多只A50ETF的首募规模超10亿元。随着这些基金陆续建仓,更多“子弹”将进入A股市场。
  • 皮海洲:新希望再融资凸现再融资新政短板

      “整个戏是每个人好才真正好的,你有没有看过说哪一个主要角色特别好,其他不行,这个戏能成吗?不成。一定是这样的。谁都想演主角,但如果说整个团队不行,整个作品不行,舞台也罢,电影也罢,主角反而暴露了你的缺点,还不如在好的团队好的作品当中做一个配角,或者比较主要的角色,大家一起光彩。没人找你主角,精彩的配角也可以挺好。”
  • 欧冠女排4强出炉土意各占2席 科内伊萨半决赛争锋

      对于2月产销的同环比双降,中汽协会副秘书长陈士华分析指出,2月是春节月,有效工作日减少,且部分购车需求已在春节前得到释放,汽车产销量总体较1月有所回落。
  • 大行评级|大和:下调龙湖集团目标价至10.6港元 短期没有存活问题

      原标题:美媒:美国空军急需重组以应对“新挑战”
  • 理想汽车人事变动!李想直接管销售服务业务,马东辉接替沈亚楠任总裁

      没有长辈,没有领导们的场合之下,一些小露肉小性格的fancy短裙就可以尝试起来了。暗酒红色的灯芯绒面料非常高质感,在抹胸肩颈处涉及的仿动物毛毛领增添一股暖冬来。
  • 鸡蛋严重不耐受可以打流感疫苗么?

      可以预见的是,袁进辉的下一次融资不会太远了,关键在于他选择哪一家或者几家互联网大公司。
  • ECCO 推出HYBRID 720混动防水720系列

      中国选手窦泽成成功晋级,最后一轮打出66杆,四轮277杆(70-70-71-66),低于标准杆11杆,并列位于32位。
  • 彩金贵妃醉酒金币价格今天多少一克(2018年11月06日)

      《报告书》显示,安徽肥西超级工厂规划年产20万辆纯电动(含增程式)乘用车、投资39.805亿元,将开发江淮汽车全新的新能源专属DE平台、华为智能技术赋能的X6平台。
  • 降准是政策的微调而非转向

      近日,东部战区海军航空兵某机场战机列阵、引擎轰鸣。“起飞!”随着指挥员一声令下,多型战机接续升空,一场多课目、多批次跨昼夜飞行训练拉开帷幕。(来源:东部战区)
  • 大豆豆粕库存双双下降

      2024年迄今,英伟达的市值今年已增加近1万亿美元,使其股价远远高于上次拆分股票的数字。一些人士认为,英伟达目前处于非常有利的地位,可以再次拆分股票。
  • 女排意大利杯4强赛揭幕 卫冕冠军科内3

      去年12月,也曾选择提高积存金的交易起点,将此前为450元的存金通2号金额定投购买起点调整为500元,该调整已于今年年初生效。
  • TPP给中国出口带来严峻考验

      商业配套:楼盘5km(直线距离)内有1个购物中心,为万达广场(丰科店),距离楼盘1172米。