糖心logo官网✅_小乔 这次降薪上面意思你带个头 你们组你薪水最多 同事们意见都很大 不利于团结-艺文笔记

王金豹 2026年01月28日 06:23:46
发布于:曼谷

糖心logo官网✅_小乔 这次降薪上面意思你带个头 你们组你薪水最多 同事们意见都很大 不利于团结_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 (b)  With the door in the down position (door closed and locked):

 -make sure that the clearance J11 between the frame structure and the safety pin is 4 -1 +1 mm (0.1574 -0.0393 +0.0393 in.).

 (c)  If the clearances J10 and J11 are not in the tolerances, open the door and adjust as follows:

 1_ Remove the bolt (24), the adjustable washers (25) and (29) and  the caps (26) (27) and (28).  2_ Put new adjustable washers (25) and (29) and install them,  with the caps (26) (27) and (28) and the bolt (24).  3_ TORQUE the bolt (24) to between 0.6 and 0.7 m.daN (53.09 and  61.94 lbf.in).

 (7) Installation of the locking hook (2).  (a) Install the locking hook. 1 Put the door in the up position. _ 2 Apply COMMON GREASE (Material No. 04-004) on the part that _  moves of the shouldered bush (4). 3 Install the shouldered bush (4), the bolt (15), the washer _  (14) and the nut (5). 4 TORQUE the nut (5) to between 1.2 and 1.35 m.daN (106.19 and _  119.46 lbf.in). 5 Install a new cotter pin (6). _ NOTE : If you install a new bolt (15), drill a hole of 2.7 mm ____ (0.1062 in.) for the cotter pin installation.  (b) Connect the rod (48). 1 Install the bellow (50), the plate (51), the bolts (52) and _  the clamp (53). Do not tighten the clamp (53). 2 TORQUE the nuts (49) to between 0.35 and 0.45 m.daN (30.97 and _  39.82 lbf.in). 3 Install the bushes (10) and (11) with SPECIAL MATERIALS _ (Material No. 05-002), the washer (12) and the bolt (13). R 1EFF : 001-049, 051-056, 1 52-11-21Page 459 1 1 May 01/05 1 1 1CES 1

 4_ Install the washer (9) and the nut (8).  5_ TORQUE the nut (8) to between 0.7 and 0.8 m.daN (61.94 and  70.79 lbf.in).  6_ Install a new cotter pin (7).  NOTE : If you install a new bolt (13), drill a hole of 2 mm____  (0.0787 in.) for the cotter pin installation.

 (c) Connect the rod (23). 1 Install the bushes (21) and (22) with SPECIAL MATERIALS _  (Material No. 05-002), the washer (17) and the bolt (16). 2 Install the washer (18) and the nut (29). _ 3 TORQUE the nut (19) to between 0.15 and 0.17 m.daN (13.27 and _  15.04 lbf.in). 4 Install a new cotter pin (20). _ NOTE : If you install a new bolt (16), drill a hole of 1.8 mm ____ (0.0708 in.) for the cotter pin installation.  (8) Adjustment of the locking hook (2). (Ref. Fig. 416/TASK 52-11-21-991-032)  (a)  Open the door.

 (b)  Put two shims in the upper fittings on the frame.

 (c)  Close the door and adjust the locking hook (2) as follows:

 1_ Turn the barrel of the rod (48) until the locking hook (2)  touches the roller (58).  2_ Tighten the nuts (46) and the clamp (53).  3_ Make sure that the lockwashers (47) are correctly positioned.  4_ Safety the nuts (46) and the lockwashers (47) with

 MISCELLANEOUS (Material No. 19-010).  (d) Open the door and remove the shims from the upper fittings (on the frame). R 1EFF : 001-049, 051-056, 1 52-11-21Page 460 1 1 May 01/05 1 1 1CES 1

 Locking Hook Adjustment  Figure 416/TASK 52-11-21-991-032

R 1EFF : 001-049, 051-056, 1 52-11-21Page 461 1 1 May 01/05 1 1 1CES 1R **ON A/C 057-099, 101-149, 151-199, 201-299, 301-399, 401-499,

 Subtask 52-11-21-420-055-A  E. Installation of the Safety Pin and Locking Hook  (Ref. Fig. 407/TASK 52-11-21-991-013)

 (1)  Make sure that the door is in the open position.

 (2)  Connect the rod (33).

 (a)  Install the bushes (34) and (39) with SPECIAL MATERIALS (Material No. 05-002), the rod (33), the washer (32) and the bolt (31).

 (b)  Install the washer (35) and the nut (36).

 (c)  TORQUE the nut (36) to between 0.3 and 0.35 m.daN (26.54 and

 (d)  Install a new cotter pin (37). NOTE : If you install a new bolt (31), drill a hole of 1.9 mm

____ (0.0748 in.) for the cotter pin installation.  (3) Installation of the safety pin on the fitting (56).  (a)  Apply COMMON GREASE (Material No. 04-004) on the part that moves of the safety pin (30).

 (b)  Install the safety pin (30) in its fitting (56).

 (c)  Apply SEALANTS (Material No. 09-019) on the surface of the fitting (56) in contact with the door structure.

 (d)  Put the fitting (56) in position on the door structure and remove the unwanted sealant with CLEANING AGENTS (Material No. 11-004) and MISCELLANEOUS (Material No. 19-003).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM DOORS 舱门2

原标题:
64 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 《喷射战士3》新三款amiibo中文介绍公开!11月发售

      周六,李想在朋友圈说到,“无论多么难,都不能成为【达斯·维达】”。
  • 自动驾驶,是忽悠吗?

      在泾源县大湾乡杨岭村,习近平2016年曾经问过的小男孩,如今已经13岁,上小学六年级。他告诉记者,他们家在2017年已经建了新的浴室,还装上浴霸,洗澡不仅不是问题,而且还更加舒适方便,与城里无异。△习近平2016年曾经问过的小男孩,如今已经13岁,他们家修建了新浴室
  • 新华社:青春无关胜负 成长奠基未来

      为满足印尼当地市场需求及全球化战略布局的需要,公司拟在印尼投资建设“年产360万条子午线轮胎与3.7万吨非公路轮胎项目”,项目投资总额25,144万美元,其中:建设投资20,429万美元、流动资金4,329万美元、建设期利息386万美元。
  • 潮州市城区36条道路完成路树迁移 将补植这些树种

      同时,每道菜旁精心标注营养成分和饮食禁忌提示牌,方便长者根据身体情况选择适合自己的菜品。
  • 金融诈骗套路多 山寨App背后暗藏猫腻

      主界面也点起了南瓜灯,戴上让人开心的面罩,驱走伤心的阴霾,欢迎光临黑夜乐园,暂时忘记一切,尽情享受这里的狂欢。
  • 长期饮茶,可缓解失眠带来的菌群、代谢紊乱

      一位农商行人士表示,美元指数表现、实际利率水平、通货膨胀和避险情绪等,都是影响黄金价格的主要因素,其中最核心的是美元指数和实际利率。近日,美联储降息预期再度升温,带动了金价突破式大涨。如果有意选择积存金,建议等出现一定回调的时候再入手。
  • 近30年黄金走势及近年下跌原因

      JCW版搭载了ALL4智能四驱技术,在全路况均可精确分配动力,可惜这一次的路试没有机会发挥它的实力,希望以后能有机会补上。另外全新MINIJCWCOUNTRYMAN还是首款实现L2级智能驾驶辅助功能的MINI车型,而这也是迄今为止MINI车型上最好用的智能驾驶辅助系统。
  • 午盘:美股涨跌不一 纳指与标普指数创新高后转跌

      新华社斯德哥尔摩3月11日电(记者付一鸣)瑞典斯德哥尔摩国际和平研究所11日发布报告说,过去五年欧洲国家主要武器进口总量与前一个五年相比接近翻番,一半以上的武器进口来自美国。
  • 四年过去了,我们依然没有找到宇宙的黎明

      联合国人权理事会叙利亚问题独立国际调查委员会成立于2011年8月22日,其任务是调查自2011年3月叙利亚冲突爆发以来所有涉嫌违反国际人权法的行为,目前该委员会委任期延长至2024年3月31日。
  • 兴业投资:美联储官员鸽言打击美元 欧元领涨非美

      “毋庸置疑,在新兴领域战略能力建设上还存在着各自为战、条块分割、重复建设的现象”,解放军报评论指出,新兴领域战略能力建设迫切需要坚持问题导向,持续深化改革,统合资源力量。
  • 屠刚:Artily艺术生活空间馆新形象温州首发,回归自然肌理,将环保理念融入艺术生活

      其实,很多AI广告看着吓人又无趣,问题本不在于AI,而是做出来的东西看不到任何想法,更别说打动人,让人有花钱的欲望,只能说明为了AI而用AI,审美差又爱跟风。
  • 血崩!湖人不想打球了 除了詹姆斯都可能走人

      在外界看来,MEGA是否“一炮而红”,对于理想汽车至关重要。去年,理想汽车交付量达37.6万辆,成为国内造车新势力销冠,为此今年李想也制定了冲击80万辆的年销目标。不过,随着今年车市竞争进一步升级,理想汽车的竞争对手们也持续加码。今年前2个月,理想汽车月销量均被AITO问界超越。此外,春节后,开始“掀桌”降价,随后多家车企跟进,车市再度开启价格“热”战,内卷对于理想汽车来说挑战加剧。
  • 宗馥莉除了500亿,也别无选择

      “近年来,我国拔尖创新人才培养取得成效,但也受到一些因素制约。如何形成有利于人才成长的机制和环境、构建多元化多层次的人才培养结构和体系,是新时代建设高质量教育体系必须回答的重要问题。”北京师范大学教授钟秉林说。