天堂岛精品🔇_年下多R车推荐-艺文笔记

王金豹 2026年01月30日 09:24:14
发布于:曼谷

天堂岛精品🔇_年下多R车推荐_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 (Ref. Fig. 401/TASK 71-22-11-991-300) Subtask 71-22-11-020-051  A. Removal of the Aft Engine Mount. NOTE : Removal of the hardware that attach the aft engine mount to the ____  engine is the same at the three engine flanges.

 (1) Remove the retaining pin (5) from the bolt (15).

 (2) Remove the bolts (30), washers (35), (50). and nuts (55) that attach the retainers (60) and (70) to bracket (40).

 (3) Remove the retainers (60) and (70) from engine.

 (4) Remove the spanner nuts (65) and (75) from the bolt (10) and the pin (15).

 (5) Remove the bolt (10) from the pin (15).

 (6) Remove the pin (15), and the brackets (20) and (40) from the engine flange.

 (7) Disengage the link assemblies from the engine flanges and remove the engine mount (85) from the engine.

 (8) Remove the bushing (25), (45), and the shoulder bushing (80) from the engine flanges.

 Subtask 71-22-11-480-052  B. Installation of the AFT ENGINE MOUNT ANTI GOUGE SPLINTS.  (1) Put the top slint assemblies (larger) on the outside of the aft engine mount links.  NOTE : The end of the splint assembly marked TOP must touch the beam ____ assembly. The other end marked BOTTOM must touch the links.  (2) Put the bottom splint (smaller) on the inside of the aft engine mount links.  F 『 EEFF : ALL E Page 40271-22-11  E E Feb 01/98 E E ECES E F 『 E C F M E E E E 56-5B E

 Aft Engine Mount  Figure 401/TASK 71-22-11-991-300

 F 『 EEFF : ALL E Page 40371-22-11  E E Feb 01/98 E E ECES E

 F  『  E  C F M  E  E  E  E  56-5B  E  E  E

 (3) Attach the SPLINT - ENGINE MOUNT AFT (RSE1224) to the engine mount two places with TY WRAP.  (a) Wind the TY WRAP around the splints and the aft mount where the splint touches the beam assembly.

 (b) Wind the TY WRAP around the splints and the aft mount where the splint touches the link.

 (c) Make sure that the TY WRAP is wound very tight and that the splints can not move.

 F 『 EEFF : ALL E Page 40471-22-11  E E Feb 01/98 E E ECES E

 F 『  E C F M E  E E  E 56-5B E  E E

 TASK 71-22-11-400-041  Installation of the Aft Engine Mount  1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  ------------------------------------------------------------------------------- REFERENCE  QTY DESIGNATION  ------------------------------------------------------------------------------- No specific  Torque Wrench : range 8.00 to 75.00 lbf.ft  (1.00 to 10.00 m.daN)  No specific Torque Wrench : range 15.00 to 150.00 lbf.ft

 (2.00 to 20.00 m.daN) R No specific Torque Wrench : range 5.00 to 35.00 lbf.in R (0.05 to 0.40 m.daN)  RSE1098 1 WRENCH SET - AFT ENGINE MOUNT  RSE1224 2 SPLINT - ENGINE MOUNT AFT

 B. Consumable Materials  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION  ------------------------------------------------------------------------------- Material No. CP5063  *  Silicone Lubricant (Ref. 70-30-00)

 C. Referenced Information  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION  ------------------------------------------------------------------------------- 20-21-11-911-001 Tightening Torques for Standard Threaded Fasteners 71-00-00-000-042 Removal of the Power Plant 71-00-00-400-042 Installation of the Power Plant 71-22-11-991-300 Fig. 401  F 『 EEFF : ALL E Page 40571-22-11  E E May 01/05 E E ECES E

 F  『  E  C F M  E  E  E

 3. Job Set-up __________  Subtask 71-22-11-860-050

 A. Make sure that the engine is removed (Ref. TASK 71-00-00-000-042)  Subtask 71-22-11-080-052

 B. Remove the SPLINT - ENGINE MOUNT AFT (RSE1224) from the aft engine mount.  4. Procedure _________  (Ref. Fig. 401/TASK 71-22-11-991-300)  Subtask 71-22-11-420-051

 A. Installation of the Aft Engine Mount. CAUTION : INSTALL THE BUSHING (80) WITH ITS SHOULDER AT THE INTERIOR OF _______  THE ENGINE RANGE.

 NOTE : Installation of the hardware that attach the aft engine mount to   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 动力装置 POWER PLANT 2

原标题:
48 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 苏州龙杰核心工艺将被淘汰?最大客户上法院失信黑榜

      在整体桥梁的设计上,港珠澳大桥主体桥梁大量采用预制钢结构建造,总用钢量达42万吨,这些钢材足以建造十座鸟巢。精湛的施工工艺,让大桥使用寿命长达120年,比目前世界上的跨海大桥普遍的设计使用寿命再提高20年,成为世界桥梁建设新的标杆。
  • 任泽平:当前人民币面临四大支撑和四大压力

      与此同时,日前,农业农村部出台《生猪产能调控实施方案(2024年修订)》,将全国能繁母猪正常保有量目标从4100万头调整为3900万头,将能繁母猪存栏量正常波动(绿色区域)下限从正常保有量的95%调整至92%。
  • iShares白银ETF11月13日白银持有量与上一交易日减少10.23吨

      不论是品牌知名度、门店数,还是营收,海底捞都是火锅界的“一哥”,2023年预计净利润不低于44亿元,较2019年增长71.8%,远超疫情前水平,创历史新高。形势一片大好,海底捞为何突然选择了加盟这条路?
  • 建设银行深圳分行又一干部被查,一年来已有多名干部落马

      想要了解最新的AI动向吗?NVIDIA创始人兼首席执行官黄仁勋将在北京时间3月19日(星期二)上午4:00在美国加州圣何塞SAP中心发表GTC2024主题演讲,届时线上也将同步直播。黄仁勋将面向全球观众,分享塑造未来的AI突破!
  • 日男排联赛广岛JT险胜名古屋 江川19分王东宸11分

      开源证券表示,低空空域有望陆续全面放开。2023年峰飞航空、沃兰特航空等多家公司已发布代表eVTOL产品,进入试飞测试和适航取证阶段。2024年政策产业共振,有望成为低空经济元年,后续载人客运市场应用场景打开有望为eVTOL市场提速。股市回暖,抄底炒股先开户!智能定投、条件单、个股雷达……送给你新浪声明:此消息系转载自新浪合作媒体,新浪网登载此文出于传递更多信息之目的,并不意味着赞同其观点或证实其描述。文章内容仅供参考,不构成投资建议。投资者据此操作,风险自担。海量资讯、精准解读,尽在新浪财经APP
  • 孩子和老公,只能选一个,你选谁?她的答案赢得整个家庭的幸福!

      就在刚刚,吓死我了,就在我身边发生的一件事。
  • 任泽平:美国加息后 中国央行或结构性加息

      Matejka在研报中写道:“人们对七巨头的强劲表现感到担忧。但我们注意到,在发布业绩之后,这些股票目前的交易不像几年前那么紧张了。这并不是说这些公司对未来不会出现获利令人失望的情况,但在整体盈利状况欠佳的情况下,这些股票可能仍然比传统的周期性股票表现更好。“
  • 定位精致与豪华 领克07 EM

      大胆的穿搭能组合出想象不到的美感来,同时也能根据裤子的不同款式创造出不止一板一眼的“潮”味。
  • 今年高考会不会推迟?教育部回应

      另外,记者了解到,一般赴港开户需要提供的材料为身份证、港澳通行证、护照、通关小票、住址证明,若办理香港账户,需要先存入1000港元进行账户激活,激活后再存入资金。另外,开户还需要提前预约。
  • 汪涵杨乐乐结婚12周年:好的婚姻,都有一个大格局的丈夫

      “我们始终相信市场机制对于定价以及竞争格局的重塑作用:物竞天择、适者生存。在加速进化阶段的竞争烈度必然加速,进而使那些具备更强能力的车企脱颖而出。”麦肯锡全球董事合伙人、麦肯锡中国区汽车咨询业务负责人管鸣宇表示。
  • 维密关闭北京王府井大街全球旗舰店

      注:赛轮香港、赛轮新加坡尚有增资手续正在办理中。
  • 去通胀压力将促再次降息

      作为理想汽车旗下的首款MPV及纯电车型,MEGA仅有55.98万元一个版本,不过李想坚信这款车型将成为公司的下一个热销产品,并有决心在50万元以上的市场中夺取销量第一的地位,挑战单月8000辆的惊人销量。
  • 三星电子第三季度晶圆代工全球市占率15.5%

      “最近黄金真的太火了,通过积存金兑换实物金也比较紧俏,尤其是10克这样的小克重金条,有的网点已经断货,今天就有一家支行来找我们支行调货。”北京市西城区一家支行客户经理表示。
  • 稳增长措施难以扭转下行趋势

      1-2月,我国汽车产销累计完成391.9万辆和402.6万辆,同比分别增长8.1%和11.1%,这其中,乘用车和商用车继续保持平稳运行,新能源汽车和汽车出口延续良好表现。
  • 看电视太久更易得冠心病?关键和这一行为有关

      近日,东部战区海军航空兵某机场战机列阵、引擎轰鸣。“起飞!”随着指挥员一声令下,多型战机接续升空,一场多课目、多批次跨昼夜飞行训练拉开帷幕。(来源:东部战区)