深夜福利✅_叶渺渺上体育课课被捅了一节-艺文笔记

王金豹 2026年01月24日 00:08:33
发布于:曼谷

深夜福利✅_叶渺渺上体育课课被捅了一节_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 AIRBORNE AUXILIARY POWER - GENERAL ((GTCP 36-300)) - FAULT ISOLATION PROCEDURES _______________________________________________________________________________ R **ON A/C 001-003, 051-099, 401-499,  TASK 49-00-00-810-801  APU AUTO SHUT DOWN - Slow Start Shutdown, Main Start Contactor Fault (GTCP  36-300)  1. Possible Causes _______________  - CONTACTOR-MAIN START (5KA)

 - the BAT 1 and 2 pushbutton switches are selected OFF

 2. Job Set-up Information ______________________  A. Referenced Information  ------------------------------------------------------------------------------- REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 49-00-00-710-004 Operational Test of the APU (4005KM) (GTCP 36-300)  AMM 49-42-55-000-001 Removal of the Start Contactors (5KA,10KA)  AMM 49-42-55-400-001 Installation of the Start Contactors (5KA,10KA)  AMM 49-61-34-000-001 Removal of the Electronic Control Box (ECB) (59KD)

 (GTCP 36-300) AMM 49-61-34-400-001 Installation of the Electronic Control Box (ECB) (59KD) (GTCP 36-300) ASM 49-42/01  3. Fault Confirmation __________________  **ON A/C 001-003, 051-062,  A. Check/Test  NOTE : Make sure that the Battery Charge Limiters 1PB1 and 1PB2 are ____ available. If not, do the related trouble shooting.  (1) Before you start the operational test, make sure that:  - on the overhead panel 35VU, the BAT 1 and BAT 2 pushbutton switches are in the on position (the OFF legends are off). If the BAT 1 and2 pushbutton switches are selected OFF, the APU start contactor 5KA is disconnected from the power supply,  - the Ram Air Turbine is in the retracted position.  (2) Do the operational test of the APU (Ref. AMM TASK 49-00-00-710-004).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 001-003, 051-099, 401-499, ∞∞49-00-00∞∞∞∞∞∞∞∞∞∞Page 201  Config-1 Aug 01/05 CES

R **ON A/C 063-099, 401-499,

 A. Do the operational test of the APU (Ref. AMM TASK 49-00-00-710-004). R **ON A/C 001-003, 051-099, 401-499,  4. Fault Isolation _______________  **ON A/C 001-003, 051-062,  A. If an APU auto shutdown occurs during the APU start sequence and the APU SHUTDOWNS report gives maintenance message:  START TIME EXCEEDED - CONTACTOR 5KA:  - replace the CONTACTOR-MAIN START (5KA) (Ref. AMM TASK 49-42-55-000-001) and (Ref. AMM TASK 49-42-55-400-001).  (1) If the fault continues:  - do a check for a ground signal at the START CONTACTOR (5KA) B/5.  (a) If there is no ground signal:

 - do a check and repair the wiring from the START CONTACTOR (5KA) B/5 to the ground (Ref. ASM 49-42/01).

 (b) If there is a ground signal:

 - do a check and repair of the wiring from the ECB (59KD) AC/1 to the MAIN START CONTACTOR (5KA) B/3 (Ref. ASM 49-42/01).

 - do a check and repair of the wiring from the BACK-UP START CONTACTOR (10KA) A/F to the MAIN START CONTACTOR (5KA) A/D (Ref. ASM 49-42/01).

 - do a check and repair of the wiring from the ECB (59KD) AB/J10 to the STARTER MOTOR (8KA) positive terminal (Ref. ASM 49-42/01).

 1 If the fault continues: _

 - replace the ECB (59KD) (Ref. AMM TASK 49-61-34-000-001) and (Ref. AMM TASK 49-61-34-400-001). R **ON A/C 063-099, 401-499,  A. Maintenance Action  (1) If an APU auto shutdown occurs during the APU start sequence and the APU SHUTDOWNS report gives maintenance message:  NO ACCELERATION - ACFT BAT NOT SELECTED/CONTACTOR 5KA:  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 001-003, 051-099, 401-499, ∞∞49-00-00∞∞∞∞∞∞∞∞∞∞Page 202  Config-1 Aug 01/05 CES with the LRU TROUBLE SHOOT DATA menu information MAIN START CONTACTOR SHOWS OPEN CIRCUIT Fault Code Number: 123

 - do a check and repair of the wiring from the ECB (59KD) AB/J10 to the STARTER MOTOR (8KA) positive terminal (Ref. ASM 49-42/01).

 - do a check and repair the wiring from the START CONTACTOR (5KA) B/5 to the ground (Ref. ASM 49-42/01).

 (a) If the fault continues:  - replace the CONTACTOR-MAIN START (5KA) (Ref. AMM TASK 49-42-55-000-001) and (Ref. AMM TASK 49-42-55-400-001).  1 If the fault continues: _

 - replace the ECB (59KD) (Ref. AMM TASK 49-61-34-000-001) and (Ref. AMM TASK 49-61-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 机载辅助动力 1

原标题:
51 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 午盘:美股继续上扬科技股领涨 英伟达突破900美元创历史新高

      巨大的商业前景吸引着越来越多的力量进入飞行汽车赛道,并最终集结与分离成了三大竞争矩阵。第一大矩阵是以吉利、广汽为龙头的传统汽车制造商,双方产品的首次试飞均取得成功,AE200还获得相关航空公司的100架采购订单;第二大矩阵是以小鹏汇天为代表的造车新锐,除了分体式飞行汽车“陆地航母”去年斩获了100架订单外,小鹏汇天自主研发的两座载人飞行汽车“旅航者X2”也正式拿到了中国民用航空管理局颁发的特许飞行证;第三大矩阵是峰飞航空、亿航智能等为代表的国内初创公司,其中“盛世龙”截至目前的采购订单数达到370架,而亿航智能自主研发的EH216—S飞行汽车不仅获得中国民航局正式颁发的型号合格证,而且成型飞机已在广州和合肥两地完成商业首飞。
  • 职业队冠名权益之争:规范是出路 三点请求遭拒

      春节假期过后的2月18日,高合的大部分员工收到了“停工停产6个月”的通知,以及“工资迟发,后续只发放2000多元基本工资”的消息,后来,大部分员工的工卡被禁止进入办公楼。
  • 成熟风姐系美女就是要支棱起来 !比如王楚然关晓彤

      如果站在海洋标志号的船底,那既可以亲眼见到人工业制造成果的壮伟,也会在巨物的压迫感下,感受到自身的渺小。
  • 网友直呼“刺激”!比特币站上7.1万美元,市值超白银……凭啥这么“疯狂”?

      根据江淮汽车产销预测,未来五年,江淮乘用车销量将超50万辆。
  • 北京——阳光城梵悦108丨楼盘测评

      此外,还需统筹校内外资源。辛兵介绍,中国科协青少年科技中心联合中国青少年科技教育工作者协会,组织实施“‘科创筑梦’助力‘双减’科普行动”,开展了一系列活动,多渠道为中小学提供高质量科普服务。下一步,还将发展壮大专家队伍,汇聚线上线下优质科教资源,开展科技辅导员培训等。
  • 人民币国际化前景光明

      可惜的是,原雷牙让山佛塔毁于1942年抗战时期,而芒市市区的勐焕大金塔也毁于1966年。当地决定将两塔合一重建,定名为勐焕大金塔。
  • 上半年 这些科学新成果或改变你我生活

      分析师表示,如今的效率/生产力主题(人工智能、自动化)正处于萌芽阶段,就像90年代中期的个人电脑革命一样。而到了1999年,科技股是根据价格来估值的,而今天,TMT(科技、媒体、电信)的盈利贡献和资本纪律与1995年的“漂亮50”(Nifty50,指上世纪六七十年代在纽约证券交易所交易的50只备受追捧的大盘股)相似。
  • 广东潮州市3名小孩失踪,官方通报

      24小时滚动播报最新的财经资讯和视频,更多粉丝福利扫描二维码关注(sinafinance)
  • 明明有好好吃药,为什么血压还是控制不住?

      第一种,是天生幸运,在成长过程中得到过足够丰盛的爱,具备较高的自我价值感。当然,这也是可遇不可求的。
  • 前女友or私房钱 男人婚后都有的4个秘密

      从一无所有白手起家,采集资源,规划设计生产线,逐步实现全自动化,将你的工厂从一个小作坊,发展成为庞大的跨星系工业帝国。探索未知的星球,发现珍奇,让你的足迹遍布星辰大海。新浪声明:新浪网登载此文出于传递更多信息之目的,并不意味着赞同其观点或证实其描述。
  • 互联网金融需要准确的定义和定位

      四、中介机构核查意见
  • 任泽平:树一杆多头的大旗 A股纳入MSCI再添利好

      高质量发展夯实中国式现代化之基。高质量发展的核心在于经济高质量发展,促使经济增长动力机制从要素驱动转向创新驱动,构建现代产业体系,培育经济新增长点。近十年来,我国贯彻新发展理念、构建新发展格局,经济总量不断壮大,占全球经济比重从2012年的11.4%升至18%以上,2022年,我国经济总量突破120万亿元,再上新台阶;我国经济对世界经济增长的贡献总体上保持在30%左右,成为世界经济增长的主要动力源和稳定器。不仅如此,随着新产业新业态新模式蓬勃发展,我国产业结构日益优化。据国家统计局数据,2022年新能源汽车、移动通信基站设备、工业控制计算机及系统等领域产量分别增长97.5%、16.3%、15.0%,为经济增长注入新动力。