深夜福利✅_良家妇女释义-艺文笔记

王金豹 2026年01月19日 05:53:08
发布于:曼谷

深夜福利✅_良家妇女释义_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

R TASK 24-22-00-810-823 R Failure of the GLC 1 or Loss of its Status Indication R 1. Possible Causes _______________ R - GCU-1 (1XU1) R - RELAY (20XU) R - GLC-1 (9XU1) R - wiring R 2. Job Set-up Information ______________________ R A. Referenced Information R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R ------------------------------------------------------------------------------- R AMM 24-22-34-000-001 R AMM 24-22-34-400-001 R AMM 24-22-55-000-001 R AMM 24-22-55-400-002 R R AMM 24-41-00-740-002 R ASM 24-22/02 R 3. Fault Confirmation __________________ R A. Test Removal of the GCU-1(2) (1XU1, 1XU2) Installation of the GCU-1(2) (1XU1, 1XU2) Removal of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Installation of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Operational Check of GAPCU via CFDS

R (1) Do the BITE test of the GAPCU (Ref. AMM TASK 24-41-00-740-002).

R (a) If the BITE test gives the message TEST FAILED: R - do the trouble shooting given in Para 4.A. R (b) If the BITE test gives the message TEST PASSED:

R - do the trouble shooting given in Para 4.B. R 4. Fault Isolation _______________ R A. If the BITE test gives the message TEST FAILED: R - push the line key adjacent to the TEST FAILED message.

R (1) If the maintenance message GCU1 (1XU1) comes into view: R - replace the GCU-1 (1XU1) (Ref. AMM TASK 24-22-34-000-001) and (Ref. R AMM TASK 24-22-34-400-001).

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : 401-499, ∞∞24-22-00∞∞∞∞∞∞∞∞∞∞Page 265  Aug 01/05 CES

R  B. If the BITE test gives the message TEST PASSED:  R  - do a check of the wiring (Ref. ASM 24-22/02) for an open circuit  R  between:  R  . pin 2 of the ELEC/GCU1 circuit breaker (2XU1) and pin A/B of the  R  function relay (20XU)  R  . pin A/3 of the function relay and pin B/18 of the GLC 1 (9XU1)  R  . pin B/20 of the GLC 1 and pin A/29 of the diode module module 2420VD  R  . pin A/14 of the diode module 2420VD and pin A/6A of the GCU 1.  R  - do a check of the contacts for correct operation of the function relay  R  (20XU) and the GLC 1 (9XU1) (Ref. ASM 24-22/02) between:  R  . pins A/B and A/3 of the function relay (normally closed)  R  . pins B/18 and B/20 of the GLC 1 (normally closed).  R  (1) If the wiring or the contacts are not correct:  R  - repair or replace the wiring as necessary  R  - replace the RELAY (20XU) as necessary  R  - replace the GLC-1 (9XU1) (Ref. AMM TASK 24-22-55-000-001) and (Ref.  R  AMM TASK 24-22-55-400-002) as necessary.  R  (2) If the wiring or the contacts are correct:  R  - replace the GCU-1 (1XU1) (Ref. AMM TASK 24-22-34-000-001) and (Ref.  R  AMM TASK 24-22-34-400-001).  R  C. Do the test given in para. 3.

R TASK 24-22-00-810-824

R Failure of the GLC 2 or Loss of its Status Indication R 1. Possible Causes _______________ R - GCU-2 (1XU2) R - GLC-2 (9XU2) R - wiring R 2. Job Set-up Information ______________________ R A. Referenced Information R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R ------------------------------------------------------------------------------- R AMM 24-22-34-000-001 R AMM 24-22-34-400-001 R AMM 24-22-55-000-001 R AMM 24-22-55-400-002 R R AMM 24-41-00-740-002 R ASM 24-22/03 R 3. Fault Confirmation __________________ R A. Test Removal of the GCU-1(2) (1XU1, 1XU2) Installation of the GCU-1(2) (1XU1, 1XU2) Removal of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Installation of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Operational Check of GAPCU via CFDS

R (1) Do the BITE test of the GAPCU (Ref. AMM TASK 24-41-00-740-002).

R (a) If the BITE test gives the message TEST FAILED: R - do the trouble shooting given in Para 4.A. R (b) If the BITE test gives the message TEST PASSED:

R - do the trouble shooting given in Para 4.B. R 4. Fault Isolation _______________ R A. If the BITE test gives the message TEST FAILED: R - push the line key adjacent to the TEST FAILED message.

R (1) If the maintenance message GCU2 (1XU2) comes into view: R - replace the GCU-2 (1XU2) (Ref. AMM TASK 24-22-34-000-001) and (Ref. R AMM TASK 24-22-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 电源 3

原标题:
16 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 美国费城发生大规模枪案:8名高中生受伤 枪手仍在逃

      更何况,乔布斯当时的身体已经每况愈下。五个月之后,出席苹果全球开发者大会的乔布斯就已经变得十分消瘦。再之后不久,其病情恶化的消息就开始见诸报端。
  • A股站上3100点:大机构豪言第三浪冒头 两板块将主导

      空调控制区域则全面放在了中控屏之内,界面排布清晰操作挺方便,试驾车配备双区域自动空调,车规级CN95高效空调滤芯,此外空气质量监测系统和负离子系统也有配备。
  • 乘着高铁去香格里拉 再见我心中的日月城

      活跃的自由基在我们体内起到传输运送能量的作用,但是当体内自由基过多时,它就会攻击正常的细胞,破坏胶原蛋白、弹性蛋白、促进黑色素分泌,导致皮肤变得暗黄、失去弹性。
  • 建信期货:股指期货市场交易者分为三大类

      这背后,险资入市面临一些挑战。屈放进一步表示,影响险资配置的主要因素有宏观因素,包括政策和监管的调整、产业发展走向和社会经济结果,也包括险资企业自身的资产负债情况以及偿付能力等,还包括权益市场产品端的改善,包括中长期投资品种等。
  • 透视美国政治经济周期:特朗普经济学能有效吗

      (小风)声明:新浪网独家稿件,未经授权禁止转载!
  • 国企改革方案不容忽视的亮点

      5、项目总投资:项目投资总额25,144万美元,其中:建设投资20,429万美元、流动资金4,329万美元、建设期利息386万美元。本项目所需资金将由公司自有资金及自筹资金解决。
  • 快讯:黎军任东莞市副市长 邓涛任东莞市政府秘书长

      一位长期关注生物医药行业人士告诉财经·大健康,CRO为创新药等行业提供服务,也就难免依赖于此,创新药火,CRO就火。反之,创新药行业有多低迷,那CRO也就会遭遇这种低迷,“双方可以说共生共赢,甚至是被动的一个产业形态”。
  • 日本上调去年第四季度经济增速

      实际上,江淮与华为的合作缘来已久。早在2019年底,双方签署了全面合作框架协议暨MDC平台项目合作协议,在智能驾驶、智能座舱、智能电动、智能网联和云服务等方面进行深入合作。
  • 穆罕默德·艾利安:通胀如何卷土重来

      从第一款量产的折叠屏发布到今天,已经过去了五年多的时间。这五年的时间里,折叠屏的玩家从三星、华为扩充到现在的小米、OPPO、vivo、荣耀等,两位数的增速,在下滑的手机大盘市场中也成为一股“清流”。
  • 买建材家具·中30万免单,万家丽家装建材博览会火热进行中

      机构:成长资金高切低或带来核心资产反弹行情
  • 刘慈欣:宣布加盟商汤,双方将打造三体沉浸式娱乐新业态

      从新房、存量房装修市场空间与潜力来看,中国家装市场相对稳定,开发潜力可持续且巨大。
  • 在老人眼里,孙子和外孙有什么不同?

      党的十八大以来,我国城乡、区域协调发展迈出坚实步伐,高质量发展动能强劲。习近平总书记强调:“要全面推进城乡、区域协调发展,提高国内大循环的覆盖面。”现代化建设进程必然伴随着城乡区域结构的深刻调整,这也是释放巨大需求、创造巨大供给的过程。当前我国居民消费提质扩容潜力巨大,补短板锻长板投资需求旺盛,在此基础上推进新型城镇化和区域协调发展有利于进一步拓宽国内市场空间,激发市场活力,引领创造更多市场需求。坚持全国一盘棋,把扩大内需战略和新型城镇化战略有序衔接起来,深入实施区域协调发展战略,方能更好增强发展的整体性、协调性,增强我国的生存力、竞争力、发展力、持续力。
  • 多家险资万科总部进行新一轮磋商 商谈希望不要提前行权

      3月8日,就超聚变借壳上市事宜,河南省财政厅旗下城发环境在互动平台回应投资者称,所述事宜与公司无关。3月11日,、等多家河南省财政厅旗下的上市公司继续被投资者在互动平台追问“是否参与超聚变借壳上市”。
  • 净利与质量双伤 球冠电缆IPO前途未卜

      受这些鲜活例子引导,企业高管们纷纷入驻微博,这种现象在去年达到顶峰,微博生态的良性扩张,自然引来普通网友关注,企业、大V云集,他们又共同扩张了社媒边界。其结果是微博生态成长的自循环体系,逐步建立起来。
  • 中信银行涉56项违规收2.25亿罚单 不良率1.22%损失类贷款新增122亿

      隶属于是沙特国家主权财富基金PIF下属的SELA体育,是这次“KO大乱斗-约书亚VS纳干诺”之战的实际出资方。