天堂岛精品🔇_精品网-艺文笔记

王金豹 2026年01月28日 06:31:37
发布于:曼谷

天堂岛精品🔇_精品网_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

1. ELECTRICAL (CONT'D) H. APU Generator Failure Indication: APU GEN OFF caution message on. (1) AC POWER, APU GEN switch.............................Select to OFF/RESET then ON. APU GEN OFF caution message persists: Yes (2) AC POWER, APU GEN switch............................................................Select to OFF. (3) Affected airplane systems .......................... Review − END − No (2) AC ELECTRICAL page ......................................Monitor loads on APU generator. END I. APU Generator Overload Indication: APU GEN OVLD caution message on. AC ELECTRICAL page – APU generator load readout is greater than 35 KVA. (1) AC ELECTRICAL page ......................................Monitor load on APU generator. (2) AC loads............................................................ Reduce as necessary. END J. Battery Bus Failure Indication: BATTERY BUS caution message on. (1) Land at the nearest suitable airport. (2) Affected airplane systems .................................. Review END ABNORMAL PROCEDURES Electrical 05−09−4 REV 71, Oct 31/07 DOT Approved CL−604 Airplane Flight Manual PSP 604−1 1. ELECTRICAL (CONT'D) K. DC BUS 1 Failure Indication: DC BUS 1 caution message on. DC ELECTRICAL page – DC BUS 1 inoperative. (1) DC POWER, MAIN BUS TIE switch/light .........................................................Press in to close bus tie manually. Check MAIN BUS TIE CLOSED light on. DC BUS 1 caution message persists: Yes (2) Affected airplane systems .......................... Review − END − No (2) No further action required. END L. DC BUS 2 Failure Indication: DC BUS 2 caution message on. DC ELECTRICAL page – DC BUS 2 inoperative. (1) DC POWER, MAIN BUS TIE switch/light .........................................................Press in to close bus tie manually. Check MAIN BUS TIE CLOSED light on. DC BUS 2 caution message persists: Yes (2) Affected airplane systems .......................... Review − END − No (2) No further action required. END M. DC Essential Bus Failure Indication: DC ESS BUS caution message on. DC ELECTRICAL page − DC ESS BUS inoperative. (1) Land at the nearest suitable airport. (2) Affected airplane systems .................................. Review END ABNORMAL PROCEDURES Electrical 05−09−5 REV 66, Feb 01/07 DOT Approved CL−604 Airplane Flight Manual PSP 604−1 1. ELECTRICAL (CONT'D) N. AC Generator 1 Failure Indication: GEN 1 OFF caution message on. (1) AC POWER, GEN 1 switch ..................................Select to OFF/RESET then ON. GEN 1 OFF caution message persists: Yes (2) AC POWER, GEN 1 switch ..........................Select to OFF. NOTE 1. With generator 1 shutdown, HYD PUMP 2B is load shed. 2. During single generator operations, AC utility busses are shed, unless on ground with flaps at 0°. (3) APU (if available)............................................ Start when at or below 20,000 feet. On airplanes 5301 to 5630 NOT incorporating Service Bulletin 604–49–006 or 604–49–009: (3) APU (if available)............................................ Start when at or below 15,000 feet. On airplanes 5301 to 5630 NOT incorporating Service Bulletin 604–49–006 or 604–49–009: CAUTION Use of the APU generator in flight is not permitted unless both main generators have failed or are off-line. (4) AC POWER, APU GEN switch............................................................Select to ON. − END − No (2) AC ELECTRICAL page ......................................Monitor voltage, load and frequency readouts on all generators. END ABNORMAL PROCEDURES Electrical 05−09−6 REV 71, Oct 31/07 DOT Approved CL−604 Airplane Flight Manual PSP 604−1 1. ELECTRICAL (CONT'D) O. AC Generator 2 Failure Indication: GEN 2 OFF caution message on. (1) AC POWER, GEN 2 switch ..................................Select to OFF/RESET then ON. GEN 2 OFF caution message persists: Yes (2) AC POWER, GEN 2 switch ..........................Select to OFF. NOTE 1. With generator 2 shutdown, HYD PUMP 1B is load shed. 2. During single generator operations, AC utility busses are shed, unless on ground with flaps at 0°.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:庞巴迪挑战者604飞机飞行手册CL604 Airplane Flight Manual 2

原标题:
67 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 减龄优雅又高级 奶油蓝单品初夏不能少

      因背后资金来源无法穿透,相关席位的提前加仓或与摩根士丹利的研报并无关联。事实上,、及等境内研究机构近期研报也均看好宁德时代。其中,中金公司维持宁德时代“跑赢行业”评级,认为其在产业链中确定性较强,有望穿越周期。
  • 上海中期期货:铁矿石表现坚挺 逢低买入

      这份文件是OpenAI针对马斯克今年2月起诉该公司、首席执行官萨姆·奥特曼(SamAltman)及总裁格雷格·布罗克曼(GregBrockman)的首次法律回应。马斯克控诉该公司背离了旨在构建“负责任人工智能”的创始理念,并对其最大投资方微软表现出过分的依赖。
  • 地铁十一号线新进展 广州火车站下月起围蔽施工五年

      目前,该游戏已经可以在MetaQuest商店预购,预购玩家可以获得一顶MiniCrewmate帽子作为预购奖励。
  • 白银投资新手应该知道的11条忠告

      尼克斯方面,布伦森22中6得到全场最高的19分,迪文琴佐17中6得到15分9篮板3助攻2抢断,博格达诺维奇10分。
  • 玄奘大师略传(图)

      针对一些游戏开发商利用大数据对未成年人在游戏过程中专门设计的“上瘾”环节,李莉认为,相关部门应进行有效识别,叫停游戏软件开发公司对少年儿童的“成瘾设计”,堵住“未成年模式”破解漏洞。
  • 国务院新组建直属机构首任局长,亮相全国两会记者会

      2015年,IDG领投了SheIn3亿元的B轮融资,此番重注让IDG手中握有极多筹码。若如市场传闻所言SheIn即将在美IPO,那么这笔近年来规模最大的IPO将为IDG带来百亿美元级别的账面回报。
  • I人才懂的北欧浪漫

      春节假期,山东泰安市东平县大宋不夜城景区灯火璀璨,烟花秀、非遗打铁花、龙狮迎新春等活动精彩纷呈。大年初一当天,大宋不夜城接待游客7.76万人次,实现旅游收入148.43万元。济南市长清区围绕2024春节山东乡村文化旅游节,策划举办了新年祈福会、新春美食节及非遗集市等特色文旅活动,吸引众多市民和游客前来游玩。
  • 收获国内外玩家一致认可后,“CN瓦”的故事或许才刚刚开始

      2022年1月19日,字节跳动被曝出整体裁撤投资业务。在此之前,战略投资被认为是互联网公司突破业务天花板、拓展版图最为重要的手段。然而,随着2021年“反垄断”向互联网行业开出数十张罚单,监管信号愈发明晰,互联网巨头们也不得不寻找新的发展路径。字节先人一步解散战投部,以壮士断腕之姿走进一场全新游戏。
  • 雕塑手术,凹凸不平和松弛真的无可避免?

      安信证券曾在报告中测算过单套快递柜成本和收入模型,单套快递柜一年的成本约为16788元,在设置“消费者支付超时费收入”情况下,一年单套快递柜的收入达17800元,实现6%的毛利率,毛利润为1012元。其中,快递员投柜的费用贡献了50%的收入。
  • 调整存款准备金率一箭双雕

      针对人们诟病的主要内阁成员在脱欧问题上立场分歧多多,特雷莎·梅肯定现任政府内阁成员的团结和努力,表示,现政府会凝聚共识、履行职责、实现承诺。就人们最关心的脱欧谈判,特雷莎·梅说,处理好脱欧谈判是她的政府首要责任,她向居住在英国的300万欧盟移民承诺:即将签订的协议将保障他们在英国合法居留的权利。喜剧演员递给特雷莎梅的解聘书
  • 消息面对金银价格有何影响

      中国是个人情社会,一个经销商能够独霸某一个区域内的生意往来,除了拥有超强的个人能力和商业手腕之外,在当地一定也有稳定的政商关系。
  • 排超男排挑战赛福建和江苏齐奏凯 锁定8强最后2席

      根植于白族扎染之乡周城,致力发展和传承白族扎染手工艺。根据四季变化,采用古法植物取色,整理扎染白族纹样故事,与族人探索扎染创作来源和文化的链接,向大众提供了解、体验和学习扎染的空间,让当地年轻人感受扎染的价值。于此期间,蓝续的公益组织­——大理蓝续绿色文化发展中心,帮助当地村民学习扎染技术,培养了大批扎染教师等,坚持为云南传统文化的传承发光发热。