在线看免费❗_秘密教学70话好像可以照我的-艺文笔记

王金豹 2026年01月24日 14:38:48
发布于:曼谷

在线看免费❗_秘密教学70话好像可以照我的_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

TASK 27-00-00-810-801  Display of an Operational Warning on the Upper ECAM DU

 1. Possible Causes _______________  - Message on the Post Flight Report (PFR)  2. Job Set-up Information

______________________  Not Applicable

 3. Fault Confirmation

__________________  A. Test  Not applicable, no confirmation test is necessary.

 4. Fault Isolation _______________  A. Do a check for a Message on the Post Flight Report (PFR).  If there is no message, no action is necessary. R If there is a message, do the trouble shooting procedure related to the R maintenance message.  NOTE : Some operational Warnings are not printed on the PFR. ____

 AILERON - FAULT ISOLATION PROCEDURES ____________________________________  TASK 27-10-00-810-801  Loss of Signal on the Left Pedals for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - XDCR UNIT-PEDAL POS, L (25CE1)

 - wiring from the ELAC 1 (2CE1) to the transducer unit (25CE1)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation AMM 27-92-15-000-001 Removal of the Pedal Position Transducer Unit (25CE1,25CE2) AMM 27-92-15-400-001 Installation of the Pedal Position Transducer Unit  (25CE1,25CE2)  AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)

R  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-92/23  3. Fault Confirmation __________________  A. Test  (1) Do the operational test of the rudder hydraulic actuation (Ref. AMM TASK 27-24-00-710-001).

 (2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).

 4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR INPUT OF L PEDALS XDCR UNIT 25CE1

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - replace the XDCR UNIT-PEDAL POS, L (25CE1), (Ref. AMM TASK 27-92-15-000-001) and (Ref. AMM TASK 27-92-15-400-001).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-10-00∞∞∞∞∞∞∞∞∞∞Page 201  May 01/00 CES (2) If the fault continues:

 - do a check and repair the wiring from the ELAC 1 (2CE1) to the transducer unit (25CE1) (Ref. ASM 27-92/23).  B. Do the operational test and the BITE test given in Para. 3.

 Loss of Signal on the Right Pedals for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - XDCR UNIT-PEDAL POS, R (25CE2)

 - wiring from the ELAC 1 (2CE1) to the transducer unit (25CE2)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation AMM 27-92-15-000-001 Removal of the Pedal Position Transducer Unit (25CE1,25CE2) AMM 27-92-15-400-001 Installation of the Pedal Position Transducer Unit  (25CE1,25CE2)  AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)

R  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-92/23  3. Fault Confirmation __________________  A. Test  (1) Do the operational test of the rudder hydraulic actuation (Ref. AMM TASK 27-24-00-710-001).

 (2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).

 4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR INPUT OF R PEDALS XDCR UNIT 25CE2

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:

 - replace the XDCR UNIT-PEDAL POS, R (25CE2), (Ref. AMM TASK 27-92-15-000-001) and (Ref. AMM TASK 27-92-15-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 1

原标题:
79 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 产后做不到这几点, 就别埋怨老公冷落你

      总体来看,2月新能源汽车出现了产销双降的趋势,主要受到春节和冻雨天气的影响,消费者对新能源车产生观望情绪。
  • 李相龙:两会后债牛行情还会延续吗?

      电池方面,新车搭载43.24kWh的电池组,可提供208km的纯电续航以及1300km+的超长综合续航。当可城可野的捷途旅行者遇见可油可电的动力系统后。
  • 拥有美好的爱情

      人才培养是系统工程。优化基础学科教育体系,需要加强不同学段的衔接协同,特别要注重基础教育阶段和高等教育阶段的协同配合。“中小学阶段是学生个体科学素养形成的决定性阶段,科学教育的重点在于基础教育。”北京师范大学科学教育研究院院长郑永和说。
  • 9K金价格多少钱一克(2024年03月12日)

      回答专家张思莱医师(新浪母婴研究院专家,原北京中医药大学附属中西医结合医院儿科主任、主任医师)
  • 陆毅女儿迷上打牌又耍赖 娃娃头秀气大眼呆萌无辜

      比如2月23日成立的诺安中小盘精选混合,截至3月10日,涨幅达到3.26%,近期净值变化较为明显,显示出相对较快的建仓节奏;2月27日成立的国寿安保高端装备股票发起式也已开始建仓,3月8日,该基金净值上涨了0.44%。
  • 新质生产力:从理论到实践

      欢喜过年文化味浓
  • 熊猫发行30周年1盎司币价格今天多少一克(2018年11月07日)

      确实,作为我们最早的动漫启蒙,鸟山明所传递的积极、热血、友情,一直陪伴着我们的童年。
  • 大乐透头奖11注699万分落10地 奖池余额7.97亿

      《月令七十二候集解》云:
  • 比特币触及7.2万美元 拜登公布7.3万亿美元预算案

      中国人民大学首都发展与战略研究院研究员、国际关系学院教授李庆四对本报记者表示,美国基础设施多兴建于上世纪50年代,如今,大量基础设施已陈旧老化,存在更新和修缮需求。同时,过去30多年的产业转移造成了美国制造业空心化,由制造业繁荣而产生的中产阶级群体也随之萎缩。因此,美国近几届政府都有意振兴本土制造业,但政策均未取得明显效果。本届美国政府继续加大资金投入和政策扶持,希望促成制造业回流。然而,冰冻三尺非一日之寒,激进推行“美国制造”可能要付出高昂代价。
  • “大商所成立二十五周年”系列一:综述篇

      按照李想的叙事逻辑,MEGA的订单量没达成爆款的主要原因,在于少数“犯罪团伙”搞破坏。这些舆论和发言恶意地将MEGA的造型和棺材、灵车做类比,试图在这款车发布之初,就将这辆车彻底“锤死”。
  • 今年人民币对美元将温和贬值5%

      肯德尔为空军确定了15个优先重点,空军参谋长戴夫·奥尔文上将至少在其中两个当中强调了战备。首先是建立“任务准备司令部”,该司令部将隶属于飞行人员发展司令部(以前是空军教育和训练司令部)。
  • 长期通胀预期出现恶化 美联储又有麻烦了

      韩国首尔市大林洞坐落着一家名叫“福满楼”的中餐馆,这里既能找到地三鲜、锅包肉等传统东北菜,也有麻婆豆腐、担担面等热门川菜。餐厅老板孟凡福来韩国之前,在黑龙江佳木斯从事餐饮行业,他的妻子老家正巧是哈尔滨。
  • 外因素扰动 期指维持震荡

      做销售出身,赵一弘深谙营销之道。在那个硬广打品牌的时代,碧生源在各种媒体平台疯狂投广告,很快将自己打造成了“保健茶一哥”。
  • 24K金价格多少钱一克(2024年03月12日)

      如若一个人,和你在一起很沉默,甚至让你觉得很尴尬,你主动挑起话题,他总是寥寥数语,你能感受他的敷衍。
  • 廖群:2023年1

      同时,中控台、扶手箱和侧门饰板都拥有大面积的软性皮质包裹,营造出高级的内饰品质感。