国内精品♨️_叉叉云图工作室-艺文笔记

王金豹 2026年01月24日 18:19:46
发布于:曼谷

国内精品♨️_叉叉云图工作室_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Installation of the PTU Manifold CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN _______ YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO MUCH.  CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS _______  LUBRICANT.

 (1)  Remove the sealant from the mating surface of the manifold (7) and the aircraft structure with a plastic or wooden scraper.

 (2)  Clean the component interface and/or the adjacent area.

 (3)  Do an inspection of the component interface and/or the adjacent area.

 (4)  Examine the structure of the aircraft in the area of the manifold attachment for cracks, corrosion or other damage.

 (5)  Apply a layer of SEALANTS (Material No. 09-018) to the mating surface of the manifold (7).

 (6)  Put the manifold (7) in position on the aircraft and install the bolts (1) and the washers (2). Do not tighten the bolts (1).

 (7)  Remove the blanking plugs from the pipe end-fittings and the unions on the manifold (7).

 (8)  Make sure that the hydraulic line end-fittings are serviceable.

 (9)  Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of the line end-fittings.

 (10)  Connect the pipe (11) to the union (13).

 (11)  TORQUE the pipe end-fitting (12) to between 9.7 and 10.7 m.daN (71.53 and 78.90 lbf.ft).

 (12)  Connect the pipe (21) to the check valve 3093GM.

 (13)  TORQUE the pipe end-fitting (22) to between 12.9 and 14.2 m.daN

 (95.13 and 104.71 lbf.ft).

 (14)  Connect the pipe (48) to the union (50).

R 1EFF : 059-099, 102-105, 151-152, 201-206, 1 29-13-15Page 420 1 1 May 01/05 1 1 1CES 1

 (15)  TORQUE the pipe end-fitting (49) to between 1.5 and 1.7 m.daN (11.06

 (16)  Connect the pipe (3) to the reducer (5).

 (17)  TORQUE the pipe end-fitting (4) to between 5.4 and 5.9 m.daN (39.82 and 43.51 lbf.ft).

 (18)  Tighten the bolts (1).

 (19)  Make sure that the isolation coupling (45) engages correctly in the coupling half (46).

 (20)  Remove the blanking caps from the electrical connectors.

 (21)  Make sure that the electrical connectors are clean and in the correct condition.

 (22) Connect the electrical connector (29) to the PTU solenoid valve. R **ON A/C 001-049, 051-058, 101-101, R Post SB 29-1094 For A/C 001-049,051-058,101-101,  Subtask 29-13-15-560-050-D  A. Preparation of the Replacement Component  (1) Remove the components which are attached to the removed manifold (7) as follows:  (a)  Remove the PTU solenoid valve 3012GL (Ref. TASK 29-23-51-000-002).

 (b)  Remove the priority valve 3064GM (Ref. TASK 29-13-33-000-001).

 (c)  Remove the bobbins (9),(30) (Ref. TASK 20-23-21-911-001).

 (d)  Remove and discard the following items from the bobbins:

 -square section seals (10),(31),  -back-up rings (36), (37), (39), (40) and  -O-rings (35), (38).

 (e)  Put the bobbins (9),(30) into plastic bags to keep them clean.

 (f)  Remove the check valve 3093GM and discard the O-ring (23).

R 1EFF : 001-049, 051-099, 101-105, 151-152, 1 29-13-15Page 421 1201-206, 1May 01/05 1 1 1CES 1

 (g) Remove the check valve 3094GM as follows:

 1_ Cut, remove and discard the lockwire.  2_ Remove the check valve 3094GM and discard the O-rings  (15),(16) and the back-up rings (41).

 (h)  If necessary, remove and discard the lockwire from the coupling half (46) and the manifold (7).

 (i)  Remove the coupling half (46) and discard the packing (47).

 (j)  If necessary, remove the reducer (5) and discard the packing (52).

 (k)  If necessary, remove the union (13) and discard the packing (53).

 (l)  Install the blanking plugs on the open ports of the manifold (7).

 (m)  Install the blanking plugs on all of the removed components.

 (2) Install the removed components on the replacement manifold (7) as follows:  (a)  Remove the blanking plugs from the manifold (7) and the components.

 (b)  Lubricate the new O-rings and the threads of the components with HYDRAULIC FLUIDS (Material No. 02-003).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压4

原标题:
93 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 谭雅玲:美元贬值发力为加息铺垫

      对此,中国家居产业发展峰会大雁奖组委会执行秘书长王晓洁指出,当前,家居行业作为大宗消费品,被赋予了更大的期待,而家居企业和品牌的高质量发展则成为推动美好生活的重要力量。2023中国家居产业发展峰会旨在增强企业质量和品牌发展能力,推动开展中国品牌创建行动,开展品牌理论、价值评价研究,完善品牌价值评价标准、推动品牌价值评价和结果运用,为产业聚力、为品牌赋能。协会:达成认知,扩圈向上
  • 华为江淮首款车型更多信息曝光,MPV标杆要来了?

      今年,还发生了部分装企联手抵制制造业头部企业涉足家装领域的事件,其实,这也就是个事件,事件并不反映家装行业的力量(实力)强大,而恰恰是家装行业有点弱不经风的表现,行业外势力进入家装领域不是一天两天,之前就试过水,结果呛得头晕脑胀,现在再来,这是市场规律使然,从工地调研考察的实际情况看,制造业企业从事家装所表现出的工地施工交付质量、施工现场管理、施工材料使用等方面,与专业家装公司、尤其是品牌家装公司相比,确实存在差距,真想做好家装,不是臆想中那么简单的事,再次呛水甚至溺水的可能性和以往相比同样是大概率的存在。
  • 图表家每日一图:黄金突破三角形上轨,关注阻力1231.51

      新加坡的法律不管你是不是游客,也不管你是哪国人,一样执行,最著名案例莫过于麦可·彼特·费尔。18岁的美国公民麦可·彼特·费尔在新加坡对汽车涂鸦、砸玻璃,被判鞭刑4下,连当时的美国总统克林顿求情都照打不误。
  • ST贵人退市,“贵人鸟”已飞走

      对于贝玲妃的退出
  • 投行老兵借200万炒1只股:两周后停牌重组 结果亏百万

      海洋标志号在设计之初,就将海滩度假、度假村和主题公园的元素结合在一起,因此除了上述的游玩设施,海洋标志号还提供了商业中心和美食街。
  • 降准降息意在安抚市场情绪

      值得一提的是,苹果11月28日在上海举办了一场“AppleVisionPro开发者实验室”活动,开发者们可以体验在AppleVisionPro上运行的visionOS、iPadOS或iOS应用。DIGITIMESResearch分析称,苹果进军XR后,iOS上有200万个应用自动转移到visionOSAppStore,这对用户和开发者来说都是一个巨大的福音。
  • 开发者怒斥苹果欧洲新规:就像“教父”,制定霸王条款、收取高额“保护费”

      “疯狂动物城”正式开园不到3个月,上海迪士尼就马不停蹄地启动了新景点的筹备工作。3月11日,上海迪士尼度假区宣布,近期开启了位于乐园内一个新景点的前期建设准备工作。自2016年开园以来,上海迪士尼相继上新“迪士尼·皮克斯玩具总动员”以及“疯狂动物城”主题园区,并正在建设第三座迪士尼主题酒店。放眼全球,香港迪士尼、东京迪士尼也相继推出新主题园区。在全球迪士尼乐园陆续上新的背后,是华特迪士尼对其主题乐园业务发展的新考量。
  • 央国企料迎价值重估 券商看好投资机会

      ●增资标的名称及金额:公司拟对赛轮香港、赛轮香港拟对赛轮新加坡分别增资9,800万美元。
  • “未来武装侦察直升机”项目为何被叫停

      对比之下,AppleWatch也就仅比三星晚了两三年的时间。据钛媒体App不完全统计,2023年国内一共有7家品牌发布了13款折叠屏产品,包括左右折以及上下折,头部品牌中也就苹果还未发布相关产品。
  • 挑选小儿退热药,宝妈们各有绝招

      吨位大,意味着更多的活动空间和载客数量。海洋标志号的舱房数量为2805间,按照‘故宫房间计数法’换算,每天睡一间,需要7年半才能睡完所有房间。
  • 埂上设计:“网红空间”的价值缔造者

      真正的开创者,在决定开创时,是不会循着前人的足迹的,因为他们前面没有人人了。所以某种程度上,乔布斯和马斯克是一类人,而库克不是。
  • 弱冷空气来临广东南北温差11.2℃ 今广州仍秋雨濛濛

      澎湃新闻:针对中小学生普遍存在的学习负担重、素质教育推进难等问题,谢家湾学校探索出了一条低负担、高质量的素质教育路径。请问,为此谢家湾学校做了哪些探索与努力?有哪些好的成果和经验?
  • 《2015人民币去哪?》

      天人菊在野风中盛放是芒种