天堂岛精品🔇_亚洲天堂视频在线观看-艺文笔记

王金豹 2025年12月18日 23:19:55
发布于:曼谷

天堂岛精品🔇_亚洲天堂视频在线观看_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 (b) If there is no ground signal:  - replace the APU MASTER SW (14KD).  1_ If the fault continues:  - do a check and repair of the aircraft wiring between the  MAIN START CONTACTOR (5KA) B5 and the terminal block

 2266VT/4 (Ref. AWM 49-42-01).  B. Do the test given in para. 3.

 TASK 49-00-00-810-987  Backup Start Contactor output open (APS 3200)

 1. Possible Causes _______________  - B/U START CONTACTOR (10KA)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 49-00-00-710-008 Operational Test of the APU (APS 3200)  AMM 49-42-55-000-001 Removal of the Start Contactors (5KA,10KA)  AMM 49-42-55-400-001 Installation of the Start Contactors (5KA,10KA)  AMM 49-61-34-000-002 Removal of the Electronic Control Box (ECB) (59KD)

 (APS 3200) AMM 49-61-34-400-002 Installation of the Electronic Control Box (ECB) (59KD) (APS 3200) ASM 49-42/01  3. Fault Confirmation __________________  A. Do the operational test of the APU (Ref. AMM TASK 49-00-00-710-008).  4. Fault Isolation _______________  A. If the APU Last Leg Report gives the maintenance message:  CONTACTOR (10KA)  Fault Code Number: 018 or 086

 - replace the B/U START CONTACTOR (10KA) (Ref. AMM TASK 49-42-55-000-001) and (Ref. AMM TASK 49-42-55-400-001).  (1) If the fault continues:  - do a check and repair the wiring between the Back-Up Start Contactor(10KA) and the ECB (59KD) (Ref. ASM 49-42/01).  (a) If the fault continues:  - replace the ECB 59KD (Ref. AMM TASK 49-61-34-000-002) and (Ref. AMM TASK 49-61-34-400-002).  B. Do the test given in para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 106-106, 108-149, 211-299, 301-399, ∞∞49-00-00∞∞∞∞∞∞∞∞∞∞Page A262  Config-2 Aug 01/05 CES TASK 49-00-00-810-988

 Backup Start Contactor failed open (APS 3200)  1. Possible Causes _______________  - ECB (59KD)

 2. Job Set-up Information ______________________  A. Referenced Information  ------------------------------------------------------------------------------- REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 49-00-00-710-008 Operational Test of the APU (APS 3200) AMM 49-61-34-000-002 Removal of the Electronic Control Box (ECB) (59KD) (APS 3200) AMM 49-61-34-400-002 Installation of the Electronic Control Box (ECB) (59KD) (APS 3200) ASM 49-42/01  3. Fault Confirmation __________________  A. Do the operational test of the APU (Ref. AMM TASK 49-00-00-710-008).  4. Fault Isolation _______________  A. If the APU Last Leg Report gives the maintenance message:  CURRENT LIMITER 6KA / CONTACTOR 10KA  Fault Code Number: 126

 - do a check and repair of the wiring between ECB (59KD) AB/E3 and the BACKUP START CONTACTOR (10KA) A/G (Ref. ASM 49-42/01).  (1) If the fault continues:  - replace the ECB (59KD) (Ref. AMM TASK 49-61-34-000-002) (Ref. AMM TASK 49-61-34-400-002).  B. Do the test given in para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 106-106, 108-149, 211-299, 301-399, ∞∞49-00-00∞∞∞∞∞∞∞∞∞∞Page A263  Config-2 Aug 01/05 CES

 TASK 49-00-00-810-989

 Main Start Contactor failed open (APS 3200)  1. Possible Causes _______________  - ECB (59KD)

 - CONTACTOR-MAIN START (5KA)

 2. Job Set-up Information ______________________  A. Referenced Information  ------------------------------------------------------------------------------- REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 49-00-00-710-008 Operational Test of the APU (APS 3200) AMM 49-61-34-000-002 Removal of the Electronic Control Box (ECB) (59KD) (APS 3200) AMM 49-61-34-400-002 Installation of the Electronic Control Box (ECB) (59KD) (APS 3200) ASM 49-42/01   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 机载辅助动力 2

原标题:
92 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 北向资金加仓!“宁王”久违大涨

      在2023年10月末召开的中央金融工作会议上,习近平总书记提出要加快建设金融强国。在2024年1月召开的省部级主要领导干部推动金融高质量发展专题研讨班上,习近平总书记又系统阐述金融强国的丰富内涵,明确了我国建设金融强国的奋斗目标和主要任务,指明了金融强国建设的实践路径,对我国金融业高质量发展具有重大战略指导意义,需要深刻领会和全面把握。
  • 孩子3岁前有这几个表现,可能是深藏不漏的高智商

      盛夏骄阳似火,又怎少得了冉冉海浪作伴?《剑侠世界3》海景地图——鼓浪屿,邀你一同共赏椰林海岛风光!位于江南东南部的鼓浪屿,俯瞰海色碧绿墨蓝层层叠进,白沙平展细腻,岸线逶迤不断。近望海边磐石嶙峋,叠峰苍翠,木屋坐落于奇石山间,椰林摇曳,别有一番韵味。共游江湖之时,来此听海浪微波潺潺,享椰风拂面,为清凉夏日增添海岛浪漫之意。
  • 周鸿祎谈子女教育:希望孩子能保持好奇心和学习力

      如果回到“乱世买黄金”这句古老的格言上,黄金是不是还值得买,就要看你是否觉得当前的世界还会足够“乱”。
  • 伍戈:去杠杆紧货币还是松货币?

      前者注册出资额5亿元,由合肥市科技局会同市产投集团,联合科大硅谷公司及相关县(市)区、开发区共同发起设立,为合肥市种子基金的子基金,聚焦高端装备制造、集成电路、生物医药与大健康等重点产业集群建设;后者注册出资额1亿元,目标总规模5亿元,由合肥市滨投公司联合合肥市种子基金、庐阳科创、北城产投等单位设立,专注于大科学装置衍生技术成果的转化,打通科技成果从“实验室”到“应用场”的“最初一公里”。
  • 期市齐跌:原油螺纹再探新低 空头情绪笼罩市场

      原标题:春节假期全国民航累计运输旅客1799.2万人次
  • 小改变大惊喜 精致鼻整形新趋势

      公司拟在印尼投资建设“年产360万条子午线轮胎与3.7万吨非公路轮胎项目”,该项目拟由公司全资子公司SAILUNINTERNATIONALHOLDING(SINGAPORE)PTE.LTD.(以下简称“赛轮新加坡”)在印尼设立的全资子公司具体实施。为满足赛轮新加坡对该全资子公司注册资本金的出资需要,公司拟对相关子公司进行增资,具体增资路径为:公司先对赛轮国际控股(香港)有限公司(以下简称“赛轮香港”)增资9,800万美元,增资完成后再由赛轮香港对赛轮新加坡增资9,800万美元。
  • 2018年熊猫金套币价格今天多少一克(2018年11月12日)

      商务部中国国际电子商务中心电子商务首席专家李鸣涛表示,激活消费应该成为当前经济政策的优先事项,通过提升消费快速形成应对经济下行的强大拉动力。同时,消费活跃也是未来经济发展信心的重要体现,当前,信心比黄金更重要。“618”是我国上半年网络零售最重要的集中促销活动,尤其是在当前社会消费增长进入下行通道,线下零售受疫情防控措施影响较大的情况下,今年“618”大促应该成为刺激消费、重拾信心的关键一仗。
  • LVMH计划将更多旗下品牌总部迁至上海

      大家还记得我前一阵子写过的勐焕银塔吗?当时我就写到,芒市必打卡的景点,除了银塔,还有一座金塔。
  • 房地产销售反弹整体利好中国股市

      “进入2024年后,我国多地出现长时间低温雨雪天气,特别是南方出现0℃以下的年度最低气温,引发业内对异常天气和自然灾害的担忧。根据历史气候规律,业界普遍认为,今后几年,异常气候可能成为影响今年中药材价格的‘黑天鹅事件’。”生意社分析师周聿爱分析近期中药材市场行情时表示,随着交易恢复,前期库存量大的品种,持货商积极出货,价格也开始走低。
  • “千万年薪”董事长主动辞职,骨科耗材集采下威高骨科业绩承压

      1、自公司股票上市之日起12个月内,不转让或者委托他人管理本人在本次发行及上市前直接或间接持有的发行人股份,也不要求发行人回购该部分股份。
  • 相关部门应加强配合妥善处理私募股权基金风险

      这是一款音乐舞蹈游戏,自2024年新年伊始开放预注册,就受到了很多玩家的关注与支持,加入了《舞侠Online》的粉丝群,大家共同探讨曾经游戏带给自己的感动,还有对《舞侠Online》的期待。
  • 奥特曼卡牌“瘾”忧:赚学生钱财,助攀比之风,不少商家仍在违规售卖

      5、公司本次股票期权激励计划采取自主行权的模式。行权期内,公司激励对象在符合规定的有效期内可通过选定承办券商(股份有限公司)系统自主申报行权。承办券商在业务承诺书中承诺其向上市公司和激励对象提供的自主行权业务系统的技术规范完全符合证券交易所及中国登记结算公司对于自主行权业务的操作要求,能够有效控制并防止激励对象在相关敏感期内行权、短线交易。