国内精品♨️_97在线观看免费高清电视剧大全-艺文笔记

王金豹 2025年12月16日 08:02:54
发布于:曼谷

国内精品♨️_97在线观看免费高清电视剧大全_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 - install 540AB, 540BB, 540CB, 540DB, 540EB, 540FB, 540GB, 540HB, 540JB, 574BB

 - install 640AB, 640BB, 640CB, 640DB, 640EB, 640FB, 640GB, 640HB, 640JB, 674BB.

 (3)  Remove the HOOK-COVER (RIB 2 SURGE DOORS) and carefully close the door 540AZ (640AZ).

 Subtask 28-42-43-650-053  B. Fuel Configuration  (1) Refuel, defuel or transfer fuel as necessary (Ref. TASK 12-11-28-650-003), (Ref. TASK 28-25-00-650-001) or (Ref. TASK 28-25-00-869-001).  Subtask 28-42-43-942-054  C. Removal of Equipment  (1)  Remove the safety barriers.

 (2)  Remove the warning notice(s).

 (3)  Remove the access platform(s).

 (4)  Remove the ground support and maintenance equipment, the special and standard tools and all other items.

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-43Page 476 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 TASK 28-42-43-000-003

 Removal of the Wing-Tank Outer-Cell Group A Harness 15QT1(15QT2)  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU _______ START A TASK ON OR NEAR:  - THE FLIGHT CONTROLS

 - THE FLIGHT CONTROL SURFACES

 - THE LANDING GEAR AND THE RELATED DOORS

 -COMPONENTS THAT MOVE.  WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING _______ GEAR.  1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific blanking cap No specific circuit breaker(s) safety clip(s) No specific safety barriers No specific string No specific tape No specific access platform 4.0 m (13 ft. 1 in.) R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-43Page 477 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 B. Referenced Information

 -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 28-10-00-910-001  Safety Procedures When You Do Work in a Fuel Tank  28-10-00-910-002  Access to the Fuel Tanks and the Work Areas  28-25-00-650-001  Pressure Defuel  28-25-00-650-003  To Drain Remaining Fuel from the Wing Tanks and the  Center Tank  57-27-11-000-002  Removal of the Access Panel (540HB, 540JB, 540KB,  540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,  550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,  ....)  28-42-43-991-003  Fig. 401  28-42-43-991-009  Fig. 405  28-42-43-991-008  Fig. 408  28-42-43-991-005  Fig. 409  28-42-43-991-012  Fig. 410  3. Job Set-up__________  Subtask 28-42-43-941-058  A. Safety Precautions

 WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK. _______  (1) You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.  (2) Put the safety barriers in position. Subtask 28-42-43-860-050  B. Fuel Configuration  (1)  Defuel the applicable fuel tank (Ref. TASK 28-25-00-650-001).

 (2)  Drain the remaining fuel from the applicable fuel tank (Ref. TASK 28-25-00-650-003).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-42-43Page 478 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 28-42-43-865-056

 C. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/FQI/CHAN/1 1QT A13 121VU FUEL/FQI/CHANNEL/1 AND 2 8QT L26 121VU FUEL/HI/LVL/SPLY 1QJ L25 121VU FUEL/FQI/CHAN/2 2QT M27 121VU FUEL/PUMPS/2/R CTL AND L IND 10QA R29 121VU FUEL/CTR TK/PUMPS1 AND 2/CTL AND IND 32QA R26 121VU FUEL/CTR TK/PUMPS1 AND 2/CTL AND IND 31QA R25 121VU FUEL/PUMPS/1/L CTL AND R IND 3QA R23  Subtask 28-42-43-010-057  D. Get Access  (Ref. Fig. 401/TASK 28-42-43-991-003)

 (1)  Put the access platform in position below the applicable access zone 540(640).

 (2)  Remove the applicable access panels (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-27-11-000-002):   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUEL 燃油6

原标题:
68 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 娃哈哈告别宗庆后

      1、互联网投票系统开始投票的时间为2024年3月27日(现场股东大会召开当日)9:15一15:00。
  • 抢人之后就是鼓励造人

      所以有人才说,一个胖女孩的青春是疼痛的。
  • “90后”旅行即生活 边走边订成消费一大特色

      不仅仅是上海迪士尼,全球范围内多个迪士尼乐园也在陆续上新,迪士尼愈发重视主题乐园业务板块。
  • 上市以来首亏!汽车巨头东风集团遭遇阵痛期

      作为市场最为期待的产品之一,除了发布时间点外,摆在苹果面前的还有许多挑战。一是如何定价,众所周知,目前iPhone的价格已经超过万元,可折叠版本的价格如何和直屏做好划分,以及定在哪一区间,是需要慎重考虑的事情。毕竟,就算产品力再强,价格一旦超过五位数,还是会劝退很多人。
  • USDA:3月份公布的全球豆油供需平衡表

      ElsaHosk的这身装扮特别推荐给《时尚芭莎》的读者。条纹及膝短裙和高跟鞋,是保守办公室造型,然而,落肩的超大款式,升华为一种新的时髦风格。
  • 机构:关注港股反弹机会

      六、激励对象缴纳个人所得税的资金安排和缴纳方式
  • 让更多的孩子在“家门口”上“好学校”

      生育与养老话题在2024年两会期间备受关注。据统计局数据,2023年出生人口902万人,出生率为6.39‰;死亡人口1110万人,死亡率为7.87‰;全国60周岁及以上人口占总人口的21.1%。
  • 孕晚期受伤需要打破伤风吗?

      2024年3月12日海量资讯、精准解读,尽在新浪财经APPVIP课程推荐加载中...APP专享直播1/10热门推荐收起新浪财经公众号
  • 你穿多大码的鞋,注定你是什么女人!(经典)

      若在前述三十个交易日内发生过转股价格调整的情形,则在转股价格调整日前的交易日按调整前的转股价格和收盘价计算,在转股价格调整日及之后的交易日按调整后的转股价格和收盘价计算。
  • 日男排联赛广岛JT险胜名古屋 江川19分王东宸11分

      这背后,险资入市面临一些挑战。屈放进一步表示,影响险资配置的主要因素有宏观因素,包括政策和监管的调整、产业发展走向和社会经济结果,也包括险资企业自身的资产负债情况以及偿付能力等,还包括权益市场产品端的改善,包括中长期投资品种等。
  • 全国政协委员洪明基:建议不要给00后贴标签

      此外,由于长期代理单一品牌的产品,对于从生产到销售的各个环节也高度熟悉,因此这些人无论是自主创业还是转投其他品牌,都有着相当大的资源优势。
  • 两会之后关注这些政策走向

      虞书欣米兰时装周看秀,身穿黑色链条挂脖连衣裙耀眼瞩目。
  • 十年梦碎,苹果汽车项目走向终结

      //主力资金净流入40多亿元//
  • 药明康德回购股份提振信心,海外生物医药研发景气度复苏

      在泾源县大湾乡杨岭村,习近平2016年曾经问过的小男孩,如今已经13岁,上小学六年级。他告诉记者,他们家在2017年已经建了新的浴室,还装上浴霸,洗澡不仅不是问题,而且还更加舒适方便,与城里无异。△习近平2016年曾经问过的小男孩,如今已经13岁,他们家修建了新浴室
  • 俄媒:俄军在乌使用新型“神奇炸弹”

      国内信用卡,甚至香港的储蓄卡都能在新加坡直接消费用,出租车也能用卡。如果是带有小喇叭的,拍卡就行了。在新加坡的黄色和蓝色的的士,可用支付宝和微信,加收的费用比刷信用卡少。现金不加收费,信用卡加上车费的10%,支付宝、微信等,以及新加坡本国的一些手机支付,加收一块多钱。