国内精品♨️_谁给个黄网-艺文笔记

王金豹 2026年02月03日 09:20:06
发布于:曼谷

国内精品♨️_谁给个黄网_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

TM 1-1520-240-10 6-6-18 6-6-35. Cargo Weight. Package weight of individual items of cargo should be legibly stenciled on an exterior surface. If not provided, the weight must be determined in order to plan cargo placement, to calculate contact pressure, and too compute helicopter weight and balance. The same rule applies to palletized cargo and vehicle loads. 6-6-36. Cargo Center of Gravity. The center of gravity (C.G.) of each item of cargo must be determined in order to compute weight and balance by the station method. As a rule, those items of cargo crated for transport will be marked with a C.G. If the C. G. is not marked, it can be determined by methods provided in TM 10-450-10. 6-6-37. Vehicle Load. The same general rules that are observed in cargo loading apply to vehicle loading. In addition, the fuel tank caps, radiator caps and battery filler caps should be checked and secured. Fuel tanks should be checked to see that they are not filled above three-quarters capacity. Air trapped in a fuel tank will expand at altitude and force fuel out through the filler neck, creating a fire hazard. If fuel tanks are filled to capacity, some fuel must be drained off before the vehicle is loaded. Also, check tire pressures and if necessary, deflate tires to prescribed limits. 6-6-38. Hazardous Cargo. Items of cargo possessing dangerous physical properties, such as explosives, acids, flammables. etc., must be handled with extreme caution and in accordance with established regulations and TM 38-250. 6-6-39. General Instructions for Loading, Securing, and Unloading Cargo. There are three prime factors to be considered in properly loading the helicopter. These factors are weight, balance, and restraint. The weight of the cargo to be loaded must remain within safe operating limits, and the cargo must be restrained from shifting during takeoff, flight, and landing. Refer to TM 10-450-10 to determine or compute loading, shoring and restraint criteria. 6-6-40. Weight and Balance. Refer to TM 55-1500-342-23 and figure 6-7-1 to compute helicopter GW/CG and complete Form F. 6-6-41. Restraint. Items of cargo within the helicopter are subject to the same forces which affect the helicopter in flight. These forces will cause the cargo to shift unless the cargo is restrained. To maintain helicopter balance and prevent injury to personnel, cargo must be restrained from shifting. TM 1-1520-240-10 6-6-19 Figure 6-6-10. Stowage Locations TM 1-1520-240-10 6-6-20 Figure 6-6-11. Cargo Door Cranking 6-6-42. Load Planning. Before loading cargo, the placement of individual items of cargo in the helicopter should be planned and then checked to determine if the planned arrangement falls within the C.G. limits. there are three basic steps involved in load planning. The first step is to decide which method will be used to compute C.G. of the load. If the compartment method is to be used, each item of cargo must be assigned a location in one of the three compartments. If the station method is to be used, specific station locations must be assigned to each item of cargo. The second step is to compute the C.G. of the load. If the load consists of a number of items of cargo, the compartment method should be used. If the load consists of only a few bulky items, the station method should be used. The third step is to check if the C.G. falls within the allowable limits. If it does, the cargo can be loaded; if not, the location of individual items should be rearranged until an acceptable loading plan is obtained. 6-6-43. Compartment Loading. Loading by compartments provides a rapid means of computing the C.G. of a load and can be used whenever the cargo load consists of a number of items. The helicopter cargo compartment is divided into three compartments (fig. 6-6-12). The centroid, or center of balance, of each compartment is located at station 181, 303, and 425, respectively. When using the compartment method, it is assumed that the weight of all the cargo in the compartment is concentrated at the centroid of the compartment. If an item of cargo extends into two or three compartments, the weight of the item should be proportionately distributed in each compartment. The C.G. of the cargo load is computed as follows: a. Record the weight of cargo in each compartment. b. Calculate the compartment moment by multiplying the total weight in each compartment by the station number of the compartment centroid. c. Add the compartment moments.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:支奴干运输直升机操作手册2

原标题:
78 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 冯小刚辟谣病情恶化放弃治疗:谣言总会不攻自破

      没有这份由内而外的力量支撑着,不论是瘦成圆规,还是胖成文艺复兴时代画作中的贵妇,都免不了要沾染上几分焦虑和卑下。
  • 报考技巧:三步报志愿法 快速锁定理想大学

      别人精心设计的陷阱之中
  • 今年银行贷款增速仍将强劲

      从产业的角度来看,百川盈孚3月9日表示,终端整车厂降价促销拉动需求,头部电芯厂起量较为明显,开工率上升,整体装置负荷升到五成左右,中小厂也陆续恢复生产;车厂持续降价,为保证利润空间,车企或将继续向上游压价,降本压力逐级传递。但预计短期内锂电池价格还将保持稳定。
  • Steam VR Fest 开启:多款 PCVR 游戏打折促销

      据中国汽车工业协会方面预测,2024年中国汽车增速将由2023年的12%收缩至3%左右,面对大潮渐弱的行业趋势,长安汽车2024年与上一年保持同样的销量目标,代表了不退即是前进的期望。
  • 已培养60位教授!他耕耘17年发Science:我遇到个优秀博士生

      春节假期,山东泰安市东平县大宋不夜城景区灯火璀璨,烟花秀、非遗打铁花、龙狮迎新春等活动精彩纷呈。大年初一当天,大宋不夜城接待游客7.76万人次,实现旅游收入148.43万元。济南市长清区围绕2024春节山东乡村文化旅游节,策划举办了新年祈福会、新春美食节及非遗集市等特色文旅活动,吸引众多市民和游客前来游玩。
  • 德国如何进行供给侧改革

      同时,社区配有健康体适能测评室,通过体适能测评报告,可以出具个性化的运动处方,指导长者科学运动,达到增强体质、预防疾病的目的。
  • 当代表委员们在热聊新质生产力时,他们在聊些什么?

      张齐说,建议将普惠托育纳入基本公共服务,以中央财政补助资金作为支持,推动地方落实属地管理责任,缓解入托难、减轻入托贵,增强托得好的信心。国家要求把积极应对人口老龄化融入各项公共政策制定中,保证适度生育水平才能从根源上解决老龄化问题,托育服务是要解决愿意生、有人养的问题。
  • 罗志恒:如何看待2024年财政政策积极程度?

      在经历1月开门红和2月同环比双降后,3月车市会走向何方?对此中汽协指出,汽车是工业经济稳增长的“压舱石”,一直以来都得到党中央和国务院的高度重视。今年的政府工作报告中,明确提出要“巩固扩大智能网联新能源汽车等产业领先优势”和“提振智能网联新能源汽车等大宗消费”。
  • 补壹刀:今天最大的国际笑话,但可能是一盘大棋!

      事实证明,要完善这样的系统——更不用说大规模生产了——是很难的。除了技术复杂性之外,激光和微波武器还需要锗和镓等贵金属部件和材料。
  • 透视美国政治经济周期:特朗普经济学能有效吗

      从1959年品牌诞生至今,个性、自我、不妥协,一直是MINI图腾,这也让它获得了一大批拥趸。MINI这个传奇品牌,有着浓郁的文化氛围、标志性的经典设计,卡丁车般的驾驶快感、特立独行的个性,无论如何更新迭代,MINI还是那个MINI。(责编:leo)关键词:新浪汽车公众号
  • 收盘:美股涨跌不一 标普500指数连续第二日下滑

      (1)施工周期无明显变化:施工周期分成两个部分,整装施工工期以80平米为例,合同工期基本在60个工作日至90个工作日;定制化全案整装,以130平米为例,基本在90至120个工作日左右;半包工地,以130平米为例,也多在90工作日至150工作日之间;与二十年前家装公司120平米合同工期的90自然日至120自然日相比,基本属于原地踏步甚至工期还有增加。
  • 俄超男排别尔哥罗德逆袭圣彼得堡 张景胤斩获14分

      在这种高强度的“学习”下,即使不是理想的自来水,也会对这家公司的面貌有深刻的印象。
  • 「龙抬头」多枚红盘案名揭晓 抢春北京楼市

      随着社会发展时代变迁,涂料行业受市场波动也在暗流涌动中产生着瞬息万变。全球疫情的反复,经济贸易摩擦,在今后或将成为一种常态,与此同时必定伴随着市场业态被重新洗牌。