深夜福利✅_久久宗合色色🍢-艺文笔记

王金豹 2026年01月13日 07:29:59
发布于:曼谷

深夜福利✅_久久宗合色色🍢_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 ELECTRICAL CLOCK - FAULT ISOLATION PROCEDURES _____________________________________________  TASK 31-21-00-810-801  Failure of the Clock

 1. Possible Causes _______________  - CLOCK (2FS)  2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 31-21-21-000-001 Removal of the Clock (2FS)  AMM 31-21-21-400-001 Installation of the Clock (2FS)  AMM 31-32-00-740-003 Ground Scanning of the CFDIU

 3. Fault Confirmation __________________  A. Make sure that this(these) circuit breaker(s) is(are) closed:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU CLOCK/NORM/SPLY 6FS F11  **ON A/C 001-049, 051-061, 101-105, 201-203,  121VU CLOCK/STBY/SPLY 4FS N03 R **ON A/C 062-099, 106-149, 151-199, 204-299, 301-399, 401-499,  121VU CLOCK/STBY/SPLY 4FS N02 **ON A/C ALL  B. Test Do the ground scanning of the CFDIU (Ref. AMM TASK 31-32-00-740-003).  4. Fault Isolation _______________  A. If the test gives the maintenance message CLOCK:  - replace the CLOCK (2FS), (Ref. AMM TASK 31-21-21-000-001) and (Ref. AMM TASK 31-21-21-400-001).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞31-21-00∞∞∞∞∞∞∞∞∞∞Page 201  Aug 01/05 CES

 B. Do the test given in Para. 3.B.

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞31-21-00∞∞∞∞∞∞∞∞∞∞Page 202  Feb 01/00R  CES  Failure of the Power Supply of the Clock

 1. Possible Causes _______________  - CLOCK (2FS)

 - C/B CLOCK/NORM/SPLY (6FS)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 31-21-21-000-001 Removal of the Clock (2FS) AMM 31-21-21-400-001 Installation of the Clock (2FS) ASM 31-21/01  3. Fault Confirmation __________________  A. Test  Not applicable, the fault is evident.

 4. Fault Isolation _______________  A. When the displays go off:  - do a check of the status of the circuit breaker (6FS).  (1) If the circuit breaker (6FS) is closed:  - replace the CLOCK (2FS), (Ref. AMM TASK 31-21-21-000-001) and (Ref. AMM TASK 31-21-21-400-001).  (a) If the fault continues:  - do a check of the wiring from the clock (2FS) pin A/V to the circuit breaker (6FS) , (Ref. ASM 31-21/01).  1 If there is no continuity: _

 - repair the wiring.  2 If there is continuity:

_ - replace the C/B CLOCK/NORM/SPLY (6FS).

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞31-21-00∞∞∞∞∞∞∞∞∞∞Page 203  Feb 01/00R  CES  (2) If the circuit breaker (6FS) is open:

 - close the circuit breaker.  (a) If the circuit breaker trips:  - replace the CLOCK (2FS).  1 If the fault continues: _

 - do a check and repair for a short to ground the wiring between the circuit breaker (6FS) and the clock (2FS).  (b) If the circuit breaker stays closed and the fault continues:  - replace the CLOCK (2FS).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞31-21-00∞∞∞∞∞∞∞∞∞∞Page 204  Feb 01/00R  CES  Loss of the Bus Output from the Clock Detected by the AFS

 1. Possible Causes _______________  - FMGC-1 (1CA1)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 指示和记录系统 1

原标题:
14 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 突破2200美元,投机资金大举涌入!

      ‌‌‌‌⁠‌‌‌‌⁠‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌⁠‌‌⁠‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌⁠‌‌‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌‌⁠‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌⁠‌‌⁠‌‌‌‌‌⁠‌‌‌‌‌⁠‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌⁠‌‌‌‌‌‌⁠‌‌‌‌‌‌
  • 人均消费3000元! 环球影城“冤不冤”?

      新生代也在不断崛起,00后涌入网文行业,新一轮的造富故事悄然拉开帷幕。
  • 一张图:2024/03/08黄金原油外汇股指"枢纽点+多空占比"一览

      这类图片不起眼,却胜在数量多。差不多同一时候,亚马逊也推出了类似的功能。
  • 惠心服务 惠达武汉|服务客户零距离

      对于苹果而言,这一年发布的iPhone6和iPhone6Plus在全球热销,带动苹果股价一路突破7000亿美元市值,同时也帮助苹果奠定了其在全球智能手机行业里的霸主地位。
  • 建发·观堂府

      除了游戏内容,本次游戏主播嘉年华还设置了丰富多彩的周边活动,如签名会、抽奖环节等,为现场观众带来了更多的惊喜和快乐。
  • 汪涛:明年经济增速将小幅回落

      吴昕在社交平台发布的多组照片中,能看见尝试了很多以“红色”开衫为主的穿搭。珍珠做纽扣的正红色开衫具有法式浪漫风情,因此通过真丝波点A字裙做搭配。
  • 弘一:振兴近代律宗的一代宗师(组图)

      我问你,你会用宝马X5的价格,去买一个国产纯电MPV吗?加上购置税快60万的MEGA,几乎跟潜在车主划开界限。
  • 任泽平:中国金融去杠杆初现成效

      北京时间12日凌晨,美股周一收盘涨跌不一,标普500指数连续第二个交易日下滑。本周市场重点关注2月消费者价格指数(CPI)和生产者价格指数(PPI),以判断美国的通胀状况与美联储的降息路径。白宫预计今年美国经济增长明显减速,通胀将继续维持高位。
  • 任泽平:雄安新区将点燃改革信心

      为了方便轮椅长者的生活,天津乐境在常规的双猫眼、智能门锁等设施之外,特地将浴室镜与垂直墙面呈15°角向下倾斜,方便坐轮椅的长者轻松照到镜子,也是一项非常贴心的设计。
  • 渤海期货:地产预期悲观引导黑色继续下跌

      5、若今后上述销售机构依据法律法规及基金相关法律文件对投资起点金额、级差及累计申购限额等标准进行调整,以上述销售机构最新规定为准。
  • 产后第一周,新妈妈一定要牢记这些禁忌

      李强进一步指出:“促进跨境电商等新业态健康发展,优化海外仓布局,支持加工贸易提档升级,拓展中间品贸易、绿色贸易等新增长点,积极扩大优质产品进口,全面实施跨境服务贸易负面清单。出台服务贸易、数字贸易创新发展政策,加快内外贸一体化发展,办好进博会、广交会、服贸会、数贸会等重大展会。加快国际物流体系建设,打造智慧海关,助力外贸企业降本提效。”
  • 国际金价屡创新高 银行力推积存金

      同时,家长还要给孩子设立规则,比如,周一到周五,规定孩子每天可以看一个小时手机,周末可以最多看3个小时,并严格按照规则执行。
  • 洛城警员私自传播科比遇难现场照!瓦妮莎崩溃

      但苹果不一样,苹果的毛利率高达45%,净利润率都有26%。作为对比,特斯拉的毛利率不过也才18%,净利率更是只有16%,更别提其他大多数造车新势力的毛利率还赶不上特斯拉,净利率更是为负的。