国内精品♨️_2020年3月黄道吉日-艺文笔记

王金豹 2025年11月15日 04:58:09
发布于:曼谷

国内精品♨️_2020年3月黄道吉日_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

F. Prepare for the Test SUBTASK 27-31-00-860-083 WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF ALL CONTROL SURFACES BEFORE YOU SUPPLY HYDRAULIC POWER. AILERONS, RUDDERS, ELEVATORS, FLAPS, SPOILERS, SLATS, AND THRUST REVERSERS CAN MOVE QUICKLY WHEN YOU SUPPLY HYDRAULIC POWER. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT. (1) Pressurize elevator hydraulic systems A and B. To pressurize them, do this task: Elevator Hydraulic System A and B - Pressurization, TASK 27-31-00-800-801. SUBTASK 27-31-00-860-084 (2) Do this task: Null Procedure - Mach Trim Actuator, TASK 27-31-00-700-801. SUBTASK 27-31-00-010-017 (3) Open this access panel: Number Name/Location 311BL Stabilizer Trim Access Door SUBTASK 27-31-00-860-085 (4) Use the bar, SPL-1677 to set the "B" dimension at 21.32 +/- 0.10 inches (541.5 +/- 2.5 mm) (Figure 502). G. Neutral Shift Test SUBTASK 27-31-00-730-010 (1) Do the neutral shift test: (a) Make sure the right elevator trailing edge moves up 13.90 - 14.90 inches (353.1 - 378.5 mm) from the index mark (Figure 523). (b) Use the bar, SPL-1677 to set the "B" dimension at 45.84 +/- 0.10 inches (1164.3 +/- 2.5 mm). (c) Move the captain’s control column aft and forward lightly to make sure it is in the neutral position. (d) Make sure the right elevator trailing edge moves down 3.20 - 3.80 inches (81.3 - 96.5 mm) from the index mark. SUBTASK 27-31-00-700-006 (2) Do the following steps to check the elevator system: NOTE: You use the Flight Management Computer Control Display Unit (FMC CDU) to do the following Built-In-Test Equipment (BITE) test. (a) If you need to supply electrical power, do this task: Supply Electrical Power, TASK 24-22-00-860-811 (b) Push the INIT REF key on the CDU keyboard. 1) Push the Line Select Key (LSK) that is adjacent to each selection: a) INDEX b) MAINT c) DFCS d) EXTENDED MAINTENANCE e) RIGGING 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-31-00 Page 585 Feb 10/2007 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details f) ELEVATOR NOTE: After you make this selection, the CONTINUE will show. Do the instructions that show on the CDU display before you push the LSK that is adjacent to CONTINUE. g) COMPLETE ELEV RIG NOTE: This selection contains the ELEV RIG test. h) During this test, do the instructions that show on the CDU display. i) After you do the instructions that show on the CDU display, push the LSK that is adjacent to CONTINUE. 2) Do the Elevator Rigging Check: a) Make sure that the values for the A and B sides are between the limits that show on the CDU display or in this task. Table 504/27-31-00-993-820 Test Limits: 51.01 STAB POS (VAC) -0.07 to 0.07 b) Use the trammel bar, SPL-1677 to measure the B dimension. c) Make sure that the B dimension is 39.89 (±0.01) inches. Table 505/27-31-00-993-821 Test Limits 51.02 MT ACT POS (VAC) -8.70 to -6.35 Note: No value for B side; N/A 51.03 MT ACT POS (VAC) -0.20 TO 0.20 Note: No value for B side; N/A 51.04 ELEV POS (vac) -0.55 RO -0.45 d) Make sure that the elevator trailing edge aligns with the elevator index on the tail cone at 0 (±0.06) inch. Table 506/27-31-00-993-822 Test Limits 51.05 NSS POS (VAC) -1.77 to -1.67 51.06 ELEV LVDT (VAC) -2.05 to -1.95 51.07 ELEV POS (VAC) -0.55 TO -0.45 e) Make sure that the elevator trailing edge aligns with the elevator index on the tail cone at 0 (±0.06) inch. Table 507/27-31-00-993-823 Test Limits 51.08 ELEV POS (VAC) -0.55 to -0.45 51.09 ELEV POS (VAC) -0.55 to -0.45 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-31-00 Page 586 Feb 10/2007 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details (Continued) 51.10 ELEV POS (VAC) -0.55 to -0.45 51.11 ELEV POS (VAC) -0.55 to -0.45 f) Set the B dimension to 29.00 (±0.01) inches. g) Use the trammel bar, SPL-1677 to measure the B dimension. h) Make sure that the B dimension is at 29.00 (±0.01) inches. Table 508/27-31-00-993-824 Test Limits 51.12 STAB POS (VAC) 4.47 to 5.29 51.13 ELEV LVDT (VAC) -0.06 to 0.06 51.14 ELEV POS (VAC) -0.10 to 0.10 51.15 NSS POS (VAC) -0.20 to 0.20 3) Do these steps to get out of the BITE test: NOTE: If there are instructions on the CDU display, it is necessary to do the instructions that show on the CDU display.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-600-700-800-900 AIRCRAFT MAINTENANCE MANUAL飞机维护手册3

原标题:
45 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 短期美联储加息预期升温

      不少网友都觉得很可惜
  • 梁建章:鼓励女性生育最有效的方式是给补贴

      外资对国内新能源两大龙头的评级进行了上调,工银瑞信认为,外资对A股的看法正发生改变。相对海外资产,A股在大幅回调后估值具有性价比。从产业周期来看,国内新能源龙头和部分企业在经历过周期后仍维持着显著的竞争优势,具有持续盈利的预期,同时估值较为便宜,电新龙头具备持续估值修复的基础。
  • 百度李彦宏:机器人就是车,车就是机器人

      是否要主动表白,因人而异,如果男生比较内向被动,女生外向开朗,那么女生主动一点反而能更好的展现自己的魅力。所谓女追男隔层纱,指的就是这种状况。女生的表白,可以采取直接的方式,也可以采取女性特有的暗示的方式、引导的方式、甚至一点刺激的方式,给他机会开口。
  • 中国股市最恐慌的阶段已经过去

      新需求牵引新供给,新消费呼唤新服务。如今,很多老年游客乐于接受新事物,体验新玩法,更加追求旅游品质。过去那种“上车睡觉,下车拍照”的跟团游早已不能满足需求。老年人出游时间灵活、人生阅历丰富,更在意景观价值和文化内涵,看重旅游过程中的情感互动、康养和研学体验,对历史型、观光型、怀旧型旅游更有兴趣,也更重视性价比与舒适度。针对这些特点,更好开发完善高品质旅行产品,安排具有社交属性的活动,提供更加舒适化的体验,才能不断改善银发族的旅游体验。
  • 315晚会曝光假香米、非标水泥管等,多地连夜处置涉事企业

      中国建筑材料流通协会会长、产业发展战略及行业评审专家秦占学也在致辞中表示,大雁奖·中国家居产业发展峰会自2013年举办以来,作为覆盖全家居行业的专业年会,开创了产业链上下游协会、商会、品牌、媒体共同协作的新局面,得到了业内广泛认可。
  • 黄金构建短期底部,释放短线做多信号

      但这样的跟随策略很快就让苹果感受到了绝望,因为特斯拉推出了更具有颠覆性的产品——Model3,一辆畅销8年仍然极具生命力的新汽车。
  • 任泽平:中国经济发展还有五方面亟待突破

      此外动力系统还支持V2L外放电功能,放电功率为3.3千瓦,支持6.6千瓦,数据和能拓展的功能也都很主流。非常有趣的是,新车的后部遮阳帘还有电影幕布材质可选,户外投影更加简单好用。
  • 建设银行深圳分行又一干部被查,一年来已有多名干部落马

      张志磊作为一个培养起来要花很多资金和精力的大级别拳手,10年来花着自己钱的坚持,才换来今天的成就。
  • 大力发展债券市场意义重大

      基础教育阶段创新人才培养不应是靠超前超纲教学
  • 这种曾被无数科学家放弃的疗法,让接近死亡的她重获新生

      并且,勐焕大金塔也是中国第一金佛塔,亚洲第一空心佛塔。因其建筑具有浓郁的傣族风情,电影《捉妖记3》曾来此取景拍摄,电影中宏伟的大金塔就是这座勐焕大金塔。
  • 民营银行存款利率“迫降”,息差缩窄下注资焦虑待解

      (3)家装供应链的定位:家装供应链建设是家装产品建设的重要组成部分,但不是唯一的组成部分,也不是家装的核心竞争力。目前家装行业的竞争很大程度上陷入了供应链恶性竞争的窠臼。相当一部分装企、企业家的精力主要放在与供应链厂商的价格(利益)博弈上,装企的投入也更多的导向供应链在家装产品中的价值体现。但正如走访调研中看到的,即使装企在某一品类、某一品牌上获得了更多的议价空间,但在市场端,在消费者端,仅就供应链而言,你有大家基本也有,差别就是你的整套价格会有些许优势,但是,就如市场上出现5XX、6XX每平米的整装产品一样,家装市场的竞争远没有到良性竞争的程度,价格是最容易被操作的双刃剑。