免费精品综合导航👅_拔萝卜光-艺文笔记

王金豹 2026年01月14日 05:31:32
发布于:曼谷

免费精品综合导航👅_拔萝卜光_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

(d) A new airworthiness certificate will be issued by the Member State of registry when it is satisfied the aircraft complies with the prescriptions of Part-21.

(e) The Member State shall also issue the airworthiness review certificate valid normally for one year unless the Member State has safety reason to limit the validity.

AMC M.A.904 (a)(1) Airworthiness reviews of aircraft imported into the EU In order to allow for possible participation of authority personnel, the applicant should inform the competent authority at least 10 working days in advance of the time and loca-tion of the airworthiness review. AMC M.A.904 (a)(2) Airworthiness reviews of aircraft imported into the EU 1.   When performing an airworthiness review of aircraft imported into the EU the aircraft and the relevant records should be reviewed to determine the work to be undertaken to establish the airworthiness of the aircraft.

2.   In determining the work to be undertaken during the airworthiness review on the aircraft, the following should be taken into consideration:

(a) the information from third country authorities such as export certificates, pri-mary authority information;

(b) the information on aircraft maintenance history such as continuing airworthi-ness records, aircraft, engine, propeller, rotor and life limited part log books or cards as appropriate, tech log/flight log/cabin log, list of deferred defects, total flight times and cycles, times and cycles since last maintenance, accident history, former maintenance schedule, former AD compliance status;

(c)   the information on aircraft such as aircraft, engine and propeller type certificate datasheets, noise and emission certificate data sheets, flight manual and supple-ments;

(d) the aircraft continuing airworthiness status such as the aircraft and component AD status, the SB status, the maintenance status, the status of all service life limited components, weight and centre of gravity schedule including equipment list;

(e) the modification and repair status of the aircraft detailing elements such as owner/operator designed modifications and repairs, STCs, and parts needing European parts approval (EPA);

(f)   the aircraft cabin configuration such as emergency equipment fitted, cockpit configuration, placards, instrument limitations, cabin layout;

(g) the maintenance needed for import, such  as embodiment of modifications needed to comply with the EASA type certificate, bridging check to comply with the new maintenance programme;

(h) the avionics such as, but not limited to, radio and navigation equipment, instru-ment flight rules (IFR) equipment, digital flight data recorder (DFDR)/cockpit voice recorder (CVR) test, emergency locator transmitter (ELT) 406 MHz code and identification;

(i)   the compass compensation;

(j)   special operating rules such as extended twin-engine operations (ETOPS)/long range operations (LROPS), reduced vertical separation minima (RVSM), minimum navigation performance specifications (MNPS), all weather operations (AWOPS), area navigation (RNAV);

ED 2010/002/R Section A PART-M Subpart I

ED 2008/013/R ED 2010/002/R (k) the aircraft survey including verification of conformity with the flight manual and the datasheet, presence of fire proof identification plates, conformity of markings including registration, presence and serviceability of emergency equipment, internal and external lighting systems, and

(l)   check flight including check of control system/cockpit ground check/engine run up.

3.  If there is no M.A. Subpart G organisation approved for the specific aircraft type available, the competent authority may carry out the airworthiness review in accordance with this paragraph and the provisions M.A.901(h) and M.B.902. In this case, the airworthiness review should be requested to the competent authority with a 30-day notice.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:CONTINUING AIRWORTHINESS REQUIREMENTS – PART M 2

原标题:
3 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 这届世界杯,被骂惨的BOSS直聘还是赢了

      北京家居行业协会常务副会长兼秘书长、产业发展战略及行业评审专家刘晨指出,有供才有需。在家居行业民营企业占比90%以上,让企业在新背景下获得社会认同感、幸福感、获得感、稳定感,企业方能健康发展,提供给消费者更多美好家居生活。大雁奖正是带给企业发展信心的一个重要举措,协会、媒体、企业、品牌只有达成一致认知,助推家居消费持续健康稳定发展。品牌:深挖机遇,融合共赢
  • 锇多少钱一克(2024年03月12日)

      中国科学家首揭水合离子原子级分辨图像及幻数效应可缩短电池充电时间、增大电池功率
  • 沙特电竞世界杯CS项目预选赛官宣

      美股市场延续调整,三大指数涨跌不一,道琼斯工业指数上涨0.12%,纳斯达克指数、标普500指数分别下跌0.41%、0.11%。来源:Wind
  • 易伤新生儿脊椎和大脑的几件事,却有很多妈妈每天都在做!

      李茜认为,红利策略的防御属性或仍是资金的避风港。同时,国内经济在2024年将继续温和复苏,红利策略在稳增长板块暴露较高,或再次成为攻守兼备的标的的重要抓手。
  • 沪深300期指净多持仓略增

      这种崩溃感,你一定懂的。
  • IMF改革后是谁的IMF?

      Ø适老化设施
  • 省庵大师禅诗书法欣赏

      国家高级食品检验师、食品工程中级工程师王思露表示,从大环境来看,金龙鱼所售主要产品的价格会随原材料的价格而改变,而大豆、大豆油及棕榈油等原材料价格的下跌有所回落,在销量增速无法追上价格下落的速度后,营收会出现下滑。对金龙鱼而言,是大公司,而且产业贴合民生,所售产品皆为消费者生活必需品,它的涨价空间不大,所以销售单品的利润自然不会太高,这也许对品牌和企业是一种挑战;加之人口基数并无较大增加,需求量肯定不容乐观,再匹配上同行业的竞争,其实这种双降情况也算合理。
  • OpenAI首次正式回击:马斯克的起诉“令人费解” 可能借机窃取技术

      不过,虽然黄金面临多重利好,但对投资者而言,在短期快速上涨后,也并非没有风险,最主要的风险就在于美联储降息进度的不确定性。
  • 银行理财市场调查:部分理财产品过往业绩展示“报喜不报忧”

      【TechWeb】3月11日消息,据外媒报道,在长期关注苹果的一名资深记者预计苹果今年春季仍不会举行新品发布会,而是直接在官网宣布新品之后一天,也就是当地时间3月4日,苹果公司就在官网以新闻稿的形式,宣布推出搭载M3芯片的新一代MacBookAir,13英寸版和15英寸版同步推出,两款均是在推出之后就开始接受预订,已在上周五开始发货。
  • 鲍威尔没有砸盘,芯片股跌了,但更多的资产在涨!

      无边泳池是近些年来旅游打卡的必去点,海洋标志号也融入了无边的设计——无边泳池天空之眼CovePool和邮轮边缘融为一体,透明的玻璃也让泳池和海面打通了界限,不管是视觉冲击还是拍照分享,邮轮上的无边感,都是作弊一般的存在。
  • 房地产项目“白名单”政策简析

      然后未出道组,上升势头比较好的有一个。
  • 黄金跌破双顶颈线,目标见1217.38

      2016年7月18日,习近平来到固原市原州区万亩冷凉蔬菜生产基地考察。原州区被誉为“中国(西部)冷凉蔬菜之乡”。然而,水资源短缺、利用率不高,以及水利基础设施薄弱等因素曾一度卡住了蔬菜种植这一富民产业的“脖子”。近年来,当地修建了10万至20万立方米大型调蓄水池20座,建成高效节水农业示范基地24处,开发高效节水灌溉土地面积32万亩,这些喷灌水利设施有力促进了蔬菜种植产业的规模化发展,带动当地村民脱贫奔小康。△冷凉蔬菜种植已成为当地的致富产业
  • 黄金突破楔形上轨,目标见1227.30

      惭愧,即要对自己罪业深重,无有出期,生可惭可愧可羞可耻之心。恐怖,即自己起心动念无不是业,以是因缘命终之后必堕地狱、畜生、饿鬼受无量苦,由此应生起恐惧之心。厌离,即对生死轮回、众苦交煎生起厌烦心、出离心。
  • 消费贷 内卷、套路和灰产

      对于理想MEGA外观设计引发的风波,北京市潮阳律师事务所律师胡钢表示,如果是网友自发行为,公民有言论自由的权利,有权对相关商品或者服务作出评论,这些评论包括严厉批评或用“戏谑”手法进行表达,这是公民言论自由的重要表现,而经营者在相关市场具有市场影响力,对消费者评论和网友评论,应该秉持包容和宽容态度。但如果充分证据证明,该行为由相关的其他经营者组织煽动或者推动或者大量转载,是有可能构成诋毁他人商誉的行为,构成一种不正当竞争。