深夜福利✅_智利女议员-艺文笔记

王金豹 2026年01月19日 05:44:48
发布于:曼谷

深夜福利✅_智利女议员_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in para. 3.

 TASK 34-41-00-810-801  Loss of the Weather Radar Information on the ND  1. Possible Causes_______________  - DMC-1 (1WT1)  - DMC-2 (1WT2)  - XCVR-WEATHER RADAR, 1 (1SQ1)  - CTL UNIT-WEATHER RADAR (3SQ)  - MTG TRAY-WR XCVR (9SQ)  - RADOME (1560WM)  R  - XCVR-WEATHER RADAR, 2 (1SQ2)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first  terminal block  - wiring from the DMC1 (1WT1) to the CAPT ND (3WT1)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC2 (1WT2)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to the first  terminal block  - wiring from the DMC2 (1WT2) to the F/O ND (3WT2)  - avionics ventilation  - wiring of the TR1 DATA BUS 1 OUTPUT and the TR1 DATA BUS 2 OUTPUT buses  from the weather radar transceiver 1 (1SQ1) to the first terminal block  - wiring of the weather radar control unit (3SQ)  - wiring of the weather radar transceiver mounting tray (9SQ)  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC1 (1WT1)  R  to the first terminal block  R  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to first terminal  R  block  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC2 (1WT2)  R  to the first terminal block  R  - wiring of the TR2 DATA BUS 1 OUTPUT and the TR2 DATA BUS 2 OUTPUT buses  R  from the weather radar transceiver 2 (1SQ2) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 31-63-34-000-001 Removal of the DMC (1WT1,1WT2,1WT3)  AMM 31-63-34-400-001 Installation of the DMC (1WT1,1WT2,1WT3)  AMM 34-41-00-730-001 System Test of the Weather Radar  AMM 34-41-00-740-002 BITE Test of the Weather Radar  AMM 34-41-12-000-001 Removal of the Weather Radar Control Unit (3SQ)  AMM 34-41-12-400-001 Installation of the Weather Radar Control Unit (3SQ)  AMM 34-41-33-000-004 Removal of the Weather Radar Transceiver (1SQ1, 1SQ2)  AMM 34-41-33-400-003 Installation of the Weather Radar Transceiver (1SQ1,

 1SQ2) AMM 34-41-37-000-001 Removal of the Weather Radar Transceiver Mounting Tray (9SQ) AMM 34-41-37-400-001 Installation of the Weather Radar Transceiver  Mounting Tray (9SQ)  AMM 53-15-11-000-001 Removal of the Radome  AMM 53-15-11-400-001 Installation of the Radome  ASM 31-61/04  ASM 34-41/01

 3. Fault Confirmation __________________  A. Test Do the system test of the weather radar (Ref. AMM TASK 34-41-00-730-001).  4. Fault Isolation _______________ R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,  A. If the weather radar display is not shown or incorrectly shown on the CAPT ND only: - on the center pedestal, on the SWITCHING panel 8VU, set the EIS DMC  selector switch to CAPT/3, and make sure that the weather radar display is correctly shown on the CAPT ND.  (1) If the weather radar display is correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).  (a) If the weather radar display is still incorrectly shown on the CAPT ND with the EIS DMC selector switch at NORM:  - do a check of the wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞34-41-00∞∞∞∞∞∞∞∞∞∞Page 202  Aug 01/05 CES 1 If there is no continuity:

_ - repair the above wiring.  2 If there is continuity: _  - do a check and repair the wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  (2) If the weather radar display is not correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 导航 NAVIGATION 3

原标题:
46 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 彩金贵妃醉酒金币价格今天多少一克(2018年11月07日)

      “孩子们,大雪阻挡了我们来到学校的脚步,但是一点儿也不会阻挡我们对雪花的热爱。你们瞧,窗外大雪纷飞,雪花也飞到了我们的直播间,陪着生字宝宝和你们见面了……”昨天,建华实验学校语文老师金永莉了设置一个情境,让孩子们在情境中愉快地识字学词。
  • 稳增长措施难以扭转下行趋势

      3、锁定期满后,本人转让所持有的发行人股份,应遵守《上海证券交易所上市公司股东及董事、监事、高级管理人员减持股份实施细则》及其他法律法规、中国证监会及上海证券交易所的规定。
  • 2018年熊猫银币价格今天多少一克(2018年11月06日)

      对于普通储户专程赴港存款,多位银行工作人员表示,不建议储户临时换汇去香港高息存款。尽管在香港存款可以获得更高的利息收益,但存款利率并不是唯一的考虑因素,在决定是否赴港存钱时,还需要考虑其他因素,如汇率风险、银行信誉、开户成本等。同时,也需要了解相关的政策和法规。
  • 深度解读!2024年政府工作报告五大看点

      其中,通过深圳证券交易所交易系统进行网络投票的具体时间为2024年3月27日(现场股东大会召开日)9:15一9:25,9:30一11:30和13:00一15:00;通过深圳证券交易所互联网投票系统投票的具体时间为:2024年3月27日9:15-15:00。
  • 女明星上台前的化妆包里都有什么?

      教育要顺应孩子的成长规律。一味做强化训练、加班加点的题海式训练,对孩子创新思维的培养,肯定是没有好处的。社会是不断变化的,新问题层出不穷,孩子必须要有创新的品质,才能适应不断发展的社会需要。
  • 首批中证A50交易型开放式指数基金今天上市

      此外,张咏梅建议文旅部门加强对文创产业的培育扶持,鼓励文创企业与博物馆、研究院合作,与中华传统文化、非遗元素相结合,创造出更多具有现代审美和实用价值的文创产品,让良币驱逐劣币,用“有温度、有态度”的优质文创产品挤压低俗文创产品的生存空间,发挥更大的育人价值。
  • 【欧盘必读】重要信息!卡尼通胀听证清晰沟通 政策阻力开始消失

      无论对于家族还是她个人而言,这就是她最好的选择,也是唯一的选择。
  • 财经首页 | 新浪首页 | 新浪导航

      去年6月,同样是JackLu的团队曾下调对宁德时代的评级至“低配”,彼时摩根士丹利认为地缘政治紧张局势以及不可避免的价格战,使得宁德时代或将面临市场份额和利润率方面的风险,于是将宁德时代的目标价下调16%,至180元。报告发布后,宁德时代单日股价一度下跌超9%。
  • 世界前十:舍夫勒夺冠稳坐第一 阿伯格首进前十

      加强基础研究,归根结底要靠高水平人才。教育部高等教育司相关负责人表示,“基础学科人才特别是拔尖人才是国家长远发展的战略力量。走好基础学科人才自主培养之路,加强基础研究和基础学科人才培养,是主动应对国际竞争、实现高水平科技自立自强的迫切要求。”
  • 武汉,一个标志性的事件发生了!

      “这不仅是由于跨境电商在推动外贸转型升级、构建开放型经济新体制方面的重要作用,更在于其对于激发市场活力、促进消费升级的深远影响。跨境电商的蓬勃发展,在为中小企业提供更广阔国际市场的同时,也为消费者带来更多元化、更高品质的商品选择。政府工作报告的持续关注,无疑为跨境电商的进一步发展注入强大动力。”朱克力表示。
  • 周冬雨蹲路边吃盒饭超爆笑 带一群跟班大佬范儿足

      3、项目实施地点:印尼中爪哇省德马克市佳腾工业园
  • 维密大秀确认重启,但性感天使不再是主角

      3月5日,十四届全国人大二次会议在人民大会堂开幕,国务院总理李强在政府工作报告中再一次提及“跨境电商”。
  • 罕见6家IPO企业密集主动撤单!意味着什么?吴清主席刚刚强调绝不能以圈钱作为目的IPO

      此次发现有何重大意义?科研人员解释,毫秒脉冲星是每秒自转上百次的特殊中子星,对其研究不仅有望对理解中子星演化、奇异物质状态起到重要作用,而且稳定的毫秒脉冲星是低频引力波探针。脉冲星搜索是进行引力波探测研究的基础,脉冲星计时阵是观测超大质量双黑洞发出的引力波最有效的方法。脉冲星计时阵依赖数十颗计时性质良好的毫秒脉冲星,其样本的扩大、性能的提高起始于脉冲星搜索。此次FAST首次发现毫秒脉冲星,展示了FAST对国际低频引力波探测做出实质贡献的潜力。FAST项目组已经策划的FAST多科学目标同时巡天规划将发现大量毫秒脉冲星,大幅度提高脉冲星阵探测引力波的灵敏度。