天堂岛精品🔇_免费天天看剧-艺文笔记

王金豹 2025年11月13日 01:01:16
发布于:曼谷

天堂岛精品🔇_免费天天看剧_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific blanking caps  No specific blanking plugs  No specific circuit breaker(s) safety clip(s)  No specific platform 3.5 m (11 ft. 6 in.)

 B. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized  Configuration before Maintenance Action  52-41-00-010-001 Open the APU Doors for Access  49-51-13-991-001 Fig. 401

 3. Job Set-up __________ Subtask 49-51-13-860-050  A. Aircraft Maintenance Configuration  (1)  Energize the ground service network (Ref. TASK 24-41-00-861-002).

 (2)  On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is OFF.

 (3)  Put the warning notices on panel 25VU to tell persons not to start the APU.

 (4)  Make sure that hydraulic systems are depressurized  (Ref. TASK 29-00-00-864-001).

 Subtask 49-51-13-865-050  B. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41  Subtask 49-51-13-010-050  C. Get Access  (1)  Put the platform below the APU access doors.

 (2)  Open the APU access doors 315AL, 316AR and safety them in the open position (Ref. TASK 52-41-00-010-001).

 (3)  Set the LIGHT control switch 11LJ to the on position.

 4. Procedure _________  (Ref. Fig. 401/TASK 49-51-13-991-001) Subtask 49-51-13-020-050  A. Removal of the Pneumatic Sensor Assy  (1)  Disconnection of the electrical connectors (15) and (17).

 (a)  Disconnect the electrical connectors (15) and (17) from the total pressure transducer and differential pressure transducer.

 (b)  Put blanking caps on the disconnected electrical connectors.

 (2)  Disconnect the tube (13) from the static sensor assy (11).

 (a)  Remove and discard the lockwire from the bolt (3).

 (b)  Remove the bolt (3), the washer (2) and the retainer (1) from the static sensor assy (11).

 (c)  Move the hose (13) away from the static sensor assy (11).

 (d)  Remove and discard the packing (12).

 (e)  Put blanking plugs on the disconnected hose end.

 (3)  Disconnect the pneumatic sensor assy (14) from the bleed duct

 (a)  Remove the bolt (4) from the bracket assy (9).

 (b)  Remove the bolts (6) NOTE : After the removel of the bolts (6) the flow sensor (7) is

____ only kept in position through the tubes (5) and (8).

 (c)  Remove the bolt (10) connecting the bracket assy (9) to the bleed duct.

 NOTE : Prevent a uncontrolled movement of the pneumatic sensor ____ assy (14) after the removal of the bolt (10).  (4)  Remove the pneumatic sensor assy (14).

 (5)  Remove and discard the gasket (16).

 Pneumatic Sensor Assy Figure 401/TASK 49-51-13-991-001  R  EFF :  001-003, 051-099, 401-499,  49-51-13 Page 404 Aug 01/05  CES 

 TASK 49-51-13-400-001  Installation of the Pneumatic Sensor Assy (GTCP 36-300)

 1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific  Torque Wrench : range 0.00 to 1.20 m.daN  (0.00 to 9.00 lbf.ft)  B. Consumable Materials  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER5

原标题:
71 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 美尔雅期货:豆粕弱势依旧 隐波持续高位

      1、本次公司控股子公司拟为参股房地产项目公司提供的预计新增担保金额合计不超过32,110万元,自股东大会审议通过后十二个月内有效。具体详见预计新增担保额度情况表。
  • 纽约黄金期货价格周一走高

      这些平台会“病毒式”地分享朋友圈,拉目标客户进群,然后每天在群里发些文章和信息,拉拢大家买服务,简历修改普通是100-400元,专业HR(人力资源管理)帮做就是500-1000元。定向实习岗位依据不同情况定价,普通券商1万-2万元,名气越大的价格越高,比如某中字头券商内推价格4.5万元,表现好的有留用空间;国内顶级的投行实习岗位是6万元,保证实习3个月。
  • 刘涛绿洲晒自拍照状态佳 清新薄荷绿皮衣飒气十足

      天眼查显示,被曝光的代收代储企业阔海米业成立于2015年10月,法定代表人、董事长兼总经理为吴志华。股权全景穿透图显示,该公司由上海阔海投资有限公司全资子公司海伦阔海粮油有限公司及两名自然人共同持股。除阔海五常米业外,吴志华还关联多家粮油公司,并在益海嘉里(哈尔滨)粮油食品工业有限公司、益海嘉里(沈阳)粮油食品工业有限公司等多家金龙鱼旗下公司任高管。
  • 仍需警惕美联储加息预期改变

      线下大面积撤柜
  • 财经首页 | 新浪首页 | 新浪导航

      TheRow诞生于美国,创立于2006年,由双生设计师AshleyOlsen与Mary-KateOlsen共同打造的,是一个以廓型利落,兼具高品质与易穿性,低调而又不失格调的服装品牌。
  • 我们来到重生工作室总部,体验了APEX的全新赛季

      关于教师法修订,我还提出教师的岗位津贴应调整。教师教龄津贴等,仍是20年前的标准,已不适应当前的社会经济发展。同时,我还提出,教师严重违反师德师风,或是从事有偿校外培训的,应该辅以相应的一些问责机制,甚至实行退出机制。
  • OpenAI首次正式回击:马斯克的起诉“令人费解” 可能借机窃取技术

      芝加哥联储主席古尔斯比表示,他预计随着通胀进一步降温,政策制定者今年将下调利率。古尔斯比此前在接受采访时表示,去年通胀大幅改善,但美联储需要将其恢复到2%的目标。“随着通胀下降,利率限制性程度将减弱。”古尔斯比说,在通胀回落到2%的水平之前,美联储现在不可能改变2%的目标。美联储关注的是通胀率,而不是物价水平。古尔斯比的讲话是美联储官员在进入3月会议“噤声期”前的最后一次计划性讲话。
  • I人才懂的北欧浪漫

      “可以这样构想一下,我还在做别的工作或是休息,在一个类似元宇宙的空间里,我的AIAgent(代理)与另外一位创业者的AIAgent相遇,它们聊的很开心,或许等我醒过来,我的AIAgent就拿着对方的商业计划书来给我看了。”
  • AMD再创历史新高

      同频共振,传播盛会好声音。本届链博会新浪VR充分利用自身优势,力争集中精力做好首届中国国际供应链促进博览会报道、传播工作。
  • 国产电影为什么难出海?

      她接手的500亿,既是可以让她生活无忧的巨额财富,也是容易阻碍她发展向前的包袱,
  • 新浪&微博2024国际教育春季巡展正式启动

      更多猛料!欢迎扫描左方二维码关注新浪新闻官方微信(xinlang-xinwen)相关新闻加载中点击加载更多
  • 中国宁波一号主场加冕 再捧世界冠军奖杯

      张齐说,建议将普惠托育纳入基本公共服务,以中央财政补助资金作为支持,推动地方落实属地管理责任,缓解入托难、减轻入托贵,增强托得好的信心。国家要求把积极应对人口老龄化融入各项公共政策制定中,保证适度生育水平才能从根源上解决老龄化问题,托育服务是要解决愿意生、有人养的问题。
  • 纽约联储调查显示长期通胀预期上升 美联储可能遇到麻烦

      然而,在一部分消费人士看来,贝玲妃始终与消费者喜好产生错位。