国产自拍👅_老女人下面毛荫荫的黑森林-艺文笔记

王金豹 2025年11月12日 09:51:19
发布于:曼谷

国产自拍👅_老女人下面毛荫荫的黑森林_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

B. Aircraft Maintenance Configuration  (1)  Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)  Do the EIS start procedure (ECAM only) (Ref. TASK 31-60-00-860-001).

 4. Procedure _________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,  (Ref. Fig. 501/TASK 28-24-00-991-002)  **ON A/C 301-399,

 (Ref. Fig. 501A/TASK 28-24-00-991-002-A)  **ON A/C ALL

 Subtask 28-24-00-865-063  A. Make sure that this(these) circuit breaker(s) is(are) closed:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/LP VALVE/MOT1/ENG2 2QG A09  49VU FUEL/LP VALVE/MOT1/ENG1 1QG A08 121VU FUEL/LP VALVE/MOT2/ENG2 4QG M26 121VU FUEL/LP VALVE/MOT2/ENG1 3QG M25  1EFF : ALL 1 28-24-00Page 505 1 1 Aug 01/05 1 1 1CES 1 Subtask 28-24-00-710-053

 B. Test of the Valve 12QM valve  -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 2 SUPPLY and  circuit breaker 3QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL pushbutton  - the FUEL system page shows  switch (P/BSW).  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 2 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 3QG.  6. On the panel 49VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 1 SUPPLY and  circuit breaker 1QG.  CONTROL are isolated.  On the ECAM lower DU:  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  7. On the panel 115VU:  On the ECAM lower DU:

 1EFF : ALL 1 28-24-00Page 506 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT ------------------------------------------------------------------------------- - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  8. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  9. On the panel 49VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 1 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 1QG.  Subtask 28-24-00-710-054  C. Test of the Valve 13QM

 -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 2 LP valve MOTOR 2 SUPPLY and  circuit breaker 4QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL P/BSW.  - the FUEL system page shows  - the RIGHT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:

 1EFF : ALL 1 28-24-00Page 507 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUEL 燃油4

原标题:
24 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • AI巨头英伟达突现高位跳水

      楼盘规划—舒适度
  • 黄金市场分析:鲍威尔继续放鸽 金价创高脚步不停

      提及苹果汽车,我们会说它已经持续了十年。因为时间是从2014年苹果在内部确立“泰坦计划”时算起的。
  • “爸爸,我宁愿你找个保姆”12岁女儿写给父亲的信,刷爆了朋友圈!

      李鸣涛认为,受综合因素的影响,当前线下实体经济面临很大的挑战,原材料价格上涨、物流中断、生产受阻、需求不振、资金周转不畅等不利因素叠加,困境中的企业迫切需要找到突破口。“618”大促给了品牌企业一次“浴火重生”的机会,企业一方面可以快速消化库存、回笼资金,另一方面可以利用“618”的消费趋势掌握需求变化的节奏和特点,及时调整产品、优化供给,更好满足后疫情时代的市场需要。
  • 外交部:期待并鼓励中美两国人民多往来多交流

      跟着小编一起揭幕。。。。。。!
  • 泰国女排换帅达奈辞职 纳塔蓬接手维拉万出任助教

      亿资石油:前海油连阳后面临调整谨慎关注上升趋势线支撑19:21欧元区和美
  • 爱马仕称将每年进入一座中国新城市开店

      而这些团队背后,是天津乐境建立的三层次人才保障体系——充分挖掘、利用系统内部资源,与保险职业学院开设康养护理学院,培养健康养老领域专业人才,按需输送养老服务专业对口毕业生;充分拓展天津及周边的人才供给渠道,与天津中医药大学护理学院、天津医学高等专科学校签署战略合作协议,建立长期合作关系;通过标准化的培训体系,提升和巩固员工自身的专业水平、服务意识,为长者们营造高质量的幸福生活。
  • 征信业的未来在于合作与规范

      强大的中央银行是金融强国的核心支柱。由于关键货币的国际信用具有极其重要的影响,其中央银行在某种程度上类似于全球的中央银行。强大的货币与强大的中央银行之间相辅相成,强大的货币是本国中央银行成为全球具有重要影响力的中央银行的基础和前提,而本国中央银行的强大信用和有效管理则成为强大的货币的支撑和保证。20世纪80年代初,我国建立了中央银行制度,并颁发了《中国人民银行法》等一系列相应的法律法规来加以规范。40年来我国中央银行制度从无到有不断完善,中央银行在稳定经济增长、保持币值稳定、有效控制金融风险和平衡国际收支等目标上发挥十分关键的作用。建立强大而完善的中央银行是未来的重要任务。一是完善货币供应调控机制,形成中央银行调节银行货币创造的流动性、资本和利率约束的长效机制。二是构建金融有效支持实体经济的体制机制,在宏观层面搞好跨周期政策设计,以现代化的货币管理促进经济高质量发展。三是建设推进金融双向开放的相关机制,提高参与国际金融治理能力,积极参与国际金融规划的制定。
  • 《守望先锋2》星际牛仔联动发布游玩预告演示

      位于河南巩义的民营上市公司恒星科技3月11日涨停。就超聚变事宜,公司证券部相关人士对界面新闻表示,没有接收到相关消息,“据了解,目前公司与超聚变应该是没有合作”。
  • 任泽平:当前形势下财政政策大有可为

      2015年,IDG领投了SheIn3亿元的B轮融资,此番重注让IDG手中握有极多筹码。若如市场传闻所言SheIn即将在美IPO,那么这笔近年来规模最大的IPO将为IDG带来百亿美元级别的账面回报。
  • 北京——京熙润府丨楼盘测评

      激发青少年好奇心、想象力、探求欲,培育具备科学家潜质、愿意献身科学研究事业的青少年群体,需要在教育“双减”中做好科学教育加法。
  • 从臭名昭著到片酬一亿美金,这男的有多狠?

      在吴月看来,贵金属相关业务指标近期完成得特别快。此前借着“龙年黄金”“银行购金打金镯”的热度,已有部分客户购入实体黄金。现在金价狂涨背景下,部分客户基于投资需求,也更容易选择买入积存金。
  • 消息称高瓴、博裕等公司有意投资万国数据的亚洲数据中心

      据悉,捷途旅行者混动版车型正式定名捷途山海T2,新车将在今年4月的北京车展前后上市。
  • 地方财政问题是投资者心中隐忧

      除了美联储降息这一大背景之外,中国因素也在此轮黄金行情中扮演了重要角色。2023年12月9日,沈阳,市民在一家黄金饰品店选购黄金饰品。当日,中国黄金黄金价格608元/克。(图|视觉中国)