国内精品♨️_超碰成人区-艺文笔记

王金豹 2026年01月19日 04:33:32
发布于:曼谷

国内精品♨️_超碰成人区_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

R TASK 24-22-00-810-823 R Failure of the GLC 1 or Loss of its Status Indication R 1. Possible Causes _______________ R - GCU-1 (1XU1) R - RELAY (20XU) R - GLC-1 (9XU1) R - wiring R 2. Job Set-up Information ______________________ R A. Referenced Information R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R ------------------------------------------------------------------------------- R AMM 24-22-34-000-001 R AMM 24-22-34-400-001 R AMM 24-22-55-000-001 R AMM 24-22-55-400-002 R R AMM 24-41-00-740-002 R ASM 24-22/02 R 3. Fault Confirmation __________________ R A. Test Removal of the GCU-1(2) (1XU1, 1XU2) Installation of the GCU-1(2) (1XU1, 1XU2) Removal of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Installation of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Operational Check of GAPCU via CFDS

R (1) Do the BITE test of the GAPCU (Ref. AMM TASK 24-41-00-740-002).

R (a) If the BITE test gives the message TEST FAILED: R - do the trouble shooting given in Para 4.A. R (b) If the BITE test gives the message TEST PASSED:

R - do the trouble shooting given in Para 4.B. R 4. Fault Isolation _______________ R A. If the BITE test gives the message TEST FAILED: R - push the line key adjacent to the TEST FAILED message.

R (1) If the maintenance message GCU1 (1XU1) comes into view: R - replace the GCU-1 (1XU1) (Ref. AMM TASK 24-22-34-000-001) and (Ref. R AMM TASK 24-22-34-400-001).

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : 401-499, ∞∞24-22-00∞∞∞∞∞∞∞∞∞∞Page 265  Aug 01/05 CES

R  B. If the BITE test gives the message TEST PASSED:  R  - do a check of the wiring (Ref. ASM 24-22/02) for an open circuit  R  between:  R  . pin 2 of the ELEC/GCU1 circuit breaker (2XU1) and pin A/B of the  R  function relay (20XU)  R  . pin A/3 of the function relay and pin B/18 of the GLC 1 (9XU1)  R  . pin B/20 of the GLC 1 and pin A/29 of the diode module module 2420VD  R  . pin A/14 of the diode module 2420VD and pin A/6A of the GCU 1.  R  - do a check of the contacts for correct operation of the function relay  R  (20XU) and the GLC 1 (9XU1) (Ref. ASM 24-22/02) between:  R  . pins A/B and A/3 of the function relay (normally closed)  R  . pins B/18 and B/20 of the GLC 1 (normally closed).  R  (1) If the wiring or the contacts are not correct:  R  - repair or replace the wiring as necessary  R  - replace the RELAY (20XU) as necessary  R  - replace the GLC-1 (9XU1) (Ref. AMM TASK 24-22-55-000-001) and (Ref.  R  AMM TASK 24-22-55-400-002) as necessary.  R  (2) If the wiring or the contacts are correct:  R  - replace the GCU-1 (1XU1) (Ref. AMM TASK 24-22-34-000-001) and (Ref.  R  AMM TASK 24-22-34-400-001).  R  C. Do the test given in para. 3.

R TASK 24-22-00-810-824

R Failure of the GLC 2 or Loss of its Status Indication R 1. Possible Causes _______________ R - GCU-2 (1XU2) R - GLC-2 (9XU2) R - wiring R 2. Job Set-up Information ______________________ R A. Referenced Information R -------------------------------------------------------------------------------R REFERENCE DESIGNATION R ------------------------------------------------------------------------------- R AMM 24-22-34-000-001 R AMM 24-22-34-400-001 R AMM 24-22-55-000-001 R AMM 24-22-55-400-002 R R AMM 24-41-00-740-002 R ASM 24-22/03 R 3. Fault Confirmation __________________ R A. Test Removal of the GCU-1(2) (1XU1, 1XU2) Installation of the GCU-1(2) (1XU1, 1XU2) Removal of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Installation of the Contactors (9XU1, 9XU2, 11XU1, 11XU2) Operational Check of GAPCU via CFDS

R (1) Do the BITE test of the GAPCU (Ref. AMM TASK 24-41-00-740-002).

R (a) If the BITE test gives the message TEST FAILED: R - do the trouble shooting given in Para 4.A. R (b) If the BITE test gives the message TEST PASSED:

R - do the trouble shooting given in Para 4.B. R 4. Fault Isolation _______________ R A. If the BITE test gives the message TEST FAILED: R - push the line key adjacent to the TEST FAILED message.

R (1) If the maintenance message GCU2 (1XU2) comes into view: R - replace the GCU-2 (1XU2) (Ref. AMM TASK 24-22-34-000-001) and (Ref. R AMM TASK 24-22-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 电源 3

原标题:
80 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 又有董秘“喊冤”:我只是个小小的董秘啊

      综合而言,国寿嘉园·天津乐境位于天津空港经济区,交通位置便利,设施安全完善,服务优质专业。社区从个人-家庭-邻里-社区-社会打造“五层交往空间”,相关配套、活动及服务较为齐全,可以满足不同阶段长者需求。特别是,整体建筑与室内设计和谐统一、柔和明快,长者生活区楼层较低且房间均在阳面,将长者的生活舒适度与安全性放在第一位,将专业化、精细化持续照料打造为自己的鲜明特色。
  • 阿汤哥领跑金酸梅奖提名

      中低端新能源汽车市场,消费者对价格相对敏感,虽然比高端市场受众更广泛,但也面临着供给侧供给过剩、竞争激烈、同质化严重的问题。
  • 常常“鸡飞狗跳” 家长和孩子“手机争夺战”如何平息

      后排支持4:6可放倒座椅,增大行李箱空间,可拓展至1320L。
  • 反弹空间巨大,白银年底将展现强势

      其实红色在当下各大社媒形成流行趋势,在中西方文化语境中皆有迹可循。红色之于国人的特殊意义早已根深蒂固,既是节日中辞旧迎新的重要色彩元素,代表着欢庆与幸运;而在西方视角下,红色元素同样象征着爱与能量,借由此番红色裤袜的热潮,人们也再一次找到传递积极态度的载体。
  • 解放军和武警部队代表团新闻发言人答记者问

      这种现象对北京传统品牌家装企业形成不小的冲击,首先,传统家装企业的获客成本往往较高,而“家装新势力们”往往依托于原有平台或国企背书,在获客资源、成本上优势明显;同时,市场环境在变,家装群体也在变,年轻刚需家装群体消费具备集中性、爆发性,兼具消费价格的明确区间属性,也助推家装新势力可以在较短时间内迅速赢取可观的市场份额。
  • 期货市场急需衍生品专业人才

      “戚老师太为事业而不顾一切了,因为我不是这样的人,所以直觉让我不喜欢,但是这种不喜欢肯定不会完全取代所有,我同时觉得这是一个好的创作机会,这个矛盾心理肯定是有的,但是至今为止我还是不太喜欢戚老师。”
  • 黄金ETF成交量创新高,黄金触底信号强烈

      东海证券指出,作为高技术壁垒行业,近年来国内创新药企在新技术、新靶点、新赛道、国际化等多方面都取得了积极进展,当前医药生物行业估值处于历史低位,投资价值显著。建议关注创新药、特色器械、连锁药店、品牌中药、医疗服务、二类疫苗、血制品等板块。
  • 全球风险资产哀鸿遍野 瑞信暴跌 开始向瑞士央行求救

      在这个节目中,热爱越剧的观众一定会感受到跨越40年的两代越剧名家的传承,时隔40年才有新的人气王出现,是否意味着人才涌现的速度慢了一些?何赛飞却有不同的看法,“我觉得应该感谢老的观众对我们的记忆,也感谢眼前年轻的观众对我们的喜欢、不嫌弃我们,不是说你们那么老了,我才不要看,我只要看年轻人,观众还是接纳我们,应该是感谢。”
  • 普拉达将推进旗下鞋履产品全自动化生产

      上述减持期间届满后,量吉投资及其一致行动人淳康投资“无缝衔接”继续减持;达嘉维康同日公告称,量吉投资及其一致行动人淳康投资拟继续减持不超6%公司股份。
  • 爱奇艺的盈利是“昙花一现”还是永续?财报透露了哪些“玄机”

      如果说《三体》是关于宇宙最狂野的想象,那《三体立体书红岸基地》就是将这份想象转化为了可触摸、可视化的阅读体验。这本书采用全景展开的装帧方式,还原从大兴安岭林场、红岸基地、到齐家屯的整个地图,全书展开后近1.5平方米,小立体页和丰富有趣的互动机关则暗藏细节,使故事结构更为完整。为了确保立体书最终呈现出来的效果,在做立体纸艺设计的时候,施镇宇挑战立体纸艺结构画幅极限,创新性采用二段式结构,搭建出约0.5米高的红岸基地巨型天线,带来震撼的阅读体验。
  • 【图解】新质生产力概念热议,17.8亿资金追高工业富联

      活力长者居室、卫生间内以及照护区长者床边均配置有紧急呼叫拉绳,较大限度地保证长者安全。
  • 利好!万亿土豪,盯上中国资产!

      从蔚来在过去两个月的表现来看,由于目前正处于产品迭代的周期,销量主力的ES6和ET5并没有表现出足够的长销能力。因此,尽管四季度才大规模交付,阿尔卑斯仍可以被视为全村的希望。
  • 药明康德回购股份提振信心,海外生物医药研发景气度复苏

      3月7日,SELA一口回绝了中国方面的报价,现场没有说明理由,但其实也给出了理由,那就是——中方给出的价格和比赛不匹配。