深夜福利✅_国产情侣2020免费视频-艺文笔记

王金豹 2026年01月04日 21:26:25
发布于:曼谷

深夜福利✅_国产情侣2020免费视频_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

TASK 27-61-00-840-802 5. Put the Spoiler Systems A and B Back to the Condition Before the Pressure Removal (Figure 201, Figure 202) A. References Reference Title 12-12-00-610-801 Hydraulic Reservoir Servicing (P/B 301) SWPM 20-60-03 Standard Wiring Practices Manual B. Tools/Equipment NOTE: When more than one tool part number is listed under the same "Reference" number, the tools shown are alternates to each other within the same airplane series. Tool part numbers that are replaced or non-procurable are preceded by "Opt:", which stands for Optional. Reference Description SPL-1675 Assembly - Lock, Flight Controls (Part #: F80049-18, Supplier: 81205, A/P Effectivity: 737-100, -200, -200C, -300, -400, -500, -600, -700, -700C, -700ER, -700QC, -800, -900, -900ER, -BBJ) (Opt Part #: F80049-12, Supplier: 81205, A/P Effectivity: 737-100, -200, -200C, -300, -400, -500, -600, -700, -700C, -700ER, -700QC, -800, -900, -900ER, -BBJ) C. Consumable Materials Reference Description Specification G50171 Compound - Corrosion Inhibiting Compound, Interior Application - D5026NS or ZC-026 D. Location Zones Zone Area 133 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Left 134 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Right 210 Subzone - Control Compartment - Body Station 178.00 to Body Station 259.50 E. Procedure SUBTASK 27-61-00-080-002 (1) Remove the flight controls hydraulic module locks from the spoiler shutoff valves. (a) Remove the lockpins. (b) Remove the lock, SPL-1675 from the two spoiler shutoff valves. (c) Put the manual override lever at the two spoiler shutoff valves in the position 1 (ON position). (d) Before you connect the electrical connector, examine the connector for corrosion. 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-61-00 Page 209 Oct 10/2007 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details WARNING: DO THE STEPS BELOW IF THE AIRPLANE OPERATES AT AIRPORTS WHERE DEICING FLUID THAT CONTAIN POTASSIUM FORMATE IS USED. ALSO DO THE STEPS FOR ALL AIRPLANES THAT YOU FOUND CORROSION IN THE ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL. THE ELECTRICAL CONNECTOR IS PART OF A SYSTEM THAT IS NECESSARY FOR SAFE FLIGHT. (e) If there was corrosion, refer to (SWPM 20-60-03) to correct the problem. (f) Apply the D5026NS or ZC-026 compound, G50171 to the connector (SWPM 20-60-03) (g) Connect the electrical connector to the spoiler shutoff valve at the spoiler hydraulic modules A and B. SUBTASK 27-61-00-860-011 (2) Set the SPOILER A and B switches on the forward overhead panel to the ON position. SUBTASK 27-61-00-860-012 (3) Remove the safety tag and close this circuit breaker: F/O Electrical System Panel, P6-2 Row Col Number Name B 12 C00204 FLIGHT CONTROL SHUTOFF VALVES SPOILER SUBTASK 27-61-00-860-013 (4) Pressurize the hydraulic reservoirs if it is necessary. To pressurize them, do this task: Hydraulic Reservoir Servicing, TASK 12-12-00-610-801. ------------------------- END OF TASK --------------------------- 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-61-00 Page 210 Oct 10/2007 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details SPOILER CONTROL SYSTEM - ADJUSTMENT/TEST 1. General A. This procedure has these tasks: (1) Spoiler Control System Operational Test (a) This test can be used to quickly give the status of the spoiler control system. This test can be done without special tools or equipment. (2) Spoiler Control Cables Adjustment (3) Ratio Changer Input Rod Adjustment (4) Flight Spoiler Adjustment (a) An adjustment of the clearance between the flight spoilers and the flaps. (5) Spoiler Actuator Linkage Adjustment (6) Spoiler Mixer Adjustment (7) Spoiler Position Sensor Adjustment (a) This is an adjustment and test of the operation of the spoiler position sensors No. 3 and 10. (8) Flight Spoiler System Test (a) This is a test of the operation of the flight spoilers No. 2, 3, 4, 5, 8, 9, 10, and 11. (9) Spoiler Manual Operation Test (10) Spoiler Operation Time Test (11) Alternate Spoiler Position Sensor Test (a) This is a test of the operation of the spoiler position sensors No. 4 and 9. (12) Spoiler Mixer No-Back Assembly Test (13) Spoiler Mixer Centering Mechanism Operational Test B. The spoiler control system gives lateral control and speed brake signals to the flight spoiler   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-600-700-800-900 飞机维护手册6 AIRCRAFT MAINTENANCE MANUA

原标题:
73 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 王俊凯3条破亿微博转发近6亿 超人气偶像创纪录

      强大的金融机构是金融强国实际功能的主要构成部分。金融强国通常拥有规模和质量处于全球前列的商业银行、投资银行、保险公司和信托公司的金融机构体系。第二次世界大战以来,美国的商业银行和投资银行长期处在全球的前列,日本的商业银行一度赶上后又掉队。直到今天,美欧日的金融机构依然处在全球重要地位,尤其是美国的金融机构总体上仍处在强势状态。经过加入世界贸易组织后大刀阔斧的改革,中国的银行业迅速崛起,截至2022年末,资产规模合计约45.9万亿美元,为美国银行业的1.95倍。但就总资产而言,中国金融体系大致相当于美国的70%左右。中国的银行业虽大,但在全球的影响力相对有限,因其业务国际化程度偏低,产品和服务的国际竞争力较弱。相比美国十分发达的资本市场和证券业,我国的证券业和投资银行发展相对滞后。据统计,美国拥有世界上规模最大的资本市场,股市总市值超过46万亿美元,占全球股市总市值的42.5%。而中国股市总市值仅占10.6%,为美国的1/4左右,且发展步线较慢。保险业和信托业发展状况与国际先进水平相比亦有不小的差距。可见,中国的金融机构除银行业外,既不大,也不强,离金融强国所需要的强大金融机构体系要求尚有不小的差距。未来,需按照市场化、法治化、国际化原则,健全具有高度适应性、竞争力、普惠型的现代金融机构体系。
  • 外墙漏水,怎么办?

      美国《国家利益》双月刊网站3月7日发表题为《美国空军的新任务:不惜一切代价在战争中击败中国》的文章,作者是约翰·维纳布尔。全文摘编如下:
  • AETOS艾拓思:戴利讲话助美元大涨非美货币集体重挫

      原本中国团队的想法是,赛事由国内买下来,然后在抖音付费直播,此前两战乔伊斯的比赛,都是这么操作的。张志磊甚至愿意自己掏腰包,然后靠国内平台转播时卖观看劵(类似于国外的PPV)付费,抹平这一成本。
  • 港媒称中国上周再次发射东风41洲际导弹

      多家公司火速开始执行回购
  • 外资大行研判:逢低布局A股正是良机

      赛轮集团股份有限公司
  • 习近平三次来到宁夏 对这件“小事”很挂心

      除了美联储降息这一大背景之外,中国因素也在此轮黄金行情中扮演了重要角色。2023年12月9日,沈阳,市民在一家黄金饰品店选购黄金饰品。当日,中国黄金黄金价格608元/克。(图|视觉中国)
  • 中国旅游消费较多的低龄健康老年人将超过1亿

      ——习近平2020年11月14日在全面推动长江经济带发展座谈会上发表的讲话
  • 拜登,突然警告!又要对人工智能出手了!

      或许,前夫哥们该向贾乃亮取取经了。
  • 五月天是否假唱,权威认定很有必要

      道指涨46.97点,涨幅为0.12%,报38769.66点;纳指跌65.84点,跌幅为0.41%,报16019.27点;标普500指数跌5.75点,跌幅为0.11%,报5117.94点。
  • 上海二手房火了!月成交近两万套,中介机构称每天入职七八十个员工

      此外,“双减”背景下,如何探索出一条低负担、高质量的素质教育路径,是很多中小学关心的问题。对此,刘希娅分享了谢家湾学校的发展经验,并表示优秀的教师队伍、科学合理的课程设计安排,以及好的学校生活体验是关键。
  • 上海理工:给“青椒”腾出成长空间

      (2)35家品牌装企中,在政策出台后,真正利用政策开展促家装消费推动的企业也只有4家,具体做法也更多的是企业自身的推动行为,政策利好尚未落实到企业和消费者身上,在谈及这个问题时,22家企业的主要领导都不约而同的提到一个焦点:政策很好,营造的政策环境也很好,但就是不知道这些政策怎么落地,怎么让家装消费者、家居消费者,让家装企业、家居企业感受到政策的巨大推动力,激发消费者的消费意愿。
  • 刚当上老大轰35+11+6!真搞不懂会有人不服他

      但这场葬礼并不悲伤。马斯克在X平台上转发新闻并配了一个“致敬”和“点烟”的表情包;社交媒体充斥着欢迎苹果拥抱AI的贺信;苹果股价在当天还涨了0.81%。
  • 政府手上还有哪些牌?

      3月11日,全新一代JCWCOUNTRYMAN在国内迎来了正式上市。官方零售价格为39.98万元。新车是首个佩戴全新JCW品牌标识的MINI车型,标识中经典的黑、红、白配色及赛车方格旗图腾,非常好地体现了MINI品牌的历史以及独特的社群文化。