国内精品♨️_智利女歌手-艺文笔记

王金豹 2026年01月14日 21:33:54
发布于:曼谷

国内精品♨️_智利女歌手_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in para. 3.

 TASK 34-41-00-810-801  Loss of the Weather Radar Information on the ND  1. Possible Causes_______________  - DMC-1 (1WT1)  - DMC-2 (1WT2)  - XCVR-WEATHER RADAR, 1 (1SQ1)  - CTL UNIT-WEATHER RADAR (3SQ)  - MTG TRAY-WR XCVR (9SQ)  - RADOME (1560WM)  R  - XCVR-WEATHER RADAR, 2 (1SQ2)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first  terminal block  - wiring from the DMC1 (1WT1) to the CAPT ND (3WT1)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC2 (1WT2)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to the first  terminal block  - wiring from the DMC2 (1WT2) to the F/O ND (3WT2)  - avionics ventilation  - wiring of the TR1 DATA BUS 1 OUTPUT and the TR1 DATA BUS 2 OUTPUT buses  from the weather radar transceiver 1 (1SQ1) to the first terminal block  - wiring of the weather radar control unit (3SQ)  - wiring of the weather radar transceiver mounting tray (9SQ)  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC1 (1WT1)  R  to the first terminal block  R  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to first terminal  R  block  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC2 (1WT2)  R  to the first terminal block  R  - wiring of the TR2 DATA BUS 1 OUTPUT and the TR2 DATA BUS 2 OUTPUT buses  R  from the weather radar transceiver 2 (1SQ2) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 31-63-34-000-001 Removal of the DMC (1WT1,1WT2,1WT3)  AMM 31-63-34-400-001 Installation of the DMC (1WT1,1WT2,1WT3)  AMM 34-41-00-730-001 System Test of the Weather Radar  AMM 34-41-00-740-002 BITE Test of the Weather Radar  AMM 34-41-12-000-001 Removal of the Weather Radar Control Unit (3SQ)  AMM 34-41-12-400-001 Installation of the Weather Radar Control Unit (3SQ)  AMM 34-41-33-000-004 Removal of the Weather Radar Transceiver (1SQ1, 1SQ2)  AMM 34-41-33-400-003 Installation of the Weather Radar Transceiver (1SQ1,

 1SQ2) AMM 34-41-37-000-001 Removal of the Weather Radar Transceiver Mounting Tray (9SQ) AMM 34-41-37-400-001 Installation of the Weather Radar Transceiver  Mounting Tray (9SQ)  AMM 53-15-11-000-001 Removal of the Radome  AMM 53-15-11-400-001 Installation of the Radome  ASM 31-61/04  ASM 34-41/01

 3. Fault Confirmation __________________  A. Test Do the system test of the weather radar (Ref. AMM TASK 34-41-00-730-001).  4. Fault Isolation _______________ R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,  A. If the weather radar display is not shown or incorrectly shown on the CAPT ND only: - on the center pedestal, on the SWITCHING panel 8VU, set the EIS DMC  selector switch to CAPT/3, and make sure that the weather radar display is correctly shown on the CAPT ND.  (1) If the weather radar display is correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).  (a) If the weather radar display is still incorrectly shown on the CAPT ND with the EIS DMC selector switch at NORM:  - do a check of the wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞34-41-00∞∞∞∞∞∞∞∞∞∞Page 202  Aug 01/05 CES 1 If there is no continuity:

_ - repair the above wiring.  2 If there is continuity: _  - do a check and repair the wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  (2) If the weather radar display is not correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 导航 NAVIGATION 3

原标题:
89 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 重磅!「2022设计师严选品牌 TOP10」活动启动

      ▲休闲区。图片来自:CBS58
  • 026期钟涛双色球预测奖号:小复式参考

      有关“美国制造”的新政策一出,不少美国媒体和企业都表达了忧虑。据美国《大西洋月刊》网站报道,由于实施“美国制造”,纽约市交通局在纽约第二大道地铁线的第一阶段建设中就花费了45亿美元,高昂的成本“令人汗颜”。
  • 李德林:华为复兴,苹果跌惨了

      目前人们已经能与AI展开对话、通过AI生成文本、图像、甚至高质量的视频,但问题在于,这些生成能力目前还处在较低水平,Sora还不够多,当幻觉与新鲜感散去,在C端难做突破的大模型们,该去哪里实现自己的价值?
  • 崔勇当选光大银行副董事长,国有大行工作经验丰富

      今年以来,药明康德股价连续大跌,就与海外因素相关。尽管公司接连发布澄清公告进行澄清,但潜在的风险还是让投资者担忧。股市回暖,抄底炒股先开户!智能定投、条件单、个股雷达……送给你海量资讯、精准解读,尽在新浪财经APP
  • 邦达亚洲:英脱欧取重大进展 英镑反弹收1.3000关口

      奇瑞控股集团副总经理、奇瑞商用车公司总经理鲍思语也在论坛上提到,汽车正在从传统的代步工具,逐步转化为移动的智能终端,为AI、人工智能、大数据等一些新型技术的制高点。上线的数据打破信息孤岛,提高快速决策能力,但面临着数据可篡改能力,数据可信问题。而区块链技术能够让其数据在生态系统中做到有效的访问,共享数据并保证数据真实有效,解决了信任问题,大幅度降低了沟通成本。
  • 蒋飞:中国货币需求函数

      写在最后:s1mple的主要失误
  • 夺冠后波奇享受啤酒浴 响尾蛇冬眠休养重头再来

      对于线上教学,老师们和学生们并不陌生。王笑晖表示,学校在此前已经积累了丰富的线上教学经验,老师们接到通知后就迅速进入状态,将系统账号等信息及时发放给学生,“按照账号登录进去,跟在校上课时一样的。”
  • 伊力夏提杨永强重回赛场 九月武汉WBO洲际争霸

      在这个以瘦为美的年代,天天喊着减肥的我们,自虐出马甲线、大长腿就是美么?这些外在的光彩到底能照亮我们多久呢?怎么才能拥有永恒之美?
  • 春潮渐起 ——解读央行第3季度货币政策执行报告

      俄罗斯国防部11日通报称,过去一天,俄军在多个方向占据更有利战线和阵地,击退乌军多次反攻,摧毁乌军包括美制“艾布拉姆斯”坦克等武器装备和弹药库、燃料库及无人机控制点,打击乌军人员和军事装备集结地以及外国雇佣兵临时部署点。
  • 任泽平:金融开放的成就、不足与变革

      3月11日,A股继续上行,上证指数刷新年内新高,创业板大涨4.6%,市场成交额再度超万亿元。从北上资金流向来看,净流入资金超百亿元。
  • 不差钱、产能过剩,圈钱照样毫不手软!星德胜IPO该不该被喷?

      于是,王女士打算拿去退换,这时才想起来自己还不清楚首饰的具体重量,她翻看购买凭证,发现上面并没有标明手镯的克重,首饰也没有标注克重的标签。
  • 海军陆战队女兵:训练晒黑了也很美 那是我的“勋章”

      对飞行人员、维修人员和专业人员的培训数据表明,空军已经丧失了对执行任务的关注。事实上,它现在处于历史上最差的战备状态。
  • 建立国有资产负债表报告审查制度

      我们冷静想一想,古今中外出现的那么多创新拔尖人才,是不是先选出来,再搁一个筐里按照一定的路线培养出来的?其实不是,而是这部分人拥有自己的独特思维方式,并有着对大自然、对社会的强烈好奇心,且能在自己参与世界发展时贡献自己的观点、创意。这些人有一个共同特点:他们为了自己的梦想、理想,或者因为对某个领域的狂热,可以不怕辛苦,穷其一生去追求。
  • 张卫健夫妇夜晚漫步街头 深情表白妻子张茜

      李勇坚认为,京东等企业不仅要对消费者负责,通过数字化、智能化的高效供应链为消费者提供高品质、安全、可靠的商品,还要与供应链上的企业进行深度合作,利用硬供应链和软供应链方面的能力,帮助企业提高效率,避免其受到经济下行压力的冲击。